Loading...
IM Inspection Worksheet_30-10-2023_12-00-46INSPECTION WORKSHEET (FRM-028611-2023) RC-0533-2022Case Number:Case Module:Permit Management 10/30/2023 PassedInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:6 Alessia Dr Queensbury, NY 12804 315.10-1-45 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Granted Permission Cerrone Builders Inc Primary Owner Cerrone Builders Inc Checklist Item CommentsPassed Building Inspector Notes False 10/4/23 partial approval for framing. - ice and water shield approved Air Seal all Plates and Sills True Joist hangers True Exterior wall outlets sealed True 20 in. (W)True 24 in. (H)True Air Seal All Registers at Floor True Anchor Bolts 6 ft. or less on center True Ice and water shield 24 inches from wall True 10/4/23 partial approval for framing. - ice and water shield approved Bath fans connected to exterior vent True 12 O.C.True Air Sealing all Joints Before Insulation True verified 10/30/23 5.7 sf above below grade True walk out Truss Specification Provided True Windows Habitable Space Bedrooms True Bracing Bridging True Garage portal framing True Deck (post beam connections hex head bolts)True Jack Studs Headers True Jack Posts Main Beams True Attic Access 22 x 30 minimum True Soffits-Insulation Baffel True Exterior sheeting nailed properly True Hurricane Clips/Uplift Screws/Nail Holes Filled True Permit Card Visible From Road True Framing True rough framing approved Headroom 6 ft. 8 in.True October 30, 2023 Page 1 of 1