Loading...
2.5 2.5 WASTEWATER-SEWER\Set PURies-Replacement—Groundwater Below Surface Share Builtup Mounded System With Neighboring Property Eberlem to Dwelling—In APA-11-6- 2023 RESOLUTION SETTING PUBLIC HEARING ON SEWAGE DISPOSAL VARIANCE APPLICATION OF DAVID AND THERESA RIES RESOLUTION NO.: ,2023 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Queensbury Town Board serves as the Town's Local Board of Health and is authorized by Town Code Chapter 136 to issue variances from the Town's On-Site Sewage Disposal Ordinance, and WHEREAS, David and Theresa Ries (Applicants) have applied to the Local Board of Health for variances from Chapter 136 for installation of an on-site subsurface wastewater treatment system, specifically a mounded soil absorption system, to be located on Applicant's property located at 12 Seeyle Road North to serve both 12 Seelye Road North and 8 Seelye Road North in the Town of Queensbury,with the: 1. Groundwater table to be 6" below the ground surface in lieu of the required 3' below ground surface; 2. Fill or built-up system to be located 13' from the dwelling in lieu of the required 20' setback; NOW, THEREFORE, BE IT RESOLVED, that the Town of Queensbury Local Board of Health will hold a public hearing on Monday, November 20t", 2023 at 7:00 p.m. at the Queensbury Activities Center, 742 Bay Road, Queensbury, to consider David and Theresa Ries' sewage disposal variance application concerning property located at 8 Seeyle Road North in the Town of Queensbury (Tax Map No.: 227.17-1-24) and at that time all interested persons will be heard, and BE IT FURTHER, RESOLVED, that the Local Board of Health authorizes and directs the Queensbury Town Clerk to publish the Notice of Public Hearing presented at this meeting and send a copy of the Notice to neighbors located within 500 feet of the property as required by law. Duly adopted this 6t'day of November, 2023,by the following vote: AYES NOES ABSENT: SEPTIC VARIANCE• Office Use Only Permit#: APPLICATION Permit Fee:$ Torn of Quccnsbury Invoice#: 742 Bay Road,Queensbury,NY 12804 � 2 3 4 S 6, P:518-761-8256 www.queensburv.net Approvals: ft. sr CEN5) Submittal: 1 (one) original &8 copies of the completed applic n pomCage 2023 PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN IL Q��� Sav OER�CS4. pFFICE Section 1: 9s Nre Contact Information: David and Theresa Ries Owner's Agent: Studio A Landscape Architecture 8.Engineering DPC Property Owner(s): Address: 23 Pinehurst Lane Address: 38 High Rock Ave. Suite 3 PO Box 272 Slingerlands, NY 12159 Saratoga Springs, NY 12866 Phone#: Phone#: 518-450-4030 Email: David@terranovabi.com Email: mhuntington@studioadpc.com Section 2: Site Information: Site Address: 8 Seelye Rd North Tax ID#: 227.17-1-24 Directions to Site: East on Rockhurst Rd to Seelye Rd. North Section 3: Distance from well on property to septic system (if applicable) NSA feet Section 4: Is it possible to install a conforming septic system on this property? ❑Yes 0 No If YES, please explain and attach a diagram: Section 5: Does the proposed system meet setback requirements for distance from wells&septic systems on neighboring properties? Dyes ❑ No If NO, please explain: Section 6: Is the proposed system to be installed under a parking area? ❑Yes D No Section 7: Section of the Sanitary Sewage Ordinance from which you are seeking the variance(i.e. leaching system will be 89 ft. from well in lieu of required 100 ft.): 1.Town Code Section: 136-10(B)(1) - Groundwater @ 6" BGS 2. Town Code Section 136 appendix A- Fill or built up system Septic Variance Application 13' from dwellir 'ised December 2021 Section 8: List the names, parcel addresses, and tax map numbers of all adjoining property owners. You may obtain this information from the Town of Queensbury's Assessor's Office: North Name Geraldine Eberlein George Russo Address 12 Seelye Rd. North 16 Waters Edge Dr. Tax Map ID 227.17-1-25 227.17-1-27 South Name Ruditsky Property Management, LLC George Rexford Moon Address 62 Seelye Rd 50 Seelye Rd Tax Map ID 227.17-2-20 227.17-2-21 East Name Robert End Address 8 Waters Edge Drive Tax Map ID 227.17-1-31 West Name East Lake George House LLC Address 9 SEELYE RD. NORTH Tax Map ID 227.17-1-60 Section 9: OWNER STATEMENT I/We do hereby relieve the Town of Queensbury from any liabilities on the plumbing and septic system located at: 8 Seelye Rd.N . I/We realize that putting the well, septic tank or leaching system less than the required 20 feet from the building foundation may increase the risk of pollution. David Ries and Theresa Ries ::::::::::luar::e: tQ ' i � 1050/ Date: n lc,p 3 Section 10: NEIGHBOR OR TENANT RELEASE STATEMENT(if applicable) I/We do hereby relieve the Town of Queensbury from any liabilities on the plumbing and septic system located at: . I/We realize that putting the well, septic tank or leaching system less than the required feet from the may increase