Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
CC-0746-2023
Office Use Only PRINCIPLE STRUCTURE PERMIT APPLICATI ON Permit#: CL' per,2a2� Permit Fee:$ 20 — Town of Queensbury Bay Road, Queensbury, NY 12804 *Rec Fee:$ 1 1R- CEJYY,vY1. rsid- 742 P:518-761-8256 www.queensbury.net Invoice#: (9 LP Flood Zone? Y eviewe Project Location: 257 Dix Ave - Building #2 Tax Map tt:303.15-1-3 Subdivision Name: NA *TOWN BD.RESOLUTION 385-2020:$1000 recreation fee for new dwelling units:single family,duplexes/two-family, multiple-family, apartments, condominiums,townhouses,and/or manufactured &modular homes, but not mobile homes.This is in addition to the permit fee(s). PROJECT INFORMATION: Residential X Commercial, Proposed Use: Autobody & Detail shop Single-Family: Two-Family Multi-Family(##of units: ) 1. Custom 2. _Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) Townhouse Garage (#of cars ) Business Office Retail Hotel/Motel Industrial Heated Warehouse/Storage Building Unheated Warehouse/Storage Building Amusement Ride Other(describe: MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1ST floor: 7,200 SF 175')OE DE m2ndtoor., 2nd floor: Nov 9 6 2023 3rd floor: Total square f et: Basement(habitable space): TOWN OF Q JEFNSBURY i BU11_i71i1dO & CODES Total square feet: 7,200 SF Principle Structure Packet Revised March 2022 ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$ 1.25M 2. Proposed use of the building: Autobody&Detail shop 3. If Commercial or Industrial, indicate the name of the business: Drive Garvey Distributors, LLC 4. Source of Heat:X Gas Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one perappliance) 5. Are there any structures not shown on the plot plan? YES X NO Explain, if yes: 6. Are there any easements on the property? YES X NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? 6.97 acres b. Is this a corner lot? YES X NO c. Will the grade be changed as a result of the construction?X YES NO d. What is the water source?X PUBLIC PRIVATE WELL e. What type of wastewater system is on the parcel?X SEWER PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I,or my agents,will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a NYS licensed land surveyor of all newly constructed facilities prior to issuance of certificate of occupancy. I have read and agree to the above: PRINT NAME: Ethan P. Hall-Architect1Agent for the Applicant SIGNATURE: CFVteze.A ri/aii DATE: 16 Nov2023 Principle Structure Packet Revised March 2022 t ' CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s):Drive Garvey Distributors, LLC-Marc Garvey Mailing Address, C/S/Z: 257 Dix Ave, Queensbury NY 12804 Cell Phone: (518 )321-4456 Land Line: (518 )240-5007 Email:mdgmdg1@gmail.com • Primary Owner(s): Name(s):Garvey Sisters, LLC Mailing Address, C/S/Z: 257 Dix Ave, Queensbury NY 12804 Cell Phone: (518 )321-4456 Land Line: (518 )240-5007 Email:mdgmdgl@gmail.com ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): Hilltop Construction - Dan Washburn Contractor Trade: General Contractor Mailing Address, C/S/Z: 21 Casey Road, Queensbury NY 12804 Cell Phone: (518 )260-7363 Land Line: (518 )747-0308 Email:danw@hilltopconstructionco.com **Workers' Comp documentation must be submitted with this application** • Architect(s)/Engineer(s): Business Name: Rucinski Hall Architecture Contact Name(s): Ethan P. Hall