IM Inspection Worksheet_20-10-2023_08-15-12INSPECTION WORKSHEET (SEP-028454-2023)
SEP-0592-2023Case Number:Case Module:Permit Management
10/20/2023 PassedInspection Status:Inspection Date:
SepticInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:20 Mayflower Ln
Kattskill Bay, NY 12844
227.6-1-6
Company Name NameContact Type
Applicant Morning Star Excavation & Septic
Contractor Morning Star Excavation & Septic
Engineer Kevin Hastings
Granted Permission Morning Star Excavation & Septic
Primary Owner Kimberly Pfeiffenberger
Checklist Item CommentsPassed
Building Inspector Notes True 10/11/23 partial approval for replacement septic system.
- a new 1000 gallon septic tank with filter at outlet baffle and 64' of
eljen absorbtion trenches.
submit certified as built for final approval.
10/20/23 final inspection for septic system approved.
-As built drawing and letter of completion received
Roof gutters don't discharge over leach field True
Waterline separation distance True
Building to Tank True existing
[Provide extension collar if Yes]True
Tank to Distribution Box True 4"sdr 35
Opening Sealed:True
End Cap True ends are looped with a vent
Absorbtion Fields: Total Length True to 32' absorption trenches of eljen mats.
Foundation to Tank True 19.5'
Engineer Report and As-Built True provide certified as built drawing
10/20/23 received.
Inlet & Outlet manholes 12"+ below grade True
Type of Water: Municipal / Well Water True lake water supply
Locations / Separations True
Depth of Trenches True 30/36"
Length of Each Trench True to 32' absorption trenches of eljen mats.
System Use Status True system approved for use
Conforms as per Plot Plan True
Size of tank True 1000 gallon
Distribution box to Field / Pit True 4" sdr 35 to eljen mats
Foundation to Absorption True 20'
InletOutlet Pipes & Baffles True filter at outlet baffle
Soil Type: Loam True
October 20, 2023 Page 1 of 1