the risk of pollution. Neighbor/Tenant—Print Name: Neighbor/Tenant-Signature: Date: Septic Variance Application Revised December 2021 PLEASE ATTACH THE FOLLOWING TO YOUR APPLICATION: 1. A location map showing the site within the Town of Queensbury 2. A plot plan showing existing and proposed features of the property, including: a. Lot dimensions b. North arrow and scale: 1 inch=40 feet c. Location & dimensions of existing and proposed buildings, showing setback distances and uses d. Parking layout to scale (if applicable) e. Physical features (street,steep slopes, lakes, wetlands, etc.) f. Location of all wells and septic systems on neighboring properties g. Adjacent ownerships h. All properties within 500 feet A sample plot plan and location are shown below: --•; \� ,r/ ./� ',Sum{,N La i+cn Idct _c 1, a J/ If/ 1 •.L..l. , I ant !rv, `°``t I::.I �`� PM �ti �F` ,/ 'tom °,7V ' 41 r!/ , '4 \ ' �,c SJ' .1 W.T7 nice 145t 1 P Pc- 3/4. fie an. v_ -.S! SUM S O{ aZ I 0 RSii Patul0lF.I �7rwnd Ou4_.t►I)1oAn tlnear y , _ 1 Ai • _---r__ i _ -rw ' _ am` ---___ iIHa:uM tl Septic Variance Application Revised December 2021 Section 11: AUTHORIZATION AND SIGNATURE PAGE This page includes the Authorization to Act as Agent form, engineering fee disclosure, authorization for site visits, other permit responsibilities and agreement to provide documentation required. Complete the following if the OWNER is using an Agent: Owner's Name: David and Theresa Ries Studio A Landscape Architecture& Designates: as agent regarding the Septic Variance for Engineering,DPC 8 Seelye Rd North Site Address: 8 SEELYE RD N Tax Map#: 227.17-1-24 Engineering Fee Disclosure: Applications may be referred to the Town consulting engineer for review of septic design, storm drainage, etc. as determined by the Town Board of Health. Fees for engineering review services will be charged directly to the applicant. Authorization for Site Visits: By signing this page and submitting the application materials attached herein,the Owner, Applicant and his/her/their agent hereby authorize the Town Board of Health, building and code Enforcement Officers and Town Engineer to enter the subject properties for the purpose of reviewing the application submitted. Please Note: Other permits may be required for construction or alteration activity subsequent to approval by the Town Board of Health. It is the applicant's responsibility to obtain any additional permits. Official Meeting Minutes Disclosure: It is the practice of the Town Board of Health to have a designated stenographer tape record the proceedings of the meetings resulting from the application, and that the minutes transcribed from those tapes constitute the official record of all proceedings. If there is a discrepancy between such record and the handwritten minutes taken by the designated stenographer,the handwritten minutes shall be deemed the official record. I, the undersigned, have thoroughly read and understand the instructions for submission; agree to the submission requirements and completed checklist: David Ries Theresa Ries OWNER—PRINT NAME: OWNER—SIGNATURE: ( DATE: v 1 0 19 AGENT—PRINT NAME: Matthew Huntington AGENT—SIGNATURE: DATE: 10/16/2023 Septic Variance Application Revised December 2021 \IS TERMS FOR PROPOSED AGREEMENT FOR SEPTIC SYSTEM (to be done prior to the actual easement,being prepared and,signed) Terms for proposed Agreement between David K. Ries & Theresa M. Ries, (owners of 8 Seelye Road N., Queensbury, NY 12804) and Geraldine Eberlein (owner of 12 Seelye Road N., Queensbury, NY 12804), which would allow for creation of an Easement for installation of a septic system on 8 Seelye Road N., Queensbury, NY that would service the premises at 12 Seelye Road N., Queensbury, NY. COST OF DESIGN AND INSTALLATION OF SEPTIC SYSTEMS &STORMWATER DRAINAGE SYSTEM 1. Eberlein shall pay for the design and installation of the new septic system for 12 Seelye Road N., per Studio A Engineer's updated septic system plans, including installation of the tank, piping,junction and distribution boxes, leechfield and mound. Further, this shall include the delivery and distribution of the fill, including any excess fill that may be needed and/or required by the Town of Queensbury, for the system at 12 Seelye Road N. 2. Ries shall retain Studio A Engineer for engineering and design plans for new/updated septic system for 8 Seelye Road N., including installation of the tank, piping,junction and distribution boxes, leechfield and mound. Further, this shall include the delivery and distribution of the fill, including any excess fill that may be needed and/or required by the Town of Queensbury, for the system at 8 Seelye Road N. 3. Eberlein shall pay for the materials and installation of the drainage system as outlined in the drawings made by Studio A Engineering. Future maintenance and repairs will be at Eberlein's expense. COST OF