Loading...
IM Inspection Worksheet_20-10-2023_08-15-12INSPECTION WORKSHEET (SEP-028454-2023) SEP-0592-2023Case Number:Case Module:Permit Management 10/20/2023 PassedInspection Status:Inspection Date: SepticInspection Type:Inspector:Mark Smith Job Address:Parcel Number:20 Mayflower Ln Kattskill Bay, NY 12844 227.6-1-6 Company Name NameContact Type Applicant Morning Star Excavation & Septic Contractor Morning Star Excavation & Septic Engineer Kevin Hastings Granted Permission Morning Star Excavation & Septic Primary Owner Kimberly Pfeiffenberger Checklist Item CommentsPassed Building Inspector Notes True 10/11/23 partial approval for replacement septic system. - a new 1000 gallon septic tank with filter at outlet baffle and 64' of eljen absorbtion trenches. submit certified as built for final approval. 10/20/23 final inspection for septic system approved. -As built drawing and letter of completion received Roof gutters don't discharge over leach field True Waterline separation distance True Building to Tank True existing [Provide extension collar if Yes]True Tank to Distribution Box True 4"sdr 35 Opening Sealed:True End Cap True ends are looped with a vent Absorbtion Fields: Total Length True to 32' absorption trenches of eljen mats. Foundation to Tank True 19.5' Engineer Report and As-Built True provide certified as built drawing 10/20/23 received. Inlet & Outlet manholes 12"+ below grade True Type of Water: Municipal / Well Water True lake water supply Locations / Separations True Depth of Trenches True 30/36" Length of Each Trench True to 32' absorption trenches of eljen mats. System Use Status True system approved for use Conforms as per Plot Plan True Size of tank True 1000 gallon Distribution box to Field / Pit True 4" sdr 35 to eljen mats Foundation to Absorption True 20' InletOutlet Pipes & Baffles True filter at outlet baffle Soil Type: Loam True October 20, 2023 Page 1 of 1