Loading...
Concrete compression 05112021 CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: JB211030.0005 nlferramncoarnawr Service Date: 05/11/21 30 Corporate Cir Ste 201 Report Date: 06/14/21 Revision 1-28-day results Albany,NY 12203-5169 Task: 518-266-0310 Client Project (� The Great Escape Theme Park,L.P. The Great Escape Theme Park D v Attn:Rebecca Wood 1172 State Rte 9 1172 Route 9 Queensbury,NY 12804 JUN 2 8 2021 Queensbury,NY 12804 Project Number:JB211030 T9111 Pi P Y.-r:rl C c4 . Material Information Sample Information BV!i_D!�4G& CO'DES Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time: Sampled By: Philip Ayoreh Mix ID: 40018 Weather Conditions: cloudy Supplier: Joints Galusha LLC Accumulative Yards: 10 Batch Size(cy): 10 Batch Time: Plant: Placement Method: Direct Discharge Truck No.: 4912 Ticket No.: 1499 Water Added Before(gal): Field Test Data Water Added After(gal): Sample Location: Truck chute Test Result Specification Placement Location: Outlaw ride footings Slump(in): 4 2 -4 Air Content(%): 7.0 4.5-7.5 Concrete Temp.(l): 63 45-90 Ambient Temp.(fl: 49 Plastic Unit Wt.(pct): Yield(Cu.Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 05/12/21 8.45 05/18/21 7 49,190 3,910 5 ADB 1 B 3.99 12.5 05/12/21 8.35 06/08/21 28 58,570 4,680 2 ADB 1 C 3.99 12.5 05/12/21 8.45 06/08/21 28 59,460 4,760 2 ADB 1 D 3.99 12.5 05/12/21 8.40 06/08/21 28 60,130 4,810 2 ADB Average(28 days) 4,750 1 E 05/12/21 8.40 Hold 1 F 05/12/21 8.45 Hold Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Note: Reported air content does not include Aggregate Correction Factor(ACF). Samples Made By:Dente Group-A Terracon Co. Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples. Dente Group-A Terracon Co.Rep.: Philip Ayoreh Reported To: The foreman Contractor: Rozell Industries Report Distribution: (1)The Great Escape Theme Park,L.P.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine Wood Caricari Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231 The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001,11-16-12,Rev.6 Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT 11111 K A �� ( 1 COrdAANY Report Number: 313211030.0005 Service Date: 05/11/21 30 Corporate Cir Ste 201 Report Date: 06/14/21 Revision 1 -28-day results Albany,NY 12203-5169 Task: 518-266-0310 Client Project The Great Escape Theme Park,L.P. The Great Escape Theme Park Attn:Rebecca Wood 1172 State Rte 9 1172 Route 9 Queensbury,NY 12804 Queensbury,NY 12804 Project Number:JB211030 Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time: Sampled By: Philip Ayoreh Mix ID: 40018 Weather Conditions: cloudy Supplier: Jointa Galusha LLC Accumulative Yards: 50 Batch Size(cy): 10 Batch Time: 1000 Plant: Placement Method: Direct Discharge Truck No.: 4913 Ticket No.: 1512 Water Added Before(gal): Field Test Data Water Added After(gal): Sample Location: Truck chute Test Result Specification Placement Location: Outlaw ride footings Slump(in): 3 1/2 2 -4 Air Content(%): 6.8 4.5-7.5 Concrete Temp.(F): 65 45-90 Ambient Temp.(F): 55 Plastic Unit Wt.(pet): Yield(Cu.Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested No. ID (in) (sq in) Received (lbs) Tested (days) (lbs) (psi) Type By 2 A 4.00 12.57 05/12/21 8.70 05/18/21 7 52,970 4,220 5 ADB 2 B 3.99 12.5 05/12/21 8.60 06/08/21 28 66,930 5,350 2 ADB 2 C 3.99 12.5 05/12/21 8.55 06/08/21 28 68,790 5,500 2 ADB 2 D 3.99 12.5 05/12/21 8.65 06/08/21 28 67,140 5,370 2 ADB Average(28 days) 5,410 2 E 05/12/21 8.60 Hold 2 F 05/12/21 8.55 Hold Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Note: Reported air content does not include Aggregate Correction Factor(ACF). Samples Made By:Dente Group-A Terracon Co. Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples. Dente Group-A Terracon Co.Rep.: Philip Ayoreh Reported To: The foreman Contractor: RozellIndustries Report Distribution: Reviewed By: (1)The Great Escape Theme Park,LP.,Rebecca (1)The Great Escape Theme Park,L.P.,Lorraine Wood Caricazi Jared Staff Geo ogist Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231 The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001,11-16-12,Rev.6 Page 2 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT A`Irwraevrr coapwnr Report Number: J131211030.0005 11" " Service Date: 05/11/21 30 Corporate Cir Ste 201 Report Date: 06/28/21 Revision 2-fixing the location Albany,NY 12203-5169 Task: 518-266-0310 Client Project The Great Escape Theme Park,L.P. The Great Escape Theme Park Attn:Rebecca Wood 1172 