IM Inspection Worksheet_01-11-2023_13-10-26INSPECTION WORKSHEET (BINS-028625-2023)
RC-0533-2022Case Number:Case Module:Permit Management
11/01/2023 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:6 Alessia Dr
Queensbury, NY 12804
315.10-1-45
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Granted Permission Cerrone Builders Inc
Primary Owner Cerrone Builders Inc
Checklist Item CommentsPassed
Building Inspector Notes True for air sealing / air baffles 10/30/23
U Factors = .3 cfm for windows, .5 cfm for doors True
Tub Shower R-20 with Vapor Barrier True
Exterior wall outlets sealed True
All Return Air Hard Duct Work True
Duct work sealed properly / No duct tape True
House Wrap Taped at all Seams True
Door / Window Sealed (No Insulation)False remove insulation at walkout slider and windows basement area
Air Seal Outside Penetrations True
All Ductwork Sealed Return and Supply True
Air Barrier behind Knee Walls True
Blower Door Test False provide for C/O
15 min thermal barrier/intumescent paint applied False
Tyvek or Similar Exterior Sealant True
Combustion Air Supply for Furnace False
Window Sealing True
Permit Card Visible From Road True
Proper Vent, Attic Vent True
Insulation ResCheck ComCheck True R 21 @ walls / verify blown in at final for ceiling
November 01, 2023 Page 1 of 1