Steel observation c
REINFORCING STEEL OBSERVATIONS REPORT
"Neuman
Report Number: JB211030.0009
Service Date: 05/17/21 30 Corporate Cir Ste 201
Report Date: 05/19/21 Albany,NY 12203-5169
518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number: JB211030
l SPREAD FOUNDATION ❑ GRADE BEAM
❑ FOUNDATION WALL 0 STRUCTURAL SLAB
❑ CLASSIFICATION 0 OTHER
REFERENCE DRAWINGS: Structural plans
LOCATION:Walk-over bridge
El REQUIRED BAR SIZE
El REQUIRED GRADE STEEL
El REQUIRED BAR SPACING
El REQUIRED BAR CLEARANCE
El REQUIRED SPLICES
El CONFORMS TO DRAWING
❑ DOES NOT CONFORM
❑ REMARKS
Services: Observe the placement of reinficing steel and/or embedded elements as requested in general accordance with project
specifications and/or client request(s).
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell
Report Distribution:
(1)The Great Escape Theme Park L.P., (1)The Great Escape Theme Perk L.P.,
Rebecca Wood Lorraine Caricari
Reviewed By:
M. 'H
Materials Department Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. Thls report Is exclusively for the use of the client
indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily Indicative of the properties of other apparently similar or Identical materials.
Cr0001,10-16-13,Rev.10 Page 1 of 1
CONCRETE COMPRESSIVE STRENGTH TEST REPORT u���a
A1rerraCan COMPANY
Report Number: JB211030.0010
Service Date: 05/17/21 30 Corporate Cir Ste 201
Report Date: 05/31/21 Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/17/21 Sample Time: 1300
Sampled By: Philip Ayoreh
Mix ID: 20417-C Weather Conditions: sunny
Supplier: Jointa Galusha Accumulative Yards: 6.50 Batch Size(cy): 6.5
Batch Time: 1230 Plant: 1 Placement Method: Direct Discharge
Truck No.: 4907 Ticket No.: 1676 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truch chute
Test Result Specification Placement Location: Stemin Demon Access bridge Piers
Slump(in): 3 3 -5 (3)
Air Content(%): 7.5 4.5-7.5
Concrete Temp.(F): 65 45-90
Ambient Temp.(F): 72
Plastic Unit Wt.(pcf):
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By
1 A 4.00 12.57 05/18/21 8.20 05/24/21 7 48,100 3,830 2 ADB
1 B 4.00 12.57 05/18/21 8.30 06/14/21 28
1 C 4.00 12.57 05/18/21 8.20 06/14/21 28
1 D 4.00 12.57 05/18/21 8.25 06/14/21 28
1 E 05/18/21 8.20 Hold
1 F 05/18/21 8.20 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF). •
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell
Report Distribution:(1)The Great Escape Theme Park,L.P.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine Reviewed By: We/1/4.
Wood Caricari M.Mc apr
Materials Department Manager
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Page 1 of 1
CR0001,11-16-12,Rev.6
CONCRETE SAMPLE PICK-UP REPORT "'�r1�a�
Report Number: JB211030.0011 U�ta�.lrerracon COMPANY
Service Date: 05/18/21 30 Corporate Cir Ste 201
Report Date: 05/19/21 Albany,NY 12203-5169
518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number: JB211030
Sample Type: 4"by 8"cylinder
Date Cast: 5/17/21
1 set of 6 samples per set were retrieved and transported to our laboratory and placed in a temperature and humidity-
controlled environment for compressive strength testing.
Services:
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor:
Report Distribution:
(1)The Great Escape Theme Park,L.P., (1)The Great Escape Theme Park,L.P.,
Rebecca Wood Lorraine Caricari
•
Reviewed By:
M.
Materials Department Manager
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0006,10-16-13,Rev.9 Page 1 of 1
r
r ill .,��
CONCRETE COMPRESSIVE STRENGTH TEST REPORT °irl�
nll'rrawn COMPANY
Report Number: JB211030.0005
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 05/19/21 Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9 .
