Loading...
IM Inspection Worksheet_08-11-2023_11-24-39INSPECTION WORKSHEET (RPLUM-028796-2023) RC-0458-2023Case Number:Case Module:Permit Management 11/08/2023 Partial PassInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:29 Revere Rd Queensbury, NY 12804 308.18-1-45.2 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Engineer Vision Engineering Granted Permission Cerrone Builders Inc Primary Owner BRIAN LITTLE Checklist Item CommentsPassed Building Inspector Notes False Pressure Test True Pressure Test True 3" Vent Through Roof - 18" min True Washing Machine Drain 2 inch minimum True All Return Air Hard Duct Work False not installed at time of inspection 5 psi or 10 ft. above highest conn. for 15 minutes True Rough Plumbing / Nail Plates True Duct Testing Outside Conditioned Space False Water Supply Piping True Duct Insulation - if required in unheated spaces False Duct work sealed properly False Cleanout every 100 feet change of direction True Plumbing Vent Vents in Place True Air Test Gas Piping 10 psi for 10 Minutes False Washing Machine Trap: 18"-42" discharge True Air Head True Air Head True 50 P.S.I for 15 minutes False 1 ½ inch minimum Drain Size True Drain Vent True Permit Card Visible From Road False November 08, 2023 Page 1 of 1