Loading...
IM Inspection Worksheet_25-10-2023_15-22-04INSPECTION WORKSHEET (SEP-028528-2023) SEP-0074-2023Case Number:Case Module:Permit Management 10/25/2023 Partial PassInspection Status:Inspection Date: SepticInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:11 Duncan Cv Queensbury, NY 12804 226.16-1-5 Company Name NameContact Type Applicant Deborah Purcell Contractor Crandall Excavating Engineer Environmental Design Partnership (EDP) Granted Permission Barbara D'Agostino Primary Owner Barbara D'Agostino Checklist Item CommentsPassed Building Inspector Notes True partial inspection / 4 rows ELJEN bio matts Soil Type: Sand True ETU Maintenance Contract provided False Size of Stone False N/A Final Electrical False Waterline separation distance True Building to Tank True 4" SCHD 40 [Provide extension collar if Yes]False Tank to Distribution Box True 2" force main to 4" SDR 35 Opening Sealed:True 90% alarm level activates False End Cap True Absorbtion Fields: Total Length True 132ft Septic system field above flood plain True Foundation to Tank False Engineer Report and As-Built False Sump pump not connected to septic system True Water shut off activates at 90% full False Location of system on property False Inlet & Outlet manholes 12"+ below grade False Type of Water: Municipal / Well Water False Lake Locations / Separations False Depth of Trenches True matts sit atop washed sand / see specs Separation of Pits False Length of Each Trench True ELJEN matts 4 rows @ 32 ft System Use Status False Conforms as per Plot Plan False Size of tank False Distribution box to Field / Pit True 4" sewer and drain perforated October 25, 2023 Page 1 of 2 INSPECTION WORKSHEET (SEP-028528-2023) Checklist Item CommentsPassed Foundation to Absorption False InletOutlet Pipes & Baffles True 50% alarm level activates False October 25, 2023 Page 2 of 2