Loading...
IM Inspection Worksheet_03-11-2023_12-13-32INSPECTION WORKSHEET (FRM-028722-2023) RC-0480-2023Case Number:Case Module:Permit Management 11/03/2023 Partial PassInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:5 Reardon Rd Queensbury, NY 12804 289.7-1-6 Company Name NameContact Type Applicant Dana Roberts Contractor HD Construction Granted Permission HD Construction Primary Owner Mark Weidner Checklist Item CommentsPassed Building Inspector Notes False Insulation under bow & bay window(s)False Joist hangers False Exterior wall outlets sealed False Design Professional Sign-off, if required False <4:12 pitch double layer of ice/snow underlayment False Anchor Bolts 6 ft. or less on center True Ice and water shield 24 inches from wall False 12 O.C.False Notches Holes Bearing Walls False Metal Strapping for Notches Top Plate False Bracing Bridging True Deck (post beam connections hex head bolts)False Jack Posts Main Beams False Soffits-Insulation Baffel False Exterior sheeting nailed properly False Hurricane Clips/Uplift Screws/Nail Holes Filled True Permit Card Visible From Road True Framing False partial inspection only / floor system, will need to verify wall insulation at chimney chase, 1/2" type X interior of chase Headroom 6 ft. 8 in.False November 03, 2023 Page 1 of 1