Loading...
IM Inspection Worksheet_05-12-2023_13-11-52INSPECTION WORKSHEET (RESFINAL-029217-2023) RC-0539-2022Case Number:Case Module:Permit Management 12/05/2023 Partial PassInspection Status:Inspection Date: Residential Final InspectionInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:80 Rockhurst Rd Queensbury, NY 12804 227.13-2-42 Company Name NameContact Type Applicant Joseph Sheehan Architect Rucinski Hall Architecture Contractor Vern Edwards Granted Permission Joseph Sheehan Primary Owner Joseph Sheehan Checklist Item CommentsPassed Low flow toilet 1.3 gal/flushing cycle False Bathroom Fans, if no window True 3" Plumbing Vent through roof minimum 18 inch True Grade away from foundation: 6" down, 10' out False Final Survey Plot Plan False N/A Window guards req:<2' above floor/6' above grade True Interior privacy/trim/doors/main entrance 36 True Backflow Preventors where required False Basement wall insulation R- value verified True Emergency egress below grade True Intake Openings True Safety glazing: w/in 5' of tub/shower False Site Plan / Variance required False provide site plan certification Seals on Garage Doors, esp. Wood True Not less than 3' horiz from opening of bthrn True Basement ceiling covered 2x8 fl joist or less True Attic Access Insulation = Attic R- Value False N/A roof deck with foam Gas Shut-off Exposed & Regulator 12" min abv grd False propane Platform at all exterior doors True Garage Floor Pitched True Wood deck: 2'+ from grade dia bracing required True Inter Connected True Arc Fault Breaker Habitable Spaces False Dryer Duct Max Length 35', Labeled Over 35'False Energy Sticker on Elec. Panel:R-Val. & Heating Sys False Furnace/Hot Water Heater operating True Fresh Air Intake True Basement stairs closed rise greater than 4 inches True Foam in basement/attics covered w/thermal barrier True December 05, 2023 Page 1 of 3 INSPECTION WORKSHEET (RESFINAL-029217-2023) Checklist Item CommentsPassed Outside every bedroom area True Blower Door Test Certification False N/A Fin Elect; Energy Saving Light Bulbs 90 Percent False Heat detector in garage False Gas Log In Sealed or Glass Enclosure False OK to Issue C/O False Truss ID Signage Installed at Electrical Meter False Range Hood 400+ cfm-Fresh Air REQUIRED False 4 inch Building Number Address visible from road False HVAC Vent Terminal 10' from Lot Line & Openings True Attic Access Gasketed True Jack posts in basement lagged at top and bottom True Guard at deck, porches 36" or more True 6" clearance to sill plate True Propane Tank: Proper Setback from Prop Line/Struct True 4+ Deck Joist Ledger Connections-24" From Ends True 20 Minute Fire Door/Self-Closing Hardware True Every level, Every bedroom True Furnace shut-off w/in 30 ft. or w/in line of site True within 10' of all sleeping areas True on all levels w/gas appliances (i.e. furnace)True Relief Valve ,Heat Trap/Water Temp 110 deg or less False Electronic as-builts False Pull down stairs boxed out and insulated True Battery backup True As Built Septic System False provide sign off Architect asbuilt Duct work sealed properly True OK to Issue Temporary C/O False Attic Access 22 x 30 minimum True Bathroom / Kitchen Watertight True 1/2" Gypsum or House Wall and Gable True Plumbing fixtures False Encl. Stairs Sheetrock Underside minimum ½ Gypsum True Basement Egress: 5s.f. window w/sill or Bilco door True walk out Handrail 4 or more risers True Fresh air supply 3' from grade True Outside Spigots have Air Gap True Handrail Termination at Newell Post or Wall False Flex Gas Pipe Bonding False HRV or ERV Installed per Bedroom Requirements True Guards at stairs,decks,patios 30" + above grade True December 05, 2023 Page 2 of 3 INSPECTION WORKSHEET (RESFINAL-029217-2023) Checklist Item CommentsPassed General Comments True walk through for Temporary C/O- 1. A water tight kitchen 2. A working bath 3. Complete septic system (holding tanks) provide Architect sign off 3. Property Transfer to be completed 4. Provide final electrical 5. Provide "site plan certification" 5. Provide set of temporary steps at front door Roof Complete / Exterior Finish Complete True Smoke Detectors:True Guard at stairwell at 34" or more True Carbon Monoxide Detectors:True Foundation insulation to floor True All Hot Water Systems: 3/4" or larger piping R-3 False Interior/Exterior Railings 34 to 38 True Deck Ledger-Bolted per Code True December 05, 2023 Page 3 of 3