Mailing Address, C/S/Z: 134 Dix Ave, Glens Falls NY 12801 Cell Phone: (518 )260-2888 Land Line: (518 )741-0268 Email: ephall@rha-pc.com Contact Person for Compliance in regards to this project: Ethan P. Hall Cell Phone: (518 )260-2888 Land Line: (518 )741-0268 Email:ephall@rha-pc.com Principle Structure Packet Revised March 2022 'it FIRE MARSHAL'S OFFICE Town of Queensbury 742 Bay Road, Queensbury, NY 12804 "Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW FILE COPY Garvey Auto Body 257 Dix Ave CC-0746-2023 11/29/23 I have reviewed the submitted drawings for the above project; and offer the following comments: 1) Verify Fire extinguisher locations 2) Locks /latches shall comply with 2020 NYSFC. 3) Verify operation of existing exit / emergency lights. 4) Verify paths of egress 5) CO Detection required in offices 6) EVAC plan for both floors 7) NFPA 72 letter of compliance required for any alterations to the Fire Alarm System. -System Layout -NYS License for installer -Spec. sheets for all appliances and equipment -Central station monitoring -A witness function test by the FM office is required -HVAC.shutdown may be required Fire Marshal 's Office • Phone: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbury.net • www.queensbury.net 8) Verify Knox Box key 9) Verify Storage Deputy Fire Marshal Tyson Converse 742 Bay Road Queensbury NY 12804 518 761 8205 tysonc@queensbury.net Fire Marshal 's Office • Phone: 518-761-8206 • Fax: 518-745-4437 firemarshal@queensbunj.net • www.queensbury.net CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Email:constructiontech@live.com CLIENT: HILLTOP CONSTRUCTION COMPANY REPORT NUMBER: 1 :PAGE#:1 21 CASEY ROAD INSPECTION DATE: 12/21/23 . QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 100.115 INSPECTOR&TEST SET: SCOTT ROBBINS #17 ATT'N: MR.DAN WASHBURN AMBIENT WEATHER: 20's:CLEAR PROJECT: GARVEY DISTRIBUTION:257 DIX AVENUE,OUEENSBURY,NEW YORK OUR FILE LOCATION: 239089 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 1 : FOOTING:B/1-K/1-K/5 PLACEMENT LOCATION OF LOAD# 2: FOOTING:K/5-K/7-A/7-A/6 PLACEMENT LOCATION OF LOAD# 3: FOOTING:A/6-A/1-B/1;D/6,D/5,D/4,D/3,D/2 DELIVERED LOAD NUMBER: 1 2 3 TRUCK NUMBER/TICKET NUMBER: 4904/ 863633 4912 / 863634 4593 / 863636 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 11.00 10.30 / 21.30 11.00 / 32.30 TIME CONC. BATCHED/ARRIVED: 9.47/ 10.25 10.50 / 10.46 10.58 / 11.15 TIME PLACEMENT BEGAN/ENDED: 10.30/ 10.45 / 11.05 11.20 / 11.45 CONCRETE AGE(HOURS) (SPEC: MAX: 2.00) 0.97 0.25 0.78 SLUMP ON ARRIVAL (INCHES) 4.50 4.00 4.00 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: 4.50 4.00 4.00 PLACEMENT SLUMP(INCH) (SPEC: ) 4.50 4.00 4.00 ENTRAINED AIR (%VOL) (SPEC: ) 5.50 UNIT WEIGHT (PCF) (SPEC: - ) 147.60 CONCRETE TEMP. (F) (SPEC 45 - 90) 60 61 59 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBERS 239089- 239094 DISCREPANCIES&REMARKS: PLACEMENT AREA REINFORCEMENT: CLEANLINESS&COVER ACCEPTABLE.PROPERLY SIZED&LOCATED. UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA CONCRETE,INC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.@ 28 DAYS : UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 12/22/23 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 239089 12/28/23 7 64,200 5110 COARSE AGGREGATE#2: LBS. 239090 12/28/23 7 64,850 5160 COARSE AGGREGATE#3: LBS. 239091 01/18/24 28 FINE AGGREGATE: LBS. 239092 01/18/24 28 ADMIXTURE#1: OZS. 239093 01/18/24 28 ADMIXTURE#2: OZS. 239094 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4; 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY ROBERT BEHAN (NICET) MANAGER TECHNICAL SVCS. