Concrete compression 05112021 CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Report Number: JB211030.0005 nlferramncoarnawr
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 06/14/21 Revision 1-28-day results Albany,NY 12203-5169
Task: 518-266-0310
Client Project (�
The Great Escape Theme Park,L.P. The Great Escape Theme Park D v
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804 JUN 2 8 2021
Queensbury,NY 12804
Project Number:JB211030 T9111 Pi P Y.-r:rl C c4 .
Material Information Sample Information BV!i_D!�4G& CO'DES
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ID: 40018 Weather Conditions: cloudy
Supplier: Joints Galusha LLC Accumulative Yards: 10 Batch Size(cy): 10
Batch Time: Plant: Placement Method: Direct Discharge
Truck No.: 4912 Ticket No.: 1499 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
Test Result Specification Placement Location: Outlaw ride footings
Slump(in): 4 2 -4
Air Content(%): 7.0 4.5-7.5
Concrete Temp.(l): 63 45-90
Ambient Temp.(fl: 49
Plastic Unit Wt.(pct):
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By
1 A 4.00 12.57 05/12/21 8.45 05/18/21 7 49,190 3,910 5 ADB
1 B 3.99 12.5 05/12/21 8.35 06/08/21 28 58,570 4,680 2 ADB
1 C 3.99 12.5 05/12/21 8.45 06/08/21 28 59,460 4,760 2 ADB
1 D 3.99 12.5 05/12/21 8.40 06/08/21 28 60,130 4,810 2 ADB
Average(28 days) 4,750
1 E 05/12/21 8.40 Hold
1 F 05/12/21 8.45 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: Rozell Industries
Report Distribution:
(1)The Great Escape Theme Park,L.P.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine
Wood Caricari
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001,11-16-12,Rev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT 11111
K A �� ( 1 COrdAANY
Report Number: 313211030.0005
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 06/14/21 Revision 1 -28-day results Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ID: 40018 Weather Conditions: cloudy
Supplier: Jointa Galusha LLC Accumulative Yards: 50 Batch Size(cy): 10
Batch Time: 1000 Plant: Placement Method: Direct Discharge
Truck No.: 4913 Ticket No.: 1512 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
Test Result Specification Placement Location: Outlaw ride footings
Slump(in): 3 1/2 2 -4
Air Content(%): 6.8 4.5-7.5
Concrete Temp.(F): 65 45-90
Ambient Temp.(F): 55
Plastic Unit Wt.(pet):
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By
2 A 4.00 12.57 05/12/21 8.70 05/18/21 7 52,970 4,220 5 ADB
2 B 3.99 12.5 05/12/21 8.60 06/08/21 28 66,930 5,350 2 ADB
2 C 3.99 12.5 05/12/21 8.55 06/08/21 28 68,790 5,500 2 ADB
2 D 3.99 12.5 05/12/21 8.65 06/08/21 28 67,140 5,370 2 ADB
Average(28 days) 5,410
2 E 05/12/21 8.60 Hold
2 F 05/12/21 8.55 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: RozellIndustries
Report Distribution: Reviewed By:
(1)The Great Escape Theme Park,LP.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine
Wood Caricazi Jared
Staff Geo ogist
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001,11-16-12,Rev.6 Page 2 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
A`Irwraevrr coapwnr
Report Number: J131211030.0005 11"
"
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 06/28/21 Revision 2-fixing the location Albany,NY 12203-5169
Task: 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queensbury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
Material Information Sample Information
Specified Strength: 4,000 psi @ �28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ID: 40018 Weather Conditions: cloudy
Supplier: Jointa Galusha LLC Accumulative Yards: 10 Batch Size(cy): 10
Batch Time: Plant: Placement Method: Direct Discharge
Truck No.: 4912 Ticket No.: 1499 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
