IM Inspection Worksheet_24-10-2023_12-17-44INSPECTION WORKSHEET (RPLUM-028485-2023)
RC-0533-2022Case Number:Case Module:Permit Management
10/24/2023 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:6 Alessia Dr
Queensbury, NY 12804
315.10-1-45
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Granted Permission Cerrone Builders Inc
Primary Owner Cerrone Builders Inc
Checklist Item CommentsPassed
Building Inspector Notes False
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False not yet installed
Cleanout every 100 feet change of direction True
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
Drain Vent True
Permit Card Visible From Road True
October 24, 2023 Page 1 of 1