Loading...
IM Inspection Worksheet_06-12-2023_13-26-46INSPECTION WORKSHEET (FDTN-029218-2023) RC-0660-2023Case Number:Case Module:Permit Management 12/06/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:16 Pinecrest Dr Queensbury, NY 12804 296.13-1-26.2 Company Name NameContact Type Applicant Barbera Homes & Development Inc Architect OnPoint Building Design LLC Contractor Barbera Homes & Development Inc Engineer Sofia Engineering LLC Granted Permission Barbera Homes & Development Inc Primary Owner Michael Kokoletsos Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True approved#4 dowels 3 ft oc 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True approved Footing Drain stone - 6 mil poly False Piers True Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True with 2 rows #5 continuous Reinforcement in Place True with 3 rows #4 horizontally Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True December 06, 2023 Page 1 of 1