Loading...
IM Inspection Worksheet_16-11-2023_12-39-17INSPECTION WORKSHEET (RESFINAL-028901-2023) RC-0599-2022Case Number:Case Module:Permit Management 11/16/2023 Partial PassInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:42 Old Assembly Point Rd Lake George, NY 12845 239.12-2-11 Company Name NameContact Type Applicant CGM Construction Inc Architect Curtis Dybas Contractor CGM Construction Inc Granted Permission Jeffrey Randles Nancy Randles Primary Owner Jeffrey Randles Nancy Randles Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle True Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out False Final Survey Plot Plan False N/A Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Backflow Preventors where required True Basement wall insulation R- value verified True Emergency egress below grade True Intake Openings True Safety glazing: w/in 5' of tub/shower True Site Plan / Variance required True to provide site plan certification Seals on Garage Doors, esp. Wood True Not less than 3' horiz from opening of bthrn True Attic Access Insulation = Attic R- Value True Gas Shut-off Exposed & Regulator 12" min abv grd False Propane Platform at all exterior doors True Garage Floor Pitched True Buried Fuel Tanks anchored in flood zone False Wood deck: 2'+ from grade dia bracing required True Inter Connected True Arc Fault Breaker Habitable Spaces True Energy Sticker on Elec. Panel:R-Val. & Heating Sys True Furnace/Hot Water Heater operating True Fresh Air Intake True Chimney Rain Cap Installed True Basement stairs closed rise greater than 4 inches True November 16, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-028901-2023) Checklist Item CommentsPassed Foam in basement/attics covered w/thermal barrier True At existing wall / furnace area Outside every bedroom area True Blower Door Test Certification False N/A- addition to existing foundation Fin Elect; Energy Saving Light Bulbs 90 Percent True Heat detector in garage True OK to Issue C/O False Truss ID Signage Installed at Electrical Meter True Range Hood 400+ cfm-Fresh Air REQUIRED False N/A 4 inch Building Number Address visible from road True Attic Access Gasketed True Jack posts in basement lagged at top and bottom True Guard at deck, porches 36" or more True 6" clearance to sill plate True 5/8" Type X with Living Space Above True Propane Tank: Proper Setback from Prop Line/Struct True 4+ Deck Joist Ledger Connections-24" From Ends True 20 Minute Fire Door/Self-Closing Hardware True Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True Chimney Height / B Vent / Direct Vent Location True within 10' of all sleeping areas True on all levels w/gas appliances (i.e. furnace)True Relief Valve ,Heat Trap/Water Temp 110 deg or less True 1/2" Gypsum or House Wall and Gable True Flex Gas Pipe Bonding False Attic Access 22 x 30 minimum True Basement Egress: 5s.f. window w/sill or Bilco door True General Comments True For Temp C/O, Condition of providing site plan certification from engineer Smoke Detectors:True Battery backup True Guard at stairwell at 34" or more True Plumbing fixtures True HRV or ERV Installed per Bedroom Requirements True All Hot Water Systems: 3/4" or larger piping R-3 True Roof Complete / Exterior Finish Complete True Deck Ledger-Bolted per Code True Low water shut-off boiler False Fresh air supply 3' from grade True Handrail Termination at Newell Post or Wall True Handrail 4 or more risers True Bathroom / Kitchen Watertight True November 16, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-028901-2023) Checklist Item CommentsPassed Interior/Exterior Railings 34 to 38 True Carbon Monoxide Detectors:True Foundation insulation to floor True Encl. Stairs Sheetrock Underside minimum ½ Gypsum True As Built Septic System True Existing system Guards at stairs,decks,patios 30" + above grade True Outside Spigots have Air Gap True Duct work sealed properly True OK to Issue Temporary C/O True See general note November 16, 2023 Page 3 of 3