Loading...
IM Inspection Worksheet_26-10-2023_12-37-43INSPECTION WORKSHEET (SEP-028552-2023) SEP-0074-2023Case Number:Case Module:Permit Management 10/26/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:11 Duncan Cv Queensbury, NY 12804 226.16-1-5 Company Name NameContact Type Applicant Deborah Purcell Contractor Crandall Excavating Engineer Environmental Design Partnership (EDP) Granted Permission Barbara D'Agostino Primary Owner Barbara D'Agostino Checklist Item CommentsPassed Building Inspector Notes True partial inspection / 4 rows ELJEN bio matts / returned 10/26 for completion of system, please provide engineer report and final electric Soil Type: Sand True ETU Maintenance Contract provided False N/A Size of Stone False N/A Final Electrical False provide final electrical Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]False Tank to Distribution Box True 2" force main to 4" SDR 35 Opening Sealed:True 90% alarm level activates True End Cap True Absorbtion Fields: Total Length True 132ft Septic system field above flood plain True Foundation to Tank True crawl area 11ft Engineer Report and As-Built False please provide engineer asbuilt report Sump pump not connected to septic system True Location of system on property True see specs Type of Water: Municipal / Well Water True Lake Locations / Separations True Depth of Trenches True matts sit atop washed sand / see specs Length of Each Trench True ELJEN matts 4 rows @ 32 ft System Use Status True Conforms as per Plot Plan False placement of tanks Size of tank True 1250 gallon Distribution box to Field / Pit True 4" sewer and drain perforated Foundation to Absorption True 28+ft InletOutlet Pipes & Baffles True effluent filter October 26, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-028552-2023) Checklist Item CommentsPassed 50% alarm level activates True October 26, 2023 Page 2 of 2