MAINTENANCE AND REPAIRS TO EACH SEPTIC SYSTEM 4. Eberlien shall undertake any and all maintenance, including, but not limited to repairs to the Septic system designated for 12 Seelye Road N. Maintenance shall also include the following: a. The cost to mow and landscape the area for the septic system for 12 Seelye Road N.; including any additional landscaping that may be required by the Town Board for issuance of the variance. b. The underground portions of the septic system, including but not limited to the lines and junction box. 5. Ries shall undertake any and all maintenance, including, but not limited to repairs to the Septic system designated for 8 Seelye Road N. Maintenance shall also include the following: c. The cost to mow and landscape the area for the septic system for 8 Seelye Road N. d. The underground portions of the septic system, including but not limited to the lines and junction box. 6. In the event there are any operational problems, issues and/or repairs that arise with the septic system at 8.Seelye Rd N and/or 12 Seelye Road N., the owner of the property experiencing the issues must immediately undertake, within at least three (3) days from discovery of the issue, for remediation and/or repair by a licensed septic contractor, at that party's expense. a. In the event said problems also affect the proper operation of the other septic system, the party will also undertake any repairs to enable proper operation of the septic system, at said party's expense. b. In the event either party fails to address the necessary repairs or remediation, which may also cause damages to the other septic system, that party may undertake the repairs or remediation and will be immediately reimbursed by the other party accordingly. c. In the event any problems or issues arise that also impact and/or affect the adjoining/abutting properties to the septic system areas, the party whose system creates the issue assumes responsibility for any costs and remediation of issues with those properties and shall hold the other party harmless from any and all liability, damages and/or injuries that are incurred. The:.parties'agree:Met an additional agreenient.will be-,simultaneously..executed:with. respect to the construction,of the home at 12.Seelye Road N and adjustment of the current easement granted..to &Seelye Road'N:,for:access:to the dock:...The.:terms :areio:'be as:follows; PROPOSED AGREEMENT FOR CONSTRUCTION OF HOME AT 12.SEELYE RD Nand AMENDED EASEMENT TO DOCK(A,separate agreement'to be' simultaneously:,executed with the above.agreement.for the 7. Eberlein agrees to modify the existing home construction plans for 12 Seelye Road N., so that the new foundation is two (2)feet from the existing telephone pole in the direction of the existing foundation. 8. Upon approval for construction of home on 12 Seelye Road is obtained from the Town, both parties agree that the existing dock access easement shall be amended. The access shall be amended from three (3) feet along the west fence line of 12 Seelye Road to three (3) feet along the east fence line of 12 Seelye. Eberlein shall create and maintain a footpath as part of this easement to allow for 8 Seelye Road to access the dock. 9. During excavation and construction of both the septic system area located on 8 Seelye Road N., as well as the construction on 12 Seelye Road N., Eberlein will insure that Ries will continue to have access to the dock for 8 Seelye Road N. Eberlein will insure that no construction equipment, materials, will block or j impede dock access for Ries. In the event Eberlein is notified that Ries is unable to access the dock due to construction equipment, materials or the like, Eberlein must immediately undertake to reinstate Ries' access to the dock. 10.Eberlein will insure that Ries will continue to have ingress and egress on Seelye Road N. (which is a public road), to access the property at 8 Seelye Road N. Eberlein will insure that no construction equipment, materials, etc. will block the road access. Further, Eberlein agrees that no construction equipment, materials and the like will be stored on 8 Seelye Road N. for purposes of construction of 12 Seelye Road N. Only the necessary materials and equipment necessary for installation of the septic system will be allowed on 8 Seelye Road N. In the event, equipment, materials and the like are on 8 Seelye Road N. without the knowledge and agreement of Ries, Ries will promptly notify Eberlein and Eberlein will undertake for the removal. In the event Eberlein fails to have the same removed, Ries may undertake for removal at Eberlein's expense. 