Loading...
CC-0552-2023 Office Use Only ` ADDITION/ALTERATION PERMIT Permit#: C(.ofqu O 2-- 20c b APPLICATION Town1nc t'ry Permit Fee:$ O 114 BD 742 Bay Road,Queensbury,NY 12804 P:518-761-8256 www.queensbury.net Invoice#: 50u. Flood Zone? Y N Reviewed By: Project Location: 1424 US-9, Ste 115 Lake George, NY 12845 Tax Map ID#: 288.1 6-1 -1 Subdivision Name: PROJECT INFORMATION: No change-existing Jockey store TYPE: ❑ Residential Commercial, Proposed Use: ❑ Single-Family ❑ Two-Family ❑ Multi-Family(#of units_) ❑ Townhouse ❑ Business Office ® Retail ❑ Industrial/Warehouse El Garage (#of cars ❑ Other(describe ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 3,128 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement(habitable space): Basement(habitable space): Total sq ft: Total sq ft: 3,128 • Scope of work to be done: Tenant Improvement of retail space within a shell structure with electrical work. n I rEP U L.:L.:5_022023 1l+tnmr., I 7 T..,,,,�v vr 'c ENBBUpY BUILDING,"; CODES _........vim` Addition/Alteration Application Revised June 2022 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 78,000 2. Source of Heat (circle one): ❑ Gas ❑ Oil ❑ Propane ❑ Solar ❑ Other: Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? ❑ YES 0 NO Explain: 4. Are there any easements on the property? ❑ YES © NO SITE INFORMATION: • Is this a corner lot? ❑ YES ® NO • Will the grade be changed as a result of the construction? ❑ YES B NO • What is the water source? U PUBLIC ❑ PRIVATE WELL • What type of wastewater system is on the parcel? UI SEWER ❑ PRIVATE SEPTIC DECLARATION: l. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. I certify that the application, plans and supporting materials are atrue and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance ofa certificate of occupancy. I have read and agree to the above: PRINT NAME: Adam Kerian SIGNATURE: Ot &14r1 9k )Z€f ?\ DATE: 8/28/2023 Addition/Alteration Application Revised June 2022 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): Adam Kerian Mailing Address, C/S/Z: 319 Elaines Ct Dodgeville, WI 53533 Cell Phone: ( ) Land Line: ( )608-407-9084 Email:adam@permit.com • Primary Owner(s): Name(s): R. Genovese&Associates, Inc Mailing Address, C/S/Z: 350 Landi Court Wyckoff, NJ 07481 Cell Phone: ( )201-669-7083 Land Line: ( )201-485-8262 Email:robin@rgenoveseandassociates.com ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Francis G Petrikas DBA-GFP Specialties Contractor Trade: Building Mailing Address, C/S/Z: 5 Sylvan Avenue Queensbury, NY 12804 Cell Phone: ( ) Land Line: ( ) Email:gfpspecialties@hotmail.com **Workers' Comp documentation must be submitted with this application** • Architect(s)/Engineer(s): Business Name: Cortland Morgan Architect Contact Name(s): Tim Fleming Mailing Address, C/S/Z: 711 N Fielder Rd Arlington, TX 76012 Cell Phone: ( ) Land Line: ( )619-957-3124 Email:tim@acrma.com Contact Person for Compliance in regards to this project: Cell Phone: ( ) Land Line: ( ) Email: Addition/Alteration Application Revised June 2022 ��\ FIRE MARSHAL'S OFFICE _w Town of Queensbury 742 Bay Road, Queensbury, NY 12804 "Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Jockey 1424 State Rte 9, Ste 115 CC-0552-2023 3128 S.F. Interior Alteration 9/15/23 I have reviewed the submitted drawings for the above project; and offer the following comments: 1) Verify Storage 2) Verify operation of existing exit / emergency lights w/ own breaker 3) Verify Locks/Latches according to the 2020 NYSFC 4) Verify Fire Extinguisher locations 5) Verify paths of egress/ Stockroom must follow 1016.2 2020 NYSFC 6) Verify Knox Box Key 7) Truss ID required 8) CO Detection required 9) If New Fire Alarm system: NFPA 72 inspection and Testing Report -System Layout -NYS License for installer -External H/S at FDC, active on all alarms -Sprinkler system monitoring -Central station monitoring -A witness function test by the FM office is required -HVAC shutdown may be required 10) Protection of the Fire Alarm system during construction According to the 2020 NYSFC Chapter 33 11) NFPA 72 letter of compliance required for any alterations to the Fire Alarm System. 