Loading...
IM Inspection Worksheet_25-10-2023_13-28-58INSPECTION WORKSHEET (COMFIN-028420-2023) CC-0374-2023Case Number:Case Module:Permit Management 10/25/2023 FailedInspection Status:Inspection Date: Commercial Final InspectionInspection Type:Inspector:John O'Brien Job Address:Parcel Number:1012 State Rte 9 Queensbury, NY 12804 296.13-1-62 Company Name NameContact Type Applicant Jonathan LaRock Granted Permission Peter Shabat Primary Owner Peter Shabat Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle False Handicapped Ramps False Final Survey False Building Inspector Notes False 10/25/23 final commercial inspection not approved, please address the items listed below and call for recheck. - Provide proof of final electrical inspection. - install switch plates at all receptacles, outlet with switch will need to be moved from kitchen floor and properly fastened. - Insulation behind walk in coolers need to be cleaned up/ reinstalled. - cover insulation in ceiling behind walk in coolers, install 22" x 30" attic access that is insulated equal to ceiling insulation with a gasket seal. - install lever type door hardware at all interior doors. - install cap on open sanitary drain observed in basement. - several leaks were observed in basement plumbing while conducting a flow test. Both supply and sanitary drains were observed to be leaking. - repair open soffits and holes in the siding as discussed on site. - complete Fire Marshals items. - Complete all plumbing work, drain for sink in kitchen not completed. Bldg Access All Sides 20ft Drivable Surface False H/C rear grab bar 36" with 24" to open side False Backflow Preventors where required False Public Toilet Room Handicapped Accessible False Exterior timer for exterior lighting False Hydraulic Elevators: Oil Seperator REQUIRED False Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire Doors False Handicap parking striping False Boiler/Furnace Enclosurer Fire Ext System False Int/Ext Balusters 4 inch Spacing Platform Decks False Bldg Num or Tenant Address on Bld or Drive False Ramps: 12" extension top & bottom False Attic Access Insulation = Attic R- Value False Individual storage units 5% of each type False Gas Shut-off Exposed & Regulator 12" min abv grd False October 25, 2023 Page 1 of 3 INSPECTION WORKSHEET (COMFIN-028420-2023) Checklist Item CommentsPassed Water Fountain or Cooler False As-built Septic System Layout Required False Public Sewer Sign-Off False Bollard Protection:4' on ctr/3' abv grd, gas meter False Handicapped Service Counters 34 inch False Gas Furnace Shut Off False 12" beyond top & bottom False Int/Ext Guardrails 42 inch Platform Decks False H/C side & rear grab bars 36" above floor False HVAC air balancing report False H/C sinks 34" above floor False Hydraulic Elevators: Non-comb. Plumbing REQUIRED False Wood deck: 2'+ from grade dia bracing required False Low Water Shut Off for Boilers False H/C 18" minimum vertical grab bar False Engineer or Architect Approval False Ramps: 6" or more need handrails False Hot water drain pan to indirect waste False Chimney Rain Cap Installed False Foam in basement/attics covered w/thermal barrier False Oil Furnace Shut-Off at Entrance to Furnace Area False H/C grab bar: 42" side, 12" from center False Ceiling Fire Stopping, 3,000 sq. ft. Wood Frame False OK to Issue C/O False Chimney / B Vent / Direct Vent Location False HVAC Vent Terminal 10' from Lot Line & Openings False Attic Access Gasketed False Jack posts in basement lagged at top and bottom False Bottled or cooler water provided False Smoke Vents Or Fan, if required False Crawl space/knee wall access insulated & gasketed False Bollard Protection: 15" footings & 3' below grade False Propane Tank: Proper Setback from Prop Line/Struct False Universal Symbol of Access displayed False Final Electrical / Flex Gas Piping Bonded False Blower Door Test False Electronic as-builts False Doors 36 inch wLever Hand Panic Hardware, if req False CSST/other piping in conduit if buried,if required False H/C mirrors 40" above floor False Attic Access 30 x 20 x 30 (h)False Ext Finish /Grade Complete/6 in 10ft or Equivalent False October 25, 2023 Page 2 of 3 INSPECTION WORKSHEET (COMFIN-028420-2023) Checklist Item CommentsPassed Occupancy sensor lighting control False Stockroom /Storage/Receiving/Shipping Room False Step risers: riser 7" & treads 11"False Vestibules for Exit doors greater than 3000 sq. ft False Elevator Operation and Signage Shaft Sealed False Handicapped Bath/Parking Lot Signage False H/C toilet flush handle on open side False Exits At Grade Or Platform 36 (w) x 44 (l)False Floor Bathroom Watertight Other Floors Okay False Ramps: 4" toe kick each side of ramp False Active Listening System and Signage Assembly Space False Relief Valve ,Heat Trap/Water Temp 110 deg or less False Special Inspections False Elevator Hoistways Pressurized False ¾ Hour Corridor Doors & Closers False OK to Issue Temporary C/O False Plumbing Vent Through Roof/Roof complete False H/C vertical grab bar 39" from floor and corner False Handicapped water cooler installed False Stair rail 34"–38": both sides of stairway False Outside Spigots have Air Gap False Handicapped Units False Pull down stairs boxed out and insulated False Site Plan Variance required False October 25, 2023 Page 3 of 3