11.Eberlein's liability insurance shall include coverage for any injuries and/or property damage to 8 Seelye Road N., due to the construction of the septic systems on 8 Seelye Road N. and construction of the home on 12 Seelye Road N. Eberlein shall hold Ries harmless and indemnify Ries for any damages and/or injuries that may occur to or caused by Eberlein, Eberlein's agents, contractors and/or licensees. EFFECT OF 2014 AGREEMENT ON PROPOSED SEPTIC AGREEMENT AND EASEMENTS In the event the Town grants approval of the septic variance and construction of the home, the 2014 agreement would merge with the new septic easement, to be granted by Ries for the benefit of 12 Seelye Road N. Further, Eberlein would amend the current dock access easement as described above for the benefit of 8 Seelye Road N. In the event the Town does not grant approval of the septic variance but allows for construction of the home with an alternative septic system or septic system located on 12 Seelye Road N and Eberlein agrees and proceeds with that alternative system and construction of the home, the 2014 agreement remain in effect for a period of eight(8) years from the time the septic variance is denied. In the event the construction of the home would affect the current dock access easement as anticipated, Eberlein would amend the current dock access easement as described above for the benefit of 8 Seelye Road N. In the event the Town does not grant approval of the septic variance or the construction of the home,the 2014 septic agreement will remain in effect for a period of eight (8) years from the date the Town issues the denial of the variance applications. After that date, the 2014 agreement will be rescinded and revoked by the parties. Further, the parties do not need to grant the respective easements outlined in the agreement. IN WITNESS WHEREOF, the parties heteto.have sed t is agr ;t'to be executed as of this '' day of September, 2023. David K. Ries etesa . Ries Geraldine E'berlei studio LANDSCAPE ARCHITECIURE I B4GINEERING I PLANNING SEELYLE WASTEWATER PREPARED FOR GERALDINE EBERLEIN DAVID AND THERESA RIES 2 ESSEX ST 23 PINEHURST LANE MALTA, NY 12020 SLINGERLANDS, NY 12159 PROJECT TEAM LANDSCAPE ARCHITECT/CIVIL ENGINEER: STUDIO A LANDSCAPE ARCHITECTURE &ENGINEERING, D.P.C. 38 HIGH ROCK AVE, SUITE 3 I PO BOX 272 SARATOGA SPRINGS, NY 12866 CONTACT: KIRSTEN CATELLIER, RLA / MATTHEW HUNTINGTON, PE PHONE: 518.450.4030 ARCHITECT: WILLIAMS & WILLIAMS DESIGNERS, INC. 509 GLEN STREET GLENS FALLS, NY 12801 PHONE: 518-798-HOUSE(4687) SEPTIC VARIANCE REQUESTS I. TOWN CODE SECTION: 136-10(B)(1): REQ. GROUNDWATER TABLE: 3 FT. BELOW GROUND SURFACE EXIST. GROUNDWATER TABLE: 6 IN. BELOW GROUND SURFACE 2. PLACEMENT OF SYSTEM ON NEIGHBORING PROPERTY 3. TOWN CODE SECTION 136 APPENDIX A - REQ. EFFLUENT LINE SEPARATION DISTANCE TO PROPERTY LINE REQ. HORIZONTAL SEPARATION: 10 FT. PROVIDED HORIZONTAL SEPARATION: 0 FT. 4. TOWN CODE SECTION 136 APPENDIX A - REQ. SEPARATION DISTANCE FROM DWELLING REQ. HORIZONTAL SEPARATION: 20 FT. PROVIDED HORIZONTAL SEPARATION: 13 FT. ROAD RESIDENCE REPLACEMENT SYSTEM 8 & 12 SEEYLE ROAD NORTH, QUEENSBURY NY, 12804 GENERAL NOTES I. PRIOR TO COMMENCING ANY WORK, CONTRACTOR SHALL CONTACT U.F.P.O. AND THE PROPER LOCAL AUTHORITIES TO CONFIRM THE LOCATION OF ALL EXISTING UTILITIES. ANY COSTS INCURRED BY THE CONTRACTOR FOR FAILURE TO CONTACT THE PROPER AUTHORITIES SHALL BE SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. 2. THE GENERAL CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS AND REPORT ANY DISCREPANCY BETWEEN THE PLANS AND THE FIELD CONDITIONS TO THE OWNER'S REPRESENTATIVE. 3. CONTRACTOR SHALL VERIFY AND COORDINATE LOCATION OF ALL UTILITIES, INCLUDING BY NOT LIMITED TO LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC., WITH LOCATIONS OF PROPOSED SITE ELEMENTS. EXCAVATION REQUIRED PROXIMATE TO UTILITY LINES SHALL BE DONE BY HAND. ANY DAMAGE AND INCURRED COSTS DUE TO FAILURE OF THE CONTRACTOR TO ADHERE TO THESE GUIDELINES SHALL BE RESPONSIBILITY OF THE CONTRACTOR. 4. CONTRACTOR SHALL ESTABLISH PERMANENT BENCHMARKS PRIOR TO THE START OF CONSTRUCTION. ALL SECONDARY BENCHMARKS SHALL BE LOCATED SO THAT THEY WILL NOT BE DISTURBED DURING CONSTRUCTION. 5. LIMITS OF DISTURBANCE IS NOTED ON DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO OPERATIONS INSIDE AND OUTSIDE THE LIMITS OF DISTURBANCE. ANY AREAS OUTSIDE THE LIMITS OF DISTURBANCE THAT ARE DISTURBED SHALL BE RESTORED TO THE ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER. IF NO LIMITS OF DISTURBANCE IS SHOWN, PROPERTY LINE SHALL BE THE LIMITS OF DISTURBANCE. 6. CONTRACTOR SHALL EMPLOY CARE IN SCHEDULING CONSTRUCTION SO AS TO MAINTAIN EXISTING VEHICULAR TRAFFIC PATTERNS AND MINIMIZE DISRUPTION TO SURROUNDING PEDESTRIAN TRAFFIC. CONTRACTOR SHALL EMPLOY SPECIAL CARE TO PROTECT SAFETY OF PEDESTRIANS INSIDE AND OUTSIDE OF THE LIMITS OF DISTURBANCE. 7. VARIOUS PERMITS ARE REQUIRED FOR THIS PROJECT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL REQUIRED PERMITS FROM ALL JURISDICTIONS AFFECTED BY THIS WORK ARE IN PLACE PRIOR TO CONSTRUCTION. 8. ALL ALTERATIONS TO THESE DRAWINGS MADE IN THE FIELD DURING CONSTRUCTION SHALL BE RECORDED BY THE CONTRACTOR ON "AS -BUILT DRAWINGS," AS SPECIFIED. 