12) NFPA 13 letter of compliance required for any modifications to the Sprinkler System Fire Marshal's Office • Phon e: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbury.net • www.queensbury.net 13) Properly Identify Spaces in fire alarm Panel Deputy Fire Marshal Tyson Converse 742 Bay Road Queensbury NY 12804 518 761 8205 tysonc@queensbury.net Fi re Marshal's Office • P h o n e: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbury.net • www.queensbury.net C • 1 COMcheck Software Version 4.1.5.5 II I iInterior Lighting Compiianc ' iLertifi /PA cate---- .:':"1:'.;:':,::,,,..,.. SEP 0 5 2023 0 Project Information F� _„ Energy Code: ``^1`4 �A 9). `- y 6)-Standard"'•�:; _„ `. °INN ©Ft„� Project Title: `�\`. GQ\v` oCKEY-LAKE dEORGE-.:: •,. -� —......._____„2-7BUILD INg,EEN� URY Project Type: G00 Alteratiori ',-; , CODES Construct.' -. Owner/Agent:. ,t, Designer/Contra . 1424 ST• E ROUTE 9, SUITE 115 FILE LAKE GEORGE, NY 12845 Allowed Interior Lighting Power .: �� A B C Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-sales(Retail:Sales Area) 3045 1.22 3715 Allowance:Other retail highlighting/Fix.ID:T1 670(a) 0.45 302(b) Allowance:Other retail highlighting/Fix. ID:T2 800(a) 0.45 360(b) Allowance:Other retail highlighting/Fix. ID:T3 637(a) 0.45 287(b) Allowance:Other retail highlighting/Fix.ID:T4 411 (a) 0.45 185(b) 2-stockroom(Warehouse:Smaller,Hand-Carried Material Storage):Exempt Supplemental Allowed Watts(null)= 1000 Total Allowed Watts= 5848 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Area Category Exemption Qualifications Connected Watts Total#Watts Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt. stockroom (Warehouse Storage:Smaller, Hand-Carried 356 0 356.000 356.000 Items 322 sq.ft.) Exemption:Less than 20%connected lighting watts replacement. Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. sales( Retail:Sales Area 3045 sq.ft.) Track lighting 1:T1:TRACK-W LED: Wattage based on current limiting device capacity 0 0 1080 1080 Track lighting 2:T2:TRACK-X LED: Wattage based on current limiting device capacity 0 0 960 960 Track lighting 3:T3:TRACK-Y LED: Wattage based on current limiting device capacity 0 0 1200 1200 Track lighting 4:T4:TRACK-Z LED: Wattage based on current limiting device capacity 0 0 720 720 Linear LED 2x2:X:EXIST.led 2x2:Other:Electronic: 1 28 22 616 stockroom(Warehouse Storage:Smaller. Hand-Carried Items 322 sq.ft.): Exempt ' T—*.l Proposed Watts= 4576 288.16-1-1 CC-0552-2023 Jockey 1424 State Rte 9, Ste 115 Interior Alterations 3128 s.f. Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.cck Page 1 of 6 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016)Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. DON PENN, PE `" r 08/23/2023 Name-Title Sign 6 O 1 4. ;;r Date At', JAW* * C Fy * - ;.1�. R r. O h� , W• • 07403\ �Ci= _- - AgCFESSICNP Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 2 of 6 { , COMcheck Software Version 4.1.5.5 Inspect ilf ion Checklist Energy Code: 90.1 (2016) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement wiil.'be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review .Complies? Comments/Assumptions- & Req.ID ,4,:2:2;,_.r. Plans,specifications, and/or Complies 01:!i , ' calculations provide all information ❑Does Not 8 y4 1f2 '-' with which compliance can be ❑Not Observable S,t]:,'- determined for the electrical systems z ❑Not Applicable ![PR6i]�.''t°° and equipment and document where PP -,;;- . '..j7' exceptions are claimed. Feeder _.n,Y . . . -:;connectors sized in accordance with a:14',1 + . approved plans and branch circuits ......,:,__ . _sized for maximum drop of 3%. 4.2.2, Plans,specifications,and/or ❑Complies 9.4.3,9.7 calculations provide all information ❑Does Not [PRO with which compliance can be ['Not Observable determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: • 1 High Impact(Tier 1) _2 Medium Impact(Tier 2) 3_ Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELECO1\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 3 of 6 Section Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4`2 At least 50%of all 125 volt 15-and ❑Complies [EL10]z 20-Amp receptacles are controlled by ❑Does Not an automatic control device. ['Not Observable ❑Not Applicable 8.4.3 New buildings have electrical energy ❑Complies [EL11]2 use measurement devices installed. ❑Does Not 'Where tenant spaces exist, each tenant is monitored separately. In ['Not Observable • ,buildings with a digital control system ❑Not Applicable the energy use is transmitted to to x• , ..,;-..' a control system and displayed , : .' a graphically. 