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Email:constructiontech@live.com CLIENT: HILLTOP CONSTRUCTION COMPANY REPORT NUMBER: •PAGE#:1 21 CASEY ROAD INSPECTION DATE: QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: INSPECTOR&TEST SET: SCOTT ROBBINS #17 ATT'N: MR.DAN WASHBURN AMBIENT WEATHER: 40's:LIGHT RAIN PROJECT: GARVEY DISTRIBUTION:257 DIX AVENUE,QUEENSBURY,NEW YORK OUR FILE LOCATION: 239284 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 1 : FOUNDATION WALL:A/1-A/7 PLACEMENT LOCATION OF LOAD# 2: FOUNDATION WALL:A/7-K/7 PLACEMENT LOCATION OF LOAD# 3: FOUNDATION WALL:K/7-K/1 DELIVERED LOAD NUMBER: 1 2 3 TRUCK NUMBER/TICKET NUMBER: 4912/ 863720 4613 / 863721 4525 / 863722 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 11.00 11.00 / 22.00 11.00 / 33.00 TIME CONC. BATCHED/ARRIVED: 6.35/ 7.00 6.52 / 7.10 7.15 / 7.35 TIME PLACEMENT BEGAN 1 ENDED: 7.05/ 7.15 7.18 I 7.25 7.35 / 7.51 CONCRETE AGE(HOURS) (SPEC: MAX: 2.00) 0.67 0.55 0.60 SLUMP ON ARRIVAL (INCHES) 5.00 5.00 5.50 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: 5.00 5.00 5.50 PLACEMENT SLUMP(INCH) (SPEC: ) 5.00 5.00 5.50 ENTRAINED AIR (%VOL) (SPEC: ) 5.10 UNIT WEIGHT (PCF) (SPEC: - ) 147.19 CONCRETE TEMP. (F) (SPEC 45 - 90) 70 68 67 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBERS 239284- 239289 DISCREPANCIES&REMARKS: PLACEMENT AREA REINFORCEMENT: CLEANLINESS&COVER ACCEPTABLE.PROPERLY SIZED&LOCATED. UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA CONCRETE,INC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: • 4000 P.S.I.@ 28 DAYS : UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 12/30/24 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 239284 01/05/25 7 59,700 4750 COARSE AGGREGATE#2: LBS. 239285 01/05/25 7 59,150 4710 COARSE AGGREGATE#3: LBS. 239286 01/26/25 28 FINE AGGREGATE: LBS. 239287 01/26/25 28 ADMIXTURE#1: OZS. 239288 01/26/25 28 ADMIXTURE#2: OZS. 239289 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS, REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY ROBERT BEHAN (NICET) MANAGER TECHNICAL SVCS. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Email:constructiontech@live.cotn CLIENT: HILLTOP CONSTRUCTION COMPANY REPORT NUMBER: 2 :PAGE#:2 21 CASEY ROAD INSPECTION DATE: 12/29/24 QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 100.115 INSPECTOR&TEST SET: SCOTT ROBBINS #17 ATT'N: MR.DAN WASHBURN AMBIENT WEATHER: 40's:LIGHT RAIN PROJECT: GARVEY DISTRIBUTION:257 DIX AVENUE,OUEENSBURY,NEW YORK OUR FILE LOCATION: CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 4: FOUNDATION WALL:K/1-A/1 DELIVERED LOAD NUMBER: 4 TRUCK NUMBER/TICKET NUMBER: 4587/ 863723 YARDAGE DELIVERED/SUBTOTAL: 10.00/ 43.00 TIME CONC. BATCHED/ARRIVED: 7.24/ 7.50 TIME PLACEMENT BEGAN/ENDED: 7.55/ 8.15 CONCRETE AGE(HOURS) (SPEC: MAX: 2.00) 0.85 SLUMP ON ARRIVAL (INCHES) 4.50 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: 4.50 PLACEMENT SLUMP(INCH) (SPEC: ) 4.50 ENTRAINED AIR (/VOL) (SPEC: UNIT WEIGHT (PCF) (SPEC: - ) CONCRETE TEMP. (F) (SPEC 45 - 90) 70 NUMBER OF TEST SPECIMEN CAST LAB CYLINDER CONTROL NUMBERS DISCREPANCIES&REMARKS: PLACEMENT AREA REINFORCEMENT: CLEANLINESS&COVER ACCEPTABLE.PROPERLY SIZED&LOCATED. UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA CONCRETE,INC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.