9. CONTRACTOR SHALL MAINTAIN THE INTEGRITY OF ALL EXISTING INFRASTRUCTURE FOR THE DURATION OF CONSTRUCTION. SHEET INDEX STUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 L-0.00 COVER SHEET OFFICE LOCATION: L-0.10 EXISTING CONDITIONS 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 L-3.10 UTILITIES PLAN (518) 450-4030 L-5.20 CONSTRUCTION DETAILS L-5.30 CONSTRUCTION DETAILS IS A VIOLATION OF NEW YORK STATE EIT DUCATION LAW FOR ANY PERSON, LANCES` THEY ARE ACTING UNDER THE DIRECTION OF < LICENSED PROFESSIONAL ENGINEER ARCHITECT, LANDSCAPE ARCHITECT, OR LANE SURVEYOR, TO ALTER ANY ITEM IN ANY WAY IF AN ITEM BEARING THE STAMP OF R LICENSEDPROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE OTATI0N 'ALTERED BY' FOLLOWED BY THEIF SIGNATURE, THE DATE OF SUCH ALTERNATION AND SPECIFIC DESCRIPTION OF THE ALTERATION. SEPTIC VARIANCE 10/18/2023 SSW' ncp, r ? a 0901 si NO w U IL Z U) Q z a w > � � U E_ w CL N N W N CD Q N o 00 0 ~ Z _ ry Lu O —! Z W � Q Z m w O >- Lu Of 0 >- 0 W Q W WW cL C7 N C3 w U Z w 0 cn w S ry O Z C) F-- Q w p w �- Z w 0W LU Qo otf C/) o U DATE: 5/9/2023 21113 DRAWING NO. L-0, 00 DWG I OF 5 See r m a Y C) U 1 r m z 1 a 0 � I 1 I \ 1 m z IU) w DIVERSION SWALE AROUND MOUND SYSTEM WETLAND BOUNDARY / DELINEATED BY THE ENDCAP, TYP. - ENVIRONMENTAL DESIGN PARTNERSHIP IN JULY 2022. / / / / PERFORATED PIPE TRANSITION TO SOLID PIPE Road North (Paved Drive)` - 200'L X 4"0 HDPE STORM PIPE OUTLET INV. EL. 321.0' / SLOPE @ 1% 62 46' 15" W CURTAIN DRAIN: 164-L X 4"0 -J PERFORATED PIPE IN I' W GRAVEL TRENCH 0 INLET INV. EL. 324.6' SLOPE @ 1% 4"0 PERFORATED LATERAL I N I' W \ RAVEL TRENCH, TYP. EDGE OF G 7 s� SLOPE TOWARDS -5 20 MOUND PERFORATED PIPE TAPER v / � 100% FUTURE 100' WETLAND SETBACK / EXPANSION \�; l� AREA, (TYP.) 32 � Gra a CO Io 10'W X 42'L ABSORPTION BED WITH: (2) 1 112"0 X 37'L LATERALS SPACED 5' O.C. W/ (9) 1/4"0 ORIFICES SPACED 4' O.C. (TYP.) WASTEWATER TREATMENT SYSTEM NOTES: I. THE ON -SITE SUBSURFACE WASTEWATER TREATMENT SYSTEM FOR BOTH 8 SEELYE RD AND 12 SEELYE RD. SHALL BE A MOUNDED SOIL ABSORPTION SYSTEM.THE BASIS OF DESIGN FOR THE SYSTEM IS AS FOLLOWS: DESIGN STANDARDS NYSDOH APPENDIX 75A NUMBER OF BEDROOMS 3 DESIGN WASTEWATER FLOW RATE 330 GPD SEPTIC TANK MIN CAPACITY 1000 GAL. SEPTIC TANK CAPACITY PROVIDED 1000 GAL. IN -SITU SOIL DESIGN PERC. RATE 6-7 MIN./IN. IN -SITU SOIL APP. RATE 1.0 GDP/SQFT BASAL AREA MIN. 330 GPD/1.0 GPD/SQFT = 330 SOFT BASAL AREA PROVIDED [((42'-0" + 90'-0")/2) X 32'-0" + (10'-0" X 42'-0"A = 2,532 SOFT MOUND FILL DESIGN PERC. RATE 6-7 MIN./IN. MOUND FILL APP. RATE 0.8 GPD/SQFT ABSORPTION BED AREA MIN. 330 GPD/0.8 GPD/SQFT = 413 SOFT ABSORPTION BED AREA PROVIDED 42'-0"L X 10'-0"W = 420 SQFT PLUMBING FIXTURES MAX. 1.6 GAL./FLUSH WATER CLOSET PUMP DESIGN BASIS: DOSE VOL. 110 GAL. FLOW RATE 33 GPM TDH 37' PUMP RUN TIME ±3 MIN./DOSE 2. ALL WASTEWATER TREATMENT SYSTEM COMPONENTS SHALL BE IN STRICT CONFORMANCE WITH THE SYSTEM DESIGN INFORMATION INDICATED ON THESE DRAWINGS, ALL N.Y.S. DEPT. OF HEALTH AND TOWN OF QUEENSBURY REQUIREMENTS. 3. THE DISCHARGE OF WASTE FROM GARBAGE GRINDERS, SUMP PUMPS, ROOF DRAINS, WATER TREATMENT SYSTEM BACKWASH, AND NON -CONSERVING WATER FIXTURES IS PROHIBITED. ADDITIONALLY, LAWN IRRIGATION SYSTEMS SHALL NOT BE INSTALLED 61 e::;:4'-O" I.D. PRECAST CONC. PUMP STA. 4"0 SOLVENT WELDED SCH. 40 PVC SEWER PIPE. SLOPE @ 1/4"/FT. MIN AT ALL LOCATIONS. ' �N 28°42'39" E - C]121. 4$ i _ �- o J ' N CA , -5.20 SEWER FORCE MAIN 2� 12.32' (10' MIN. / \ - 10' MIN. ) - FUJI ENHANCED -5.30 TREATMENT UNIT / MODEL CE5 D cN PROPOSED ° ti I c,+°N RESI��EN EXISTING _110.00' cNn v RESIDENCE0 0'MIN. / I` ±13.00' 'I (20' MIN.) LO ml FUJI ENHANCED I \ -- TREATMENT UNIT-5.30�chi O 000 MODEL CE5 J _ - + n / 4'-0" I.D. PRECAST 8 132• 15' CONC. PUMP STA. 3 30"44'42" 1 � M FM FM F � � I 0 0 3 - I Z - TOPOGRAPHIC INFORMATION BEYOND SURVEY BOUNDARIES WAS OBTAINED FROM NYS OFFICE OF INFORMATION TECHNOLOGY SERVICES GIS PROGRAM OFFICE 5 1 112" SDR 21 PVC ABOVE THE ABSORPTION FIELD AREA. 4. INSTALL FUJI CE5 AT THE LOCATION SHOWN ON THE DRAWINGS IN ACCORDANCE WITH MANUFACTURERS WRITTEN INSTALLATION INSTRUCTIONS FOUND IN CONTRACTOR INSTALLATION MANUAL RESIDENTIAL AND COMMERCIAL SYSTEMS, DATED NOVEMBER, 2022. TREATMENT UNIT SHALL BE PLACED WITHIN A HEAVY DUTY TRAFFIC -TYPE 1000 GAL PRECAST CONC. SEPTIC TANK WITHOUT AN INTERIOR BAFFLE. LIFT RESTRAINTS WILL BE INSTALLED ON THE TREATMENT UNIT. TANK EXCAVATION SHALL EXTEND 12-18" LONGER AND WIDER THAN TANK. SUITABLE GRANULAR MATERIAL SHALL BE PLACED ON THE SIDES OF THE FUJI UNIT TO BRING THE SURROUNDING GROUND TO GRADE. 5. THE PUMP STATION SHALL BE A TRAFFIC RATED 4'-0" I.D. PRECAST CONC. MANHOLE WIITH A MINIMUM INTERIOR HEIGHT OF 8'-1" AS MANUFACTURED BY FORT MILLER CO. SET STRUCTURE ON LEVEL STONE AS INDICATED. ALL SURFACES SHALL BE SEALED WITH THE MANUFACTURERS STANDARD SEALANT. 