9:4:1r'1• Automatic control requirements ❑Complies [EL1]2; prescribed in Table 9.6.1,for the ❑Does Not " '•` • appropriate space type, are installed. • Mandatory lighting controls(labeled ['Not Observable as 'REQ') and optional choice controls ❑Not Applicable (labeled as'ADD1'and 'ADD2')are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies [EL2F 7r per approved lighting plans and all EDoes Not manual controls readily accessible and . 'visible to occupants. ENot Observable ❑Not Applicable 9.4.1.1f Daylight areas under skylights and ❑Complies [EL13]1 roof monitors that have more than ❑Does Not 150 W combined input power for general lighting are controlled by ❑Not Observable photocontrols. ❑Not Applicable 9.4.1.3 ;Separate lighting control devices for ❑Complies [EL4]1 :specific uses installed per approved ❑Does Not lighting plans. ['Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELECOI\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 4 of 6 Section Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies [FI17]3 isystems and equipment to the ❑Does Not )building owner or designated representative. ['Not Observable ❑Not Applicable 9.2.2.3 :Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 I lighting power is consistent with what ❑Does Not is shown on the approved lighting plans,demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75%of all permanently ❑Complies [FI20]1 installed lighting fixtures in dwelling DDoes Not units have>=55 Im/W efficacy or a >=45 lm/W total luminaire efficacy. ❑Not Observable ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2_ Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccI Page 5 of 6 Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.cc4 Page 6 of 6 _, ., COMcheck Software Version 4.1.5.5 Interior Lighting Compliance Certificate Prr•ject lntor,iation Energy Code: 90.1;(2016) StandaRct~•.:');-°=: Project Title: JOCKEY-.LAKE GEO `,'• RGE , Project Type: Alteration - k Construction Site: Owner/Agent: .'': / Designer/Contractor: 1424 STATE ROUTE 9, SUITE 115 LAKE GEORGE, NY 12845 _ • Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-sales(Retail:Sales Area) 3045 1.22 3715 Allowance:Other retail highlighting/Fix.ID:T1 670(a) 0.45 302(b) Allowance:Other retail highlighting/Fix.ID:T2 800(a) 0.45 360(b) Allowance:Other retail highlighting/Fix.ID:T3 637(a) 0.45 287(b) Allowance:Other retail highlighting/Fix.ID:T4 ' 411 (a) 0.45 185(b) 2-stockroom(Warehouse:Smaller,Hand-Carried Material Storage):Exempt Supplemental Allowed Watts(null)= 1000 Total Allowed Watts= 5848 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. (c) Supplemental watts must be associated with retail merchandise highlighting fixtures. Area Category Exemption Qualifications , Connected Watts Total#Watts Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt. stockroom (Warehouse Storage:Smaller. Hand-Carried 356 0 356.000 356.000 Items 322 sq.ft.) Exemption:Less than 20%connected lighting watts replacement. Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. sales(Retail:Sales Area 3045 sq.ft.) Track lighting 1:Ti:TRACK-W LED: Wattage based on current limiting device capacity 0 0 1080 1080 Track lighting 2:T2:TRACK-X LED: Wattage based on current limiting device capacity 0 0 960 960 Track lighting 3:T3:TRACK-Y LED: Wattage based on current limiting device capacity 0 0 1200 1200 Track lighting 4:T4:TRACK-Z LED: Wattage based on current limiting device capacity 0 0 720 720 Linear LED 2x2:X:EXIST.led 2x2:Other:Electronic: 1 28 22 616 stockroom(Warehouse Storage:Smaller. Hand-Carried Items 322 sq.ft.): Exempt Total Proposed Watts= 4576 • Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELECO1\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccb Page 1 of 6 .. J nt•erior Lighting PASSE interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checkli:t. DON PENN, PE _ .