IM Inspection Report (09-29-2023) (2) IIIIIIIIII (III IIIIIIII IIIIIIIIIII IIIIIIIIIIIIIII IIIIIII llllllllll1111111111111111111 Illl 1111 IIIII lull fill llllllll���1�1 ll`1�111111111 fill IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIUUII41 Ullllllllllll (IIIIIIII IIII IIIIIIII IIII IIII 1111I 11111 IIII II11 �lI IIII l�I II Il II U I IIIII 1 l Il I� � � I II I I II I I II II 11��11��1I1I Il IIII �� �II 111 II II II I ( 1 I II �I � IIII IIIII of
�l I
IIIII Illlllllllllfllllllllllllll�lllll ��llllllllllllllll��lllllllllll�ll��lllllll�IIIIII��IIIIIIIIIIIII��IIIII���IIIIIII���������IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIII�IIIII�IIIIIII�IIIIIIIIIIIII��IIIII�������IIIIII��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIII��������llm�lllllllllllllllllllllllllllllllllllllllllllllllllllllll�����lllllllllllllllllllllllllllllllllllll��lllllll�l�llllllll�l�llllllllll�llll���lllllllllllllllllllllll�lllllllllllllllll�llllllll�l�u��������������������������������������������������)
Case Number: RC-0495-2023 Case Module: Permit Management
Inspection Date: 09/29/2023 Inspection Status: Passed
Inspector: Charles Dyer Inspection Type: Building Insulation
Job Address: 15 Reardon Rd Parcel Number: 289.7-1-35
Queensbury, NY 12804
Contact Type Company Name Name
Applicant Jamie Walther
Contractor Absolute Design Completion
Granted Permission Michael Aspland
Primary Owner Kathleen Aspland
Checklist Item Passed Comments
Building Inspector Notes True for bathroom renovation/ insulation at exterior wall and partition
wall for sound
U Factors= .3 cfm for windows, .5 cfm for doors False
Tub Shower R-20 with Vapor Barrier False N/A
15 min thermal barrier/intumescent paint applied False
Window Sealing False
Permit Card Visible From Road True
Proper Vent, Attic Vent False
Insulation ResCheck ComCheck True R21 at wall
December 12,2023 Page 1 of 1