IM Inspection Worksheet_30-10-2023_12-00-46INSPECTION WORKSHEET (FRM-028611-2023)
RC-0533-2022Case Number:Case Module:Permit Management
10/30/2023 PassedInspection Status:Inspection Date:
Building FramingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:6 Alessia Dr
Queensbury, NY 12804
315.10-1-45
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Granted Permission Cerrone Builders Inc
Primary Owner Cerrone Builders Inc
Checklist Item CommentsPassed
Building Inspector Notes False 10/4/23 partial approval for framing.
- ice and water shield approved
Air Seal all Plates and Sills True
Joist hangers True
Exterior wall outlets sealed True
20 in. (W)True
24 in. (H)True
Air Seal All Registers at Floor True
Anchor Bolts 6 ft. or less on center True
Ice and water shield 24 inches from wall True 10/4/23 partial approval for framing.
- ice and water shield approved
Bath fans connected to exterior vent True
12 O.C.True
Air Sealing all Joints Before Insulation True verified 10/30/23
5.7 sf above below grade True walk out
Truss Specification Provided True
Windows Habitable Space Bedrooms True
Bracing Bridging True
Garage portal framing True
Deck (post beam connections hex head bolts)True
Jack Studs Headers True
Jack Posts Main Beams True
Attic Access 22 x 30 minimum True
Soffits-Insulation Baffel True
Exterior sheeting nailed properly True
Hurricane Clips/Uplift Screws/Nail Holes Filled True
Permit Card Visible From Road True
Framing True rough framing approved
Headroom 6 ft. 8 in.True
October 30, 2023 Page 1 of 1