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ID: 40018 Weather Conditions: cloudy
Supplier: Jointa Galusha LLC Accumulative Yards: 10 Batch Size(cy): 10
Batch Time: Plant: Placement Method: Direct Discharge
Truck No.: 4912 Ticket No.: 1499 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
Test Result Specification Placement Location: Outlaw ride footings
Slump(in): 4 2 -4
Air Content(%): 7.0 4.5-7.5
Concrete Temp.(F): 63 45-90
Ambient Temp.(F): 49
Plastic Unit Wt.(pcf):
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By
1 A 4.00 12.57 05/12/21 8.45 05/18/21 7 49,190 3,910 5 ADB
1 B 4.00 12.57 05/12/21 8.35 06/08/21 28
1 C 4.00 12.57 05/12/21 8.45 06/08/21 28
1 D 4.00 12.57 05/12/21 8.40 06/08/21 28
1 E 05/12/21 8.40 Hold
1 F 05/12/21 8.45 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell Industries
Report Distribution:
(1)The Great Escape Theme Park,L.P.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine
Wood Caricari
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Page 1 of 2
CR0001,11-16-12,Rev.6
ri
CONCRETE COMPRESSIVE STRENGTH TEST REPORT U irra AlferraconcoMPa,r
Report Number: JB211030.0005
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 05/19/21 Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ID: 40018 Weather Conditions: cloudy
Supplier: Jointa Galusha LLC Accumulative Yards: 50 Batch Size(cy): 10
Batch Time: 1000 Plant: _ Placement Method: Direct Discharge
Truck No.: 4913 Ticket No.: 1512 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
Test Result Specification Placement Location: Outlaw ride footings
Slump(in): 3 1/2 2 -4
Air Content(%): 6.8 4.5-7.5
Concrete Temp.(F): 65 45-90
Ambient Temp.(F): 55
Plastic Unit Wt.(pcf):
Yield(Cu.Yds.):
•
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (Ibs) Tested (days) (Ibs) (psi) Type By
2 A 4.00 12.57 05/12/21 8.70 05/18/21 7 52,970 4,220 5 ADB
2 B 4.00 12.57 05/12/21 8.60 06/08/21 28
2 C 4.00 12.57 05/12/21 8.55 06/08/21 28
2 D 4.00 12.57 05/12/21 8.65 06/08/21 28
2 E 05/12/21 8.60 Hold
2 F 05/12/21 8.55 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Not tested for plastic unit weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell Industries
Report Distribution:
(1)The Great Escape Theme Park,L.P.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine Reviewed By:
Wood Caricari M.Mc my
Materials Department Manager
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
Page 2 of 2
CR0001,11-16-12,Rev.6
•
CONCRETE COMPRESSIVE STRENGTH TEST REPORT AlErrarbr---
r COUMW
Report Number: JB211030.0010 !hod
Service Date: 05/17/21, 30 Corporate Cir Ste 201
Report Date: 06/14/21 Revision 1-28-day results Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/17/21 Sample Time: 1300
Sampled By: Philip Ayoreh
Mix ID: 20417-C Weather Conditions: sunny
Supplier: Jointa Galusha Accumulative Yards: 6.50 Batch Size(cy): 6.5
Batch Time: 1230 Plante 1 Placement Method: Direct Discharge
Truck No.: 4907 Ticket No.: 1676 Water Added Before(gal):
Water Added After(gal):
Field Test Data Sample Location: Truch chute
Test Result Specification Placement Location: Stemin Demon Access bridge Piers
Slump(in): 3 3 -5
Mr Content(%): 7.5 4.5-7.5
Concrete Temp.(F): 65 45-90
Ambient Temp.(F): 72
Plastic Unit Wt.(pcf):
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (Ibs) Tested (days) (ibs) (psi) Type By
1 A 4.00 12.57 05/18/21 8.20 05/24/21 7 48,100 3,830 2 ADB
1 B 4.00 12.57 05/18/21 8.30 06/14/21 28 58,150 4,630 2 ADB
1 C 4.00 12.57 05/18/21 8.20 06/14/21 28 55,790 4,440 2 ADB
1 D 4.00 12.57 05/18/21 8.25 06/14/21 28 57,810 4,600 2 ADB
Average(28 days) 4,560
1 E 05/18/21 8.20 Hold
1 F 05/18/21 8.20 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell
Report Distribution: Reviewed B : ff
(1)The Great Escape Theme Park,L P.,Rebecca (1)The Great Escape Theme Pads,LP.,Lorraine y
Wood Carload Jared i;s� ' -
Staff Geo ogist
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed In general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials.
Page 1 of 1
CR0001,11-16d2,Rev.6
.
JARRETT Engineers, PLLC Civil&Environmental Engineering
Statement of Special Inspections
Date: March 12, 2021
0EE_____7cEcticiLjProject: JME#01-054.75 Steamin' Demon Access Modification
Location: 1172 State Route 9, Town of Queensbury �� b "�
Owner: The Great Escape—Six Flags 2E3 1
Structural Engineer of Record: TOWN OF QUEENSr URY
Jarrett Engineers,PLLC BUILDING CODES
12 E. Washington Street
Glens Falls,NY 12801 ' I- ZOZI
Drawing Set(s) Stamped by H. Thomas Jarrett,NYS Lic.No. 057509,Rev. B - dated March 12, 2021.
Drawing List as follows:
Cover
EX1 Existing Plan FILE COPY
Cl Site Plan
C2 Elevated Walkway Plan
D 1 Construction Details
D2 Construction Details
During construction of the above referenced project, it is required that special inspections as outlined in
Chapter 17 of the 2018 International Building Code (NYS Building Code 2020) are to be provided for by
the owner. The following work components will require special inspection with the identified special
inspector entity:
Work Component Inspection Identified Special Inspector
Site/Soils/Foundations
Inspection of soil conditions/compaction Periodic Dente-TerraCon
(drawings and Geo-tech report)
Verification of soils(drawings and Geo- Periodic Dente-TerraCon
tech report)
Concrete
Placement of reinforcing steel _ Periodic .Dente-TerraCon
Concrete Mix Design Periodic Jarrett Engineers,PLLC
Concrete Materials Testing Periodic Dente-Terracon
Framing
Inspection of Steel Periodic Jarrett Engineers,PLLC
Inspection of Welding Periodic Jarrett Engineers,PLLC
Wood Decking Periodic Jarrett Engineers,PLLC
Special Inspectors are to make periodic or continuous inspections during construction as identified in chart
above or on the design drawings to review the installed structural components of the proposed structure.
Each Special Inspector is to provide the Town of Queensbury a final report of special inspection
documenting the appropriate completion of each work component inspected.
Page 1 of 2
If you have any questions or comments regarding the above please feel free to give me a call at(518)792-
2907.
Sincerely,
JARRETT Engineers,PLLC
•
Robert U.Holmes II,P.E.
Project Manager
F:IDataFile120011Sr•`o' c-hfiles'1 rr�l Esc 4 1,rs � �43•oj10,1 A5�7Vreat Escape Yenues101-054.75 Steam Demon Queue Linel Work Docs101054.75 210312 Q LinelSrce