Loading...
IM Inspection Worksheet_30-10-2023_11-49-12INSPECTION WORKSHEET (RPLUM-028586-2023) RC-0275-2023Case Number:Case Module:Permit Management 10/30/2023 PassedInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:81 Assembly Point Rd Lake George, NY 12845 239.12-2-27 Company Name NameContact Type Applicant John Clarke Architect Flynn Design Studios LLC Contractor J. Clarke Constructiion Granted Permission G. THOMAS MOYNIHAN JR Primary Owner Joan Moynihan Checklist Item CommentsPassed Building Inspector Notes True rough plumbing approved Pressure Test True Pressure Test True 3" Vent Through Roof - 18" min True Washing Machine Drain 2 inch minimum True All Return Air Hard Duct Work True 5 psi or 10 ft. above highest conn. for 15 minutes True Rough Plumbing / Nail Plates True Shower liner test (2" of water)False Water Supply Piping True Duct work sealed properly True Cleanout every 100 feet change of direction False Plumbing Vent Vents in Place True Air Test Gas Piping 10 psi for 10 Minutes False propane Washing Machine Trap: 18"-42" discharge True Air Head True Air Head True 50 P.S.I for 15 minutes True Drain Vent True Permit Card Visible From Road True October 30, 2023 Page 1 of 1