IM Inspection Worksheet_16-11-2023_08-11-37INSPECTION WORKSHEET (FRM-028950-2023)
RC-0599-2022Case Number:Case Module:Permit Management
11/16/2023 PassedInspection Status:Inspection Date:
Building FramingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:42 Old Assembly Point Rd
Lake George, NY 12845
239.12-2-11
Company Name NameContact Type
Applicant CGM Construction Inc
Architect Curtis Dybas
Contractor CGM Construction Inc
Granted Permission Jeffrey Randles
Nancy Randles
Primary Owner Jeffrey Randles
Nancy Randles
Checklist Item CommentsPassed
Building Inspector Notes True rough framing partial approved / approved 8/11/23
Air Seal all Plates and Sills True
Joist hangers True
Exterior wall outlets sealed True seal all exterior outlets
20 in. (W)True
5.0 sf grade False
Design Professional Sign-off, if required False provide sign off from C. Dybas
24 in. (H)True
Air Seal All Registers at Floor True
<4:12 pitch double layer of ice/snow underlayment False not yet applied / provide Architect sign off
Anchor Bolts 6 ft. or less on center True
Ice and water shield 24 inches from wall True
Bath fans connected to exterior vent False not yet connected
12 O.C.True
Air Sealing all Joints Before Insulation True
Notches Holes Bearing Walls True
5.7 sf above below grade False
Truss Specification Provided True provide bracing where indicated on truss specs
Windows Habitable Space Bedrooms True
Metal Strapping for Notches Top Plate True
Bracing Bridging True
Garage portal framing True
Deck (post beam connections hex head bolts)False provide "tension ties"
Jack Studs Headers True
Jack Posts Main Beams True
Attic Access 22 x 30 minimum True
Soffits-Insulation Baffel True provide baffles / "Accu vent" / verified
Exterior sheeting nailed properly True
November 16, 2023 Page 1 of 2
INSPECTION WORKSHEET (FRM-028950-2023)
Checklist Item CommentsPassed
Hurricane Clips/Uplift Screws/Nail Holes Filled True
Permit Card Visible From Road True
Framing True
Headroom 6 ft. 8 in.True
November 16, 2023 Page 2 of 2