IM Inspection Worksheet_24-10-2023_12-01-33.pdf Illl 111 IIII llllllll llllll4l lllllllllllllll IIIIIII llllllllllllllllllll 111111111 fill���� �����lull fill llllllll���1�1 ll`1�1 llllllll fill IIIII IIIIIIUUUIII IIIIIIIIIIIIIII lllllllllllll4l IU llllllll lllllllllllllll 1111111111U IIII fill �1� 11111111 111 ���� lull ���� 1�l ll l l ll ll U l l l l ll l l Il l� i l l ll I l l ll l U l ll 11ll�ll ll llllllll Case Number: SEP-0653-2023 Case Module: Permit Management
Inspection Date: 10/18/2023 Inspection Status: Partial Pass
Inspector: Mark Smith Inspection Type: Septic
Job Address: 8 Wintergreen Rd Parcel Number: 309.5-1-25
Queensbury, NY 12804
Contact Type Company Name Name
Applicant Morning Star Excavation &Septic
Contractor Morning Star Excavation &Septic
Engineer Harlan-McGee of North America
Granted Permission Morning Star Excavation &Septic
Primary Owner Beth Cummings
Checklist Item Passed Comments
Building Inspector Notes True 10/18/23 partial approval for septic system
-existing 1000 gallon septic tank with 200'of pipe and stone was
installed
remaining items
- provide certified as built drawing from design engineer.
Soil Type: Sand_ True
Size of Stone True #2
Roof gutters don't discharge over leach field True
Waterline separation distance True
Building to Tank True existing
Tank to Distribution Box True 4"sdr 35
Opening Sealed True
End Cap True
Absorbtion Fields: Total Length True 4 laterals at 50'each 200'total
Septic system field above flood plain True
Foundation to Tank True 14'
Engineer Report and As-Built False provide certified as built drawing from design engineer.
Location of system on property True
Type of Water: Municipal/Well Water True municipal water supply
Locations/Separations True
Depth of Trenches True 20"
Length of Each Trench True 4 laterals at 50'each, 200'total
System Use Status True system approved for use
Conforms as per Plot Plan True
Distribution box to Field/Pit True 4"sanitary lines
Foundation to Absorption True 22'
InletOutlet Pipes& Baffles True
October 24,2023 Page 1 of 1