-,. 08/23/2023 Name-Title Sign;'. "'`, Dale AN:e JAiWzz, .ti,a,' r ' I ® O7403A (e.• '90PESS1OIAP Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 2 of 6 • \L • COMcheck Software Version 4.1.5.5 Inspection Checklist Energy Code: 90.1 (2016) Standard inft Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. section ; # Plan Review Complies? Comments/Assumptions & Req.ID ...• _ - . 4:?,c— = �Plans,specifications, and/or ❑Complies 8 4 4,< ,calculations provide all information ❑Does Not `87:14 l 2 'W' with which compliance can be �Z, - 3 determined for the electrical systems ['Not Observable 8 ![PR64:;=• 'land equipment and document where ❑Not Applicable .. ,^i:,,,;- exceptions are claimed. Feeder ! ,_;,a4 ,1"';'connectors sized in accordance with : °;.:' approved plans and branch circuits _ _y,'•,:,.,sized for maximum drop of 3%. 4.2.2, Plans,specifications, and/or ❑Complies 9.4.3, 9.7 calculations provide all information ❑Does Not [PRO with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable , and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) _3, Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 3 of 6 ti Section • # . Rough-In Electrical inspection' Complies? Comments/Assumptions : . .. - ...;. ;84:21<" `,At least 50%of all 125 volt 15-and ❑Complies •[ELTO]t':� 20-Amp receptacles are controlled by ❑Does Not • :, •an automatic control device. DNot Observable `1`=:•= > ❑Not Applicable -:I New buildings have electrical energy ❑Complies :[+EL19 tl use measurement devices installed. ❑Does Nnt .t'71,W1f4 Where tenant spaces exist,each ❑Not Observable y., tenant is monitored separately. In buildings with a digital control system ❑Not Applicable the energy use is transmitted to to control system and displayed graphically. 7974.1.1. 's Automatic control requirements ❑Complies )"E" z [EL1]:.. prescribed in Table 9.6.1,for the ❑Does Not _ _ appropriate space type, are installed. Mandatory lighting controls (labeled ❑Not Observable as REQ')and optional choice controls ❑Not Applicable 4 (labeled as'ADD1'and 'ADD2') are : " '� ' implemented. =1:4'`- Independent lighting controls installed ❑Complies TEL02a] ';= per approved lighting plans and all ❑Does Not manual controls readily accessible and visible to occupants. ❑Not Observable 1:41. p ;❑Not Applicable 9.4.1.1f ;Daylight areas under skylights and ❑Complies [EL13]1 roof monitors that have more than ❑Does Not 150 W combined input power for [Not Observable general lighting are controlled by photocontrols. ❑Not Applicable 9.4.1.3 Separate lighting control devices for ❑Complies • [EL4]1 specific uses installed per approved ElDoes Not lighting plans. ❑Not Observable; ❑Not Applicable 9.6.2 ;Additional interior lighting power ❑Complies [EL8]1 !allowed for special functions per the ❑Does Not ;approved lighting plans and is ❑Not Observable automatically controlled and (separated from general lighting. ❑Nat Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2+ Medium Impact(Tier 2) 3_ Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.ccl' Page 4 of 6 Section # Final Inspection - Complies? Comments/Assumptions & Req.ID • - '8.7.1 ;Furnished as-built drawings for ❑Complies [FI16]3 electric power systems within 30 days ❑Does Not of system acceptance. ['Not Observable DNot Applicable 8.7.2 !Furnished O&M instructions for ❑Complies fFI17]3 ;systems and equipment to the ❑Does Not building owner or designated representative. [Not Observable DNot Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ['Not Observable plans,demonstrating proposed watts are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75%of all permanently ❑Complies [FI20]1 installed lighting fixtures in dwelling Does Not units have >= 55 Im/W efficacy or a ['Not Observable >=45 Im/W total luminaire efficacy. DNot Applicable Additional Comments/Assumptions: • • 1 High Impact(Tier 1) t 2 Medium Impact(Tier 2) 3_ Low Impact(Tier 3) Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.cck Page 5 of 6 Project Title: JOCKEY-LAKE GEORGE Report date: 07/12/23 Data filename: \\ELEC01\SharedDocs\C&G Engineering\006-23-143 Jockey Lake George\Compliance Calcs.cc14 Page 6 of 6