6. THE EFFLUENT PUMP SHALL BE A ZOELLER PUMP COMPANY MODEL 140 SUBMERSIBLE EFFLUENT PUMP, 1.5 HP, SINGLE PHASE, 115 VOLT OR APPROVED EQUIVALENT. 7. FLOAT CONTROL SWITCHES SHALL BE ZOELLER PUMP COMPANY PIGGYBACK VARIABLE LEVEL FLOAT SWITCH, FIRMLY MOUNTED TO THE PUMP PIT STRUCTURE. 8. PUMP CONTROL PANEL SHALL BE A ZOELLER SIMPLEX ELECTRICAL CONTROL PANEL UNIT, OR EQUIVALENT, INCLUDING NEMA 4X WATERTIGHT ENCLOSURE, AUDIBLE AND VISUAL ALARMS FOR HIGH WATER, RUN INDICATOR LIGHTS, AND MANUAL OPERATION SWITCHES, PUMP CONTROL PANEL SHALL BE INSTALLED IN A CONSPICUOUS LOCATION WITHIN BUILDING OR ON A PPT POST PROXIMAL TO PUMP STATION. 9. ALL ELECTRICAL WIRING SHALL BE IN STRICT ACCORDANCE WITH THE NATIONAL ELECTRIC CODE AND STATE AND LOCAL REQUIREMENTS. ALL CONDUIT BELOW GRADE SHALL BE SCHEDULE 40 PVC CONDUIT WITH APPROPRIATE FITTINGS. 10. FORCE MAIN PIPING SHALL BE A 1 112"0 SDR 21 PVC PIPE (PRESSURE RATING OF 160 PSI) WITH GASKETED JOINTS AND FITTINGS. FORCE MAIN PIPING SHALL BE INSTALLED TO DRAIN BACK FROM THE MOUNDED SOIL SYSTEM TO THE PUMP STATION WITHOUT SAGS OR HUMPS. 11. BUILDING AND GRAVITY SEWER PIPING SHALL BE SOLVENT WELDED SCH. 40 PVC PIPE. INSTALL SEWER PIPING AT A UNIFORM SLOPE BETWEEN DESIGNATED LOCATIONS WITH NO SAGS OR HUMPS. THE MINIMUM SLOPE FOR ALL SEWER PIPING SHALL BE 1/4"/FT. (2%) UNLESS OTHERWISE INDICATED. 12. DISTRUBUTION LATERALS SHALL BE 1 112"0 SDR 21 PVC PIPE WITH (12) I/4" ORFICES SPACED 4'-0" O.C. DISTRIBUTION LATERALS SHALL BE INSTALLED LEVEL. 13. REMOVE ALL TOPSOIL, STUMPS, AND ORGANIC MATERIAL FROM THE DISPOSAL SYSTEM AREA. AFTER EXCAVATING THE BASAL AREA TO THE LIMITS AND DEPTHS INDICATED, THE WALLS AND FLOORS OF THE BASAL AREA SHALL BE CLEANED AND RAKED TO ACHIEVE AN EVEN SECTION AND TO LOOSEN SMEARED AREAS. 14. NO HEAVY EQUIPMENT OR VEHICULAR TRAFFIC SHALL BE ALLOWED WITHIN THE LIMITS OF THE DISPOSAL FIELD AFTER FILL MATERIAL HAS BEEN PLACED BOTH DURING OR AFTER CONSTRUCTION. 15. PLACEMENT OF THE SAND FILL SHALL BE AS SHOWN AND CARE SHALL BE TAKEN TO FM 2.0 + NOTE: PROPOSED MOUND SYSTEM SERVICING THE RESIDENCE AT 12 SEELYE ROAD NORTH SHALL BE INSTALLED IN ACCORDANCE WITH THESE DRAWINGS AND THE AGREEMENT BETWEEN GERALDINE M. EBERLEIN AND DAVID K. RIES AND THERESA MARINELLO RIES, DATED SEPTEMBER 7, 2023 AVOID INCLUSION OF FINE GRAINED SOIL AND WASTE MATERIAL IN THE SAND. THE FILL MATERIAL SLOPE SHALL NOT EXCEED ONE VERTICAL TO THREE HORIZONTAL. 16. FILL MATERIAL FOR THE MOUND SYSTEM SHALL MEET THE FOLLOWING REQUIREMENTS: - 10% MAX. PASSING A #200 SIEVE - 15% MAX. BEING RETAINED BY A 112 INCH MESH SIEVE - 25% MIN. RETAINED BY A #35 SIEVE TO #10 SIEVE - EFFECTIVE GRAIN SIZE OF 0.15MM - 0.30MM - COEFFICIENT OF UNIFORMITY OF 4-6 17. FILL SHALL BE MECHANICALLY COMPACTED IN APPROX. 8" LOOSE LIFTS WITH TRACK TYPE EQUIPMENT TO ACHIEVE AN IN PLACE PERCOLATION RATE OF 6-7 MIN. PER INCH. THE FINAL PERCOLATION RATE SHALL BE VERIFIED BY THE ENGINEER PRIOR TO INSTALLATION OF THE ABSORPTION FIELD. 18. THE ABSORPTION BED AGGREGATE SHALL CONSIST OF 3/4"-I 112" WASHED GRAVEL OF CRUSHED STONE. 19. THE BOTTOM OF THE ABSORPTION BED SHALL BE LEVEL. THE ABSORPTION BED AGGREGATE SHALL BE COVERED BY A PERMEABLE NON -WOVEN GEOTEXTILE FABRIC.THE GEOTEXTILE FABRIC SHALL BE COVERED WITH PERMEABLE SOIL BACKFILL. 20. TOPSOIL AND SEED THE MOUND AREA AND ALL OTHER DISTURBED AREAS IMMEDIATELY AFTER CONSTRUCTION. 21. SUBMITTALS: THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR REVIEW BY THE ENGINEER. SUBMITTALS SHALL BE TRANSMITTED ELECTRONICALLY. NO FABRICATION OF THESE ITEMS SHALL BE PERMITTED UNTIL THE SUBMITTALS HAVE BEEN REVIEWED AND ACCEPTED: A. PRECAST CONCRETE PUMP STATION B. PRECAST CONCRETE SEPTIC TANK C. FUJI ENHANCED TREATMENT UNIT D. EFFLUENT PUMP E. PUMP CONTROL PANEL F. FLOAT SWITCHES G. MOUND FILL MATERIAL 22. NOTIFY THE ENGINEER FOR INSPECTION AT THE FOLLOWING PHASES OF CONSTRUCTION: A. DURING INSTALLATION OF THE FUJI ETU B. TO PERFORM PERCOLATION TESTS OF THE FILL MATERIAL AT THE BORROW PIT. C. TO INSPECT MOUND SITE PREPARATION PRIOR TO PLACING FILL MATERIAL. D. TO PERFORM PERCOLATION TEST ON THE FILL MATERIAL DURING INSTALLATION. E. UPON INSTALLATION OF THE SEPTIC TANKS, PUMP STATION AND PUMP, AND DURING ABSORPTION BED INSTALLATION WHILE DISTRIBUTION LATERALS ARE EXPOSED TO TEST PUMP PERFORMANCE. 