IM Inspection Worksheet_03-11-2023_15-33-47INSPECTION WORKSHEET (RPLUM-028724-2023)
RC-0686-2022Case Number:Case Module:Permit Management
11/03/2023 PassedInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:6 Antler Rd
Queensbury, NY 12804
240.9-1-3
Company Name NameContact Type
Applicant Prime Construction Saratoga
Contractor Prime Construction Saratoga
Granted Permission Elizabeth Abkin
Primary Owner Elizabeth Abkin
Checklist Item CommentsPassed
Building Inspector Notes False
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True existing
Washing Machine Drain 2 inch minimum True
Rough Plumbing / Nail Plates True
Water Supply Piping True
Plumbing Vent Vents in Place True
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
Drain Vent True
Permit Card Visible From Road False
November 03, 2023 Page 1 of 1