State Rte 9 1172 Route 9 Queensbury,NY 12804 Queensbury,NY 12804 Project Number:JB211030 Material Information Sample Information Specified Strength: 4,000 psi @ �28 days Sample Date: 05/11/21 Sample Time: Sampled By: Philip Ayoreh Mix ID: 40018 Weather Conditions: cloudy Supplier: Jointa Galusha LLC Accumulative Yards: 10 Batch Size(cy): 10 Batch Time: Plant: Placement Method: Direct Discharge Truck No.: 4912 Ticket No.: 1499 Water Added Before(gal): Field Test Data Water Added After(gal): Sample Location: Truck chute . Test Result Specification Placement Location: Adirondack Outlaw Ride,perimeter Slump(in): 4 2 -4 foundation walls/retaining wall Air Content(%): 7.0 4.5-7.5 Concrete Temp.(F): 63 45-90 Ambient Temp.(F): 49 Plastic Unit Wt.(pco: Yield(Cu.Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Weight Date Test Load Strength Fracture Tested No. ZD (in) (sq in) Received. bibs) " Tested (days) (lbs) (psi) Type By 1 A 4.00 12.57 05/12/21 8.45 05/18/21 : 7 49,190 3,910 5 ADB 1 B 3.99 12.5 05/12/21 8.35 06/08/21 28 58,570 4,680 2 ADB 1 C 3.99 12.5 05/12/21 8.45 06/08/21 28 59,460 4,760 2 ADB 1 D 3.99 12.5 05/12/21 SAO 06/08/21 .28 60,130 4,810 2 ADB Average(28 days) 4,750 1 E 05/12/21 SAO Hold 1 F 05/12/21. 8.45 Hold Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Average_compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Note: Reported air content does not include Aggregate Correction Factor(ACF). Samples Made By:Dente Group-A Terracon Co.- Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples. Dente Group-A Terracon Co.Rep.: Philip Ayoreh Reported To: The foreman Contractor: RozellIndustries Report Distribution: (1)The Great Escape Theme Pads,L.P.,Rebecca (1)The Great Escape Theme Park,LP.,Lorraine Wood Cadcari Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231 The tests were performed In general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except In full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CR0001.t W&12.Rev.6 Page 1 of 2 CONCRETE COMPRESSIVE STRENGTH TEST REPORT `"`°W``''``' ` Report Number: J131211030.0005 i Service Date: 05/11/21 30 Corporate Cir Ste 201 Report Date: 06/28/21 Revision 2-fixing the location Albany,NY 12203-5169 Thsk; 518-266-0310 Client Project The Great Escape Theme Park,L.P. The Great Escape Theme Park Attn:Rebecca Wood 1172 State Rte 9 1172 Route 9 Queens_bury,NY 12804 Queensbury,NY 12804 Project Number:JB211030 (Material Information Sample Information Specified Strength: 4,000 psi @ 28 days Sample Date: 05/11/21 Sample Time: Sampled By: Philip Ayoreh Mix ED: 40018 Weather Conditions: cloudy Supplier: Jointa Galusha LLC Accumulative Yards: 50 Batch Size(cy): 10 Batch Time: 1000 Plant: Placement Method: Direct Discharge Truck No.: 4913 Ticket No.: 1512 Water Added Before(gal): Field Test Data Water Added After(gal): Sample Location: Truck chute Test Result Specification Placement Location: Adirondack Outlaw Ride,perimeter Slump(in): 3 1/2 2 -4 foundation walls/retaining wall Air Content(%): 6.8 4.5-7.5 Concrete Temp.(F): 65 45-90 Ambient Temp.(F): 55 Plastic Unit Wt.(Oct); Yield(Cu.Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Weight Date Test Land Strength Fracture Tested No. ID (in) (sq in) Received Qbs) Tested (days) (lbs) (psi) Type By 2 A 4.00 12.57 .05/12/21 8.70 05/18/21 7 52,970 4,220 5 ADB 2 B 3.99 12.5 05/12/21 8.60 06/08/21 28 66,930 5,350. 2 ADB 2 C 3.99 12.5 05/12/21 8.55 06/08/21 28 68,790 5,500 2 ADB 2 D 3.99 12.5 05/12/21 8.65 06/08/21 28 67,140 5,370 2 ADB Average(28 days) 5,410 2 E 05/12/21 8.60 Hold 2 F 05/12/21 8.55 Hold Initial Cure: Onsite Cooler Final Cure: Moist Room Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Note: Reported air content does not include Aggregate Correction Factor(ACF). Samples Made By:Dente Group-A Terracon Co.' Services: Sample fresh concrete at the placement locations,perform required field tests and cast compressive strength samples. Dente Group-A Tlerracon Co.Rep.: Philip Ayoreh Reported To: The foreman Contractor: RozellIndustries Report Distribution: Reviewed By: . Ca The Great Escape Theme Peek L.P Rebecca The Great Escape Theme Park,LP,Lorraine Jared l/iMA woos � Carirsri Staff Geologist Test Methods: ASTM C 31,ASTM C39,ASTM C138,ASTM C143,ASTM C172,ASTM C231,ASTM C1064,ASTM C1231 The tests were performed In general accordance with applicable ASTM,AASHTO,or DOT test methods..This report Is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CRaoot.i i.ie.12,Rev.6 Page 2 of 2