23. UPON COMPLETION OF CONSTRUCTION THE CONTRACTCR SHALL PREPARE A MAP OF i 1 WETLAND/LAKE SEPARATION DIAGRAM AS -BUILT CONDITIONS INDICATING A MINIMUM OF TWO TIE DIMENSIONS FROM ADJACENT CORNERS OF THE RESIDENCE TO THE SEPTIC TANK INLET AND OUTLET COVERS AS WELL AS THE PUMP TANK. 24. EXISTING WASTEWATER TREATMENT SYSTEM COMPONENTS INDICATED TO BE ABANDONED SHALL BE ABANDONED IN PLACE BY PUMPING AND CLEANING TO REMOVE ALL EXISTING WASTEWATER MATERIAL AND COLLAPSING THE EXISTING COVERS AND FILLING THE REMAINING VOID WITH COMPACTED GRANULAR FILL. SHOULD THE CONTRACTOR ELECT TO REMOVE THE EXISTING COMPONENTS FROM THE SITE, ALL MATERIALS INCLUDING SOIL EXTENDING 2 FT. FROM THE ABSORPTION FIELD PERIMETER SHALL BE REMOVED AND DISPOSED OF AT A NYSDEC CERTIFIED SOLID WASTE HANDLING FACILITY. NOTE: NEIGHBORING POTABLE WATER WELLS WITHIN 100' OF THE PROPERTY LINES NEAR THE PROPOSED ABSORPTION FIELD AERA WERE NOT OBSERVED DURING A SITE VISIT BY STUDIO A ON AUGUST 24, 2022. NOTE: PARCELS 227.17-1-25 AND 227.17-1-24 ARE SUPPLIED WITH LAKE WATER SCALE: 1" = 70'-0" LEGEND PROPERTY LINE MEAN HIGH WATER LINE FORCEMAIN FM EXISTING MAJOR CONTOURS EXISTING MINOR CONTOURS EXISTING MAJOR CONTOURS FROM LIDAR EXISTING MINOR CONTOURS FROM LIDAR 860 PROPOSED MAJOR CONTOURS 862 PROPOSED MINOR CONTOURS GRAPHIC SCALE 1- 20 0 10 20 40 O;� s INCH = 20 FEET ON 24" X 36" SHEET MAP REFERENCE: BASE SURVEY INFORMATION OBTAINED FROM -MAP OF A SURVEY MADE FOR GERALDINE EBERLEIN TOWN OF QUEENSBURY, WARREN COUNTY, NEW YORK. CREATED BY VAN DUSEN & STEVES LAND SURVEYORS DATED JANUARY 5, 2020. DIG SAFF NOTF- THIS PLAN SET WAS DRAFTED WITHOUT THE BENEFIT OF "DIG SAFE" MARKINGS. UTILITIES SHOWN ARE NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL CONTACT "DIG SAFE" AT 811 BEFORE COMMENCING ANY WORK AND SHALL PRESERVE EXISTING UTILITIES WHICH ARE NOT SPECIFIED TO BE REMOVED IN THIS PLAN SET. studio LANDSCAPE ARCHnECNRE I ENGFNEERING I PUNNNG STUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STAT EDUCATION LAW FOR ANY PERSON, UNLES THEY ARE ACTING UNDER THE DIRECTION OF LICENSED PROFESSIONAL ENGINEER ARCHITECT, LANDSCAPE ARCHITECT, OR LAN SURVEYOR, TO ALTER ANY ITEM IN ANY WAY IF AN ITEM BEARING THE STAMP OF LICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE OTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION AND SPECIFIC DESCRIPTION OF TH ALTERATION. OF Iq HVH� �C.7 z lei 90FESS10��� Z 101 IZ w U Z Q Z U Q w p > U W w cn w N o Q N o co 0 ~ Z W 0 I Z � W Q Z inO W > 0 Wm cz) tL >- Q i) o J W Z � Q W W w W :D w N C5 W u Z W C) W W of ly- z z Q Q J O W J ~ W Lu H_ J U }- Z � W W � I- 0 :D DATE: 5/9/2023 PROJECT NO. 21113 DRAWING NO. L-3,10 DWG 3 OF 5 CO m Lu Y U w U # # # r m z U) w 0 4" TOPSOIL ,r- LAWN w (n / �z CL as / w w UNDISTURBED SOIL 1'W FRENCH DRAIN DETAIL UNPAVED AREAS 1 PAVED AREAS D+ '-0" MAX. D+I'-0" if,N. PIPE TRENCH DETAIL TOPSOIL & SEED PAVEMENT SUBBASE - BURIED TRACER WIRE/WARNING TAPE - COMPACTED BACKFILL - CLEAN SAND OR GRAVEL MATERIAL SHALL BE CLEANED OF ROCK GREATER THAN I" IN DIAMETER. 18" MIN. HAND TAMPED - BEDDING SAND 4" BEDDING HAND TAMPED PIPE, CENTERED IN TRENCH, SEE PLANS FOR SIZE CENTERED IN TRENCH, SEE PLANS FOR SIZE AND TYPE UNDISTURBED SOIL SCALE: N.T.S. DIST. LAT. C DIST. LAT. 2'-6" 5'-0", TYP. TYP. FIN. GRADE EL. 329.3 NON -WOVEN " GEOTEXTILE FABRIC B/BED EL. 327.5' %�; JrJ' �� >' 10 Q NYSDOT #2 AGGREGATE oI­_ SURROUNDING PIPE MOUND SYSTEM o z o _j GEOTEXTILE FILTER FABRIC "0 TO I z"0 CRUSHED STONE. SAND, SEE NOTE #16 ;�, w MIN. 3" TOPSOIL AND SEED STONE SHALL BE WASHED PRIOR 4"0 PERFORATED HDPE PIPE ON SHEET L-3.10. J.. Q o 0 Q z_ � � o J BACKFILL WITH CLEAN SANDY TO PLACEMENT TO DAYLIGHT WHERE SHOWN < a- ~ LOAM FILL MATERIAL FREE 1.5"0 SDR 21 PVC DISTRIBUTION ON PLANS uw) OF ORGANIC MATTER AND LATERAL W/ (12) 4"0 DRILLED STONES LARGER THAN 2" IN PERFORATIONS @ 4'-0" O.C. _ =' ANY DIMENSION. INSTALL ORIFICE SHIELD @ EA. - - =ALTERNATIVELY, MOUND FILL PERFORATION. PERFORATIONS -- _ -- - MATERIAL CAN BE USED. SHALL BE FACING DOWN, TYP. SCALE: N.T.S. /1 ABSORPT�ON�B�DD ETAIL SCALE: N.T.S. ±90'-0" (2) 1 1/2"0 X 371 SDR 21 PVC DISTRIBUTION LATERAL W/ (9) 1/4"0 ORIFICES DRILLED @ 4' O.C. CL z 16'-0" MIN. o +32'-0" N 10 I - 2'-6", TYP. 1 1/2"0 SDR 21 PVC SEWER FORCE MAIN p FM FM FM N I Lo FROM PUMP STATION 1 1/2"0 X 51 MANIFOLD 5 -5.20 ABSORPTION AREA EDGE OF SAND FILL SEE WASTEWATER TREATMENT SYSTEM NOTE #16 & #17, DWG L-3.10 42'-0" PLAN VIEW 6" TOP SOIL PERMEABLE GEOTEXTILE FABRIC 1.5"0 DISTRIBUTION LATERAL 4 C-7.10 ABSORPTION AREA SAND FILL SEE WASTEWATER TREATMENT SYSTEM NOTE #16 & #17, DWG L-3.10 �� " _� �` 0 rn _z 0 %0 1.5"0 X 2"-0" HIGH STANDPIPE, TYP. UPON COMPLETION OF INSPECTION BY ENGINEER, CUT STANDPIPE TO A MIN OF 6" BELOW FIN. GRADE, AND INSTALL PRESSURE RATED CAP TO BE USED AS A FUTURE CLEANOUT, IF REQUIRED PERMEABLE SOIL 8 PLOWED TOPSOIL LAYER PROFILE VIEW MOUNDED WASTEWATER TREATMENT DETAIL 2"0 SCH 40 PVC VENT PIPE. EXTEND PIPE TO BUILDING, 2'-0" ABOVE ROOF LINE, PROVIDE RAIN CAP. NEMA 4 JUNCTION BOX MOUNTED ON PPT POST OR ON BUILDING WALL 2'-0" ABOVE GRADE. CONDUITS FOR POWER SUPPLY AND - CONTROL WIRING TO PUMP ALARM & CONTROLLER PANEL IN ADJOINING BLDG. FLOAT WIRE BRACKET. 