IM Inspection Worksheet_13-09-2023_12-46-55INSPECTION WORKSHEET (BINS-027695-2023)
RC-0612-2022Case Number:Case Module:Permit Management
09/13/2023 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:7 Mountainview Ter
Lake George, NY 12845
289.6-1-7.1
Company Name NameContact Type
Applicant John Hughes
Designer Gary Hughes
Granted Permission John Hughes
Primary Owner John M. Hughes Trust
Checklist Item CommentsPassed
Building Inspector Notes False
U Factors = .3 cfm for windows, .5 cfm for doors True
Insulation under bow & bay window(s)False
Tub Shower R-20 with Vapor Barrier True
Exterior wall outlets sealed True
All Return Air Hard Duct Work False
Duct work sealed properly / No duct tape False not completed
Duct Testing Outside Conditioned Space False N/A
House Wrap Taped at all Seams False
Door / Window Sealed (No Insulation)False
Air Seal Outside Penetrations True
All Ductwork Sealed Return and Supply False
Air Barrier behind Knee Walls False
Blower Door Test False
Duct Insulation - if required in unheated spaces False
15 min thermal barrier/intumescent paint applied False
Tyvek or Similar Exterior Sealant True
Combustion Air Supply for Furnace False
Window Sealing False
Duct Blaster Test for duct work, R-8, unhtd spaces False
Permit Card Visible From Road False
Proper Vent, Attic Vent True
Insulation ResCheck ComCheck True R 49 @ ceiling cathedral area, remainder to be blown in / R 21 @
walls
September 13, 2023 Page 1 of 1