. Test Result Specification Placement Location: Adirondack Outlaw Ride,perimeter
Slump(in): 4 2 -4 foundation walls/retaining wall
Air Content(%): 7.0 4.5-7.5
Concrete Temp.(F): 63 45-90
Ambient Temp.(F): 49
Plastic Unit Wt.(pco:
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested
No. ZD (in) (sq in) Received. bibs) " Tested (days) (lbs) (psi) Type By
1 A 4.00 12.57 05/12/21 8.45 05/18/21 : 7 49,190 3,910 5 ADB
1 B 3.99 12.5 05/12/21 8.35 06/08/21 28 58,570 4,680 2 ADB
1 C 3.99 12.5 05/12/21 8.45 06/08/21 28 59,460 4,760 2 ADB
1 D 3.99 12.5 05/12/21 SAO 06/08/21 .28 60,130 4,810 2 ADB
Average(28 days) 4,750
1 E 05/12/21 SAO Hold
1 F 05/12/21. 8.45 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Average_compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.-
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Terracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: RozellIndustries
Report Distribution:
(1)The Great Escape Theme Pads,L.P.,Rebecca (1)The Great Escape Theme Park,LP.,Lorraine
Wood Cadcari
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed In general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client
Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CR0001.t W&12.Rev.6 Page 1 of 2
CONCRETE COMPRESSIVE STRENGTH TEST REPORT `"`°W``''``' `
Report Number: J131211030.0005 i
Service Date: 05/11/21 30 Corporate Cir Ste 201
Report Date: 06/28/21 Revision 2-fixing the location Albany,NY 12203-5169
Thsk; 518-266-0310
Client Project
The Great Escape Theme Park,L.P. The Great Escape Theme Park
Attn:Rebecca Wood 1172 State Rte 9
1172 Route 9 Queens_bury,NY 12804
Queensbury,NY 12804
Project Number:JB211030
(Material Information Sample Information
Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time:
Sampled By: Philip Ayoreh
Mix ED: 40018 Weather Conditions: cloudy
Supplier: Jointa Galusha LLC Accumulative Yards: 50 Batch Size(cy): 10
Batch Time: 1000 Plant: Placement Method: Direct Discharge
Truck No.: 4913 Ticket No.: 1512 Water Added Before(gal):
Field Test Data Water Added After(gal):
Sample Location: Truck chute
Test Result Specification Placement Location: Adirondack Outlaw Ride,perimeter
Slump(in): 3 1/2 2 -4 foundation walls/retaining wall
Air Content(%): 6.8 4.5-7.5
Concrete Temp.(F): 65 45-90
Ambient Temp.(F): 55
Plastic Unit Wt.(Oct);
Yield(Cu.Yds.):
Laboratory Test Data Age at Maximum Compressive
Set Specimen Avg Diam. Area Date Weight Date Test Land Strength Fracture Tested
No. ID (in) (sq in) Received Qbs) Tested (days) (lbs) (psi) Type By
2 A 4.00 12.57 .05/12/21 8.70 05/18/21 7 52,970 4,220 5 ADB
2 B 3.99 12.5 05/12/21 8.60 06/08/21 28 66,930 5,350. 2 ADB
2 C 3.99 12.5 05/12/21 8.55 06/08/21 28 68,790 5,500 2 ADB
2 D 3.99 12.5 05/12/21 8.65 06/08/21 28 67,140 5,370 2 ADB
Average(28 days) 5,410
2 E 05/12/21 8.60 Hold
2 F 05/12/21 8.55 Hold
Initial Cure: Onsite Cooler Final Cure: Moist Room
Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit
weight.
Note: Reported air content does not include Aggregate Correction Factor(ACF).
Samples Made By:Dente Group-A Terracon Co.'
Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples.
Dente Group-A Tlerracon Co.Rep.: Philip Ayoreh
Reported To: The foreman
Contractor: RozellIndustries
Report Distribution: Reviewed By: .
Ca The Great Escape Theme Peek L.P Rebecca The Great Escape Theme Park,LP,Lorraine Jared l/iMA
woos � Carirsri
Staff Geologist
Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231
The tests were performed In general accordance with applicable ASTM,AASHTO,or DOT test methods..This report Is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the
actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CRaoot.i i.ie.12,Rev.6 Page 2 of 2