4"0 SOLID PVC PIPE FROM SEPTIC TANK. SLOPE @ 1/4"/FT. EL. AS REQ'D. MAX. STORAGE VOLUME EL. w Qp = J m .a w �� Qm ow Quj a, w ALARM ON U) of 1'-0" 1'-6" MIN. I MIN. SCALE: N.T.S. 26"0 MANHOLE COVER AND FRAME. NEENAH MODEL R-1773-A @ OPENING ABOVE PUMP ONLY. MANUFACTURER'S STANDARD CONC. COVER @ SECOND OPENING. PRECAST CONC. GRADE / RINGS. AS REQ'D. 10 4" THICK X I'-6"W '' ANTI -FLOTATION COLLAR #2 CRUSHED STONE PLACED ON AND WRAPPED WITH GEOTEXTILE FABRIC. NOTES: I. PUMPING STATION IS SHOWN AS DIAGRAMMATIC ONLY. 2. THE USE OF A 4'-0"0 PRECAST CONCRETE WELL CASING AS MANUFACTURED BY THE FORT MILLER COMPANY, FOR THE PUMP STATION STRUCTURE IS ASSUMED. THE INTERIOR HEIGHT SHALL BE A MINIMUM OF 8'-1". NOTIFY THE ENGINEER IMMEDIATELY IF ACTUAL DIMENSIONS FOR THE STRUCTURES DIFFER FROM THESE VALUES. PUMP STATION DETAIL 1,000 GAL. PRECAST CONC. SEPTIC TANK DISCONNECT. 1 1/2" GLOBE VALVE. 1 1/2"0 HDPE PIPE FORCE MAIN TO D-BOX SCH. 80 PVC TO HDPE PIPE ADAPTER. GROUT FOR WATERTIGHT SEAL, (TYP.) DRILL 1/4"0 BLEED HOLE ABOVE CHECK VALVE. CHECK VALVE. 1 1/2"0 DISCHARGE PIPE. EFFLUENT PUMP. UNDISTURBED SOIL. PUMP STATION VOLUMES DIMENSION "A' 17.1 IN. VOLUME 134.1 GAL. DIMENSION "B" 56.2 IN. VOLUME 440 GAL. " STORAGE VOLUME > I DAY DESIGN FLOW. SCALE: N.T.S. studio LANMAPE ARCHRECIl I ENGINEERING I PUNMNG STUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 IT IS A VIOLATION OF NEW YORK STAT EDUCATION LAW FOR ANY PERSON, UNLES THEY ARE ACTING UNDER THE DIRECTION OF LICENSED PROFESSIONAL ENGINEER ARCHITECT, LANDSCAPE ARCHITECT, OR LAN SURVEYOR, TO ALTER ANY ITEM IN ANY WAY IF AN ITEM BEARING THE STAMP OF ICENSED PROFESSIONAL IS ALTERED, THE ALTERING LICENSED PROFESSIONAL SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION 'ALTERED BY' FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERNATION AND SPECIFIC DESCRIPTION OF THE ALTERATION. 0F Is: o n 2Ir 9�FESStO�'��~ IZI O_ I— IL W U z U) ()f Q Z � Q W 0 > U W CL w W � N o Q N 00 0 z Wo Z WCz m Q W O >_ o Z W t.L m >- Q W —1 W Z � Q W W w W :D rL U N C W U z W C) W W W _JJ Q W O z z p O Q J WI U }- (D Z W LLJ < O CL (n o U DATE: 5/9/2023 PROJECT NO. 21113 FDRAW.INGN0. 5.20 DWG 4 OF 5 3 Q o Of N 22.5" TUFTITE BOX'' PLAN VIEW TUFTITE BOX PLACED ON STONE PAD, TO PROMOTE DRAINAGE AWAY z FROM COMPRESSOR. DO NOT INSTALL UNDER DRIPLINE OF ROOF. CD AIR COMPRESSOR PATIO BLOCKS STONE PAD CAPILLARY AIR LINES TO CONTROL PANEL 3/4"0 AIR LINE TO FUJI AIR COMPRESSOR INSTALLATION N.T.S. r N C PLAN VIEW SECTION A -A VIEW FUJI DIMENSIONS N.T.S. INSTALL ONE DEDICATED 115 VOLT, 20 AMP ISOLATED ELECTRIC CIRCUIT FROM THE MAIN _ ELECTRICAL SERVICE TO FUSION PANEL. WIRE COMPRESSOR DIRECTLY INTO CONTROL PANEL. FUJI ALARM/CONTROL PANEL DWELLING FUJIMAC UL AIR PUMP MODEL 80RII INSTALL TUFTITE BOX ON STONE PAD, TO PROMOTE DRAINAGE AWAY FROM PUMP. DO NOT INSTALL UNDER ROOF DRIPLINE. 24" X 18" X 6" STONE PAD a 3/4"0 AIRLINE TO FUJI UNIT. CLEANOUT FLOW r\ I BUILDING SEWER LINE CONTRACTOR/INSTALLER MUST READ & FOLLOW INSTRUCTIONS & PROCEDURES CONTAINED IN FUJI INSTALLATION MANUAL. FUJI UNIT VENTS THROUGH HOUSE VENT SYSTEM. FOR HOUSES WITH HOUSE TRAPS INSTALLED, VENT SYSTEM SEPARATELY THROUGH VENT HOLE IN TANK. FUJI CE5 TYPICAL PROFILE N.T.S. FUJI ENHANCED TREATMENT UNIT DETAIL SEE UPLIFT RESTRAINT DETAIL !A UPLIFT RESTRAINT N.T.S. FINISH GRADE FLOW 10,000 LB RATED NYLON STRAP, TYP. 1/4" SSTL CABLE SECURED BY SSTL CLEVICES, TYP. CLEVICE ATTACHES TO NYLON STRAP 3/8"X 12"XI 1/4" SSTL EYE HOOK, TYP. CONC. TANK BOTTOM 26"0 MANHOLE COVER AND FRAME. NEENAH MODEL R-1773-A, TYP. PRECAST CONC. GRADE RINGS AS REQ'D MANUFACTURERS STANDARD RISER AND COVER. APPLY SILICONE SEALANT FULLY AROUND EACH RISER SECTION PRIOR TO SECURING WITH SUPPLIED SCREWS, TYP. NYLON STRAP WITH MIN. 10,000 LB. RATING CENTERED BETWEEN TANK LIDS, TYP. CUSTOM PRECAST CONC. TANK. SEE TANK DETAIL . FILL VOIDS IN CONC. TANK WITH GRANULAR BACK FILL MATERIAL. COMPACT IN 6" LIFTS. 4" THICK X I'-6"W ANTI FLOTATION COLLAR, TYP. 8 INCHES OF NO. 2 CRUSHED STONE PLACED ON AND WRAPPED WITH GEOTEXTILE FABRIC UNDISTURBED SOIL 0 .o 4" THK. X 1'-6" W CONCRETE ANTI FLOTATION COLLAR CUSTOM PRECAST CONC. TANK DIMENSIONS N.T.S. .00 TYP. 04 bLALL: IV I J stu d i o LANDSCAPE ARCHIIF E I L3 GWERING I PLANNING STUDIO A LANDSCAPE ARCHITECTURE + ENGINEERING, DPC MAILING: PO BOX 272 SARATOGA SPRINGS, NY 12866 OFFICE LOCATION: 38 HIGH ROCK AVE, SUITE 3 SARATOGA SPRINGS, NY 12866 (518) 450-4030 T IS A VIOLATION OF NEW YORK STATE EDUCATION LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF LICENSED PROFESSIONAL ENGINEER ARCHITECT, LANDSCAPE ARCHITECT, OR LAN SURVEYOR, TO ALTER ANY ITEM IN ANY WAY IF AN ITEM BEARING THE STAMP OF ICENSED PROFESSIONAL IS ALTERED, TH ALTERING LICENSED PROFESSIONAL SHAL STAMP THE DOCUMENT AND INCLUDE TH NOTATION 'ALTERED BY' FOLLOWED BY THEI SIGNATURE, THE DATE OF SUCH ALTERNATION AND SPECIFIC DESCRIPTION OF TH ALTERATION. 0F Ne " y E fill O10 co �,� n � Q �FESSIO�'�t` Z O I1 w U z U) � Q Z O N Q U) W 0 > U_ � W t— °- W U) W I— N o Q N_ 0 00 0 ~ Z L0 -1 Z Of L Z m Q L 0w >-- Of O Z L LL- U) o�m 0 J LLJ Q Q W W w W fif L U N IC3 L U Z L c) L7 L O = Q [If L 0 C) Z z 0 Q F' 0 U Of w -� ::) L of U } Z W 0 L < 0 CL (n o U DATE: 5/9/2023 PROJECT NO. 21113 WING NO. rL —5.30 DWG 5 OF 5