IM Inspection Worksheet_26-10-2023_15-29-09INSPECTION WORKSHEET (ASFINAL-028573-2023)
AST-0390-2022Case Number:Case Module:Permit Management
10/26/2023 Partial PassInspection Status:Inspection Date:
Accessory Structure FinalInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:708 Quaker Rd
Queensbury, NY 12804
303.15-1-12
Company Name NameContact Type
Applicant TWAS QUAKER ROAD LLC
Engineer Jarrett Engineers, PLLC
Granted Permission TWAS QUAKER ROAD LLC
Primary Owner TWAS QUAKER ROAD LLC
Checklist Item CommentsPassed
Building Inspector Notes True 8/29/23 Final inspection for accessory structure not approved,
please address the items listed below and call for recheck when
ready.
-provide special inspection reports.
-provide third party engineer sign off for the two steel canopies.
-provide a letter of substantial completion from design engineer.
-provide proof of final electrical inspection.
-complete Fire Marshals items.
- A final inspection by Code Compliance Officer Bruce Frank will
be required.
10/26/23 partial approval for final commercial inspection.
- Approved for temporary C.O. only
- complete site work and final inspection from Code Compliance
officer Bruce frank for final approval
Engineer or Architect Approval True 10/26/23 received
Fin Elect; Energy Saving Light Bulbs 90 Percent True
OK to Issue C/O False
Okay To Issue CC False
October 26, 2023 Page 1 of 1