IM Inspection Worksheet_08-11-2023_15-48-31INSPECTION WORKSHEET (BINS-028807-2023)
CC-0331-2022Case Number:Case Module:Permit Management
11/08/2023 Partial PassInspection Status:Inspection Date:
Building InsulationInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:20 Newcomb St
Queensbury, NY 12804
309.10-1-60
Company Name NameContact Type
Applicant Schermerhorn Residential Holdings
Architect Rucinski Hall Architecture
Granted Permission Schermerhorn Residential Holdings
Primary Owner Schermerhorn Residential Holdings
Checklist Item CommentsPassed
Zip exterior sheathing, nailing & taping True 1" zip R insulated sheating with seams taped
Building Inspector Notes False 5/4/23 partial approval for insulation
- insulation at tub enclosure verified, R 21 at end units, R 11 at
center units.
11/8/23 partial approval for insulation.
- Thermal and sound insulation approved.
U Factors = .3 cfm for windows, .5 cfm for doors True .29
Tub Shower R-20 with Vapor Barrier True 5/4/23 partial approval for insulation
- insulation at tub enclosure verified, R 21 at end units, R 11 at
center units.
Exterior wall outlets sealed True
All Return Air Hard Duct Work False
Duct work sealed properly / No duct tape True
Duct Testing Outside Conditioned Space False
Door / Window Sealed (No Insulation)True
Air Seal Outside Penetrations True
All Ductwork Sealed Return and Supply False
Air Barrier behind Knee Walls False
Blower Door Test False
Duct Insulation - if required in unheated spaces False
Tyvek or Similar Exterior Sealant True
Combustion Air Supply for Furnace True
Window Sealing True
Duct Blaster Test for duct work, R-8, unhtd spaces False
Permit Card Visible From Road True
Proper Vent, Attic Vent True
Insulation ResCheck ComCheck True COm check R 38 in ceilings, R 30 in floors R 21 in walls
November 08, 2023 Page 1 of 1