IM Inspection Worksheet_30-10-2023_11-57-52INSPECTION WORKSHEET (FDTN-028610-2023)
RC-0533-2022Case Number:Case Module:Permit Management
10/30/2023 PassedInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:6 Alessia Dr
Queensbury, NY 12804
315.10-1-45
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Granted Permission Cerrone Builders Inc
Primary Owner Cerrone Builders Inc
Checklist Item CommentsPassed
Building Inspector Notes False
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True for frost wall / with vertical dowels one row # 4 TOW / 8/18 /23 for
remainder of foundation
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing True approved
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True approved
Footing Drain stone - 6 mil poly False
Piers True
Backfill Approval True
Rough Grade 6 inch drop within 10 ft.True
Foundation Insulation Interior / Exterior True at walk out 2" foam
Reinforcement in Place True 2 rows # 4
Reinforcement in Place True 2 rows # 4 horizontally
Permit Card Visible From Road True
Poly Under Slab True approved 8/30/23
October 30, 2023 Page 1 of 1