@ 28 DAYS : UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 12/30/24 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. COARSE AGGREGATE#2: LBS. COARSE AGGREGATE#3: LBS. FINE AGGREGATE: LBS. ADMIXTURE#1: OZS. ADMIXTURE#2: OZS. ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY ROBERT BEHAN (NICET) MANAGER TECHNICAL SVCS. Rhvac Online Elite Softwarel'Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York i Page 1 Manual S Performance Data - System I - Main Loads and Design Conditions Cooling: Outdoor Dry Bulb: 71 Sensible Gain: 75.000 Outdoor Wet Bulb: 71 Latent Gain: 21.000 Indoor Dry Bulb: 75 Total Gain: 96.000 Indoor RH: 50 Load SHR: 0.78 Supply Airflow: 3200 Entering Dry Bulb: 75 Entering Wet Bulb: 62.5 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions This system's equipment was selected in accordance with ACCA Manual S. Cooling: Model Type:Standard Air Conditioner,Outdoor Model:YC2D48SB21, Indoor Model:XAHD6OGBCN1 AHRI Reference Number:210541931, Nominal Capacity:96.000, Manufacturer:York Entered Interpolation Data: EDB EDB Total 75°F 75°F • EWB Airflow ODB • Capacity Sen:Cap Sen.Cap °F CFM °F MBtuh S/T MBtuh 62.5 3200 71 96 0.78 75 Interpolation Results: Percent Load of Load Sensible Capacity: 75.000 75.000 100% Latent Capacity: 21.000 21.000 100% Total Capacity: 96.000 96.000 100% Heating: Model Type:Natural Gas Furnace,Model:TM9Y120D2OMP11, Nominal Capacity:240.000, Manufacturer:York Results: Percent Load of Load Heating Capacity: 240.000 174.000 138% FILE r��v Garvey Hyundai Monday, December 18,2023 Rhvac Online Elite Softwarel Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York Page 2 Manual S Performance Data - System 2-Additional.System Loads and Design Conditions I� Cooling: Outdoor Dry Bulb: 0 Sensible Gain: 0.000 Outdoor Wet Bulb: .71 Latent Gain: 0.000 Indoor Dry Bulb: 75 Total Gain: 0.000 Indoor RH: 50 Load SHR: 0.00 Supply Airflow: 0 Entering Dry Bulb: 0 Entering Wet Bulb: 0 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions Cooling: Model Type: , Manufacturer: Interpolation Results: Percent Load of Load Sensible Capacity: 0.000 0.000 0% Latent Capacity: 0.000 0.000 0% Total Capacity: 0.000 0.000 0% Heating: Model Type:, Model: , Manufacturer: Results: Percent Load of Load Heating Capacity: 0.000 174.000 0% Garvey Hyundai Monday, December 18,2023 Rhvac Online Elite Software Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York Page 3 Manual S Performance Data - System 3 -Another Additional System Loads and Design Conditions Cooling: Outdoor Dry Bulb: 0 Sensible Gain: 0.000 Outdoor Wet Bulb: 71 Latent Gain: 0.000 Indoor Dry Bulb: 75 Total Gain: 0.000 Indoor RH: 50 Load SHR: 0.00 Supply Airflow: 0 Entering Dry Bulb: 0 Entering Wet Bulb: 0 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions �C Cooling: Model Type: , Manufacturer: Interpolation Results: Percent Load of Load Sensible Capacity: 0.000 0.000 0% Latent Capacity: 0.000 0.000 0% Total Capacity: 0.000 0.000 0% Heating: Model Type:, Model: , Manufacturer: Results: Percent Load of Load Heating Capacity: 0.000 174.000 0% Garvey Hyundai Monday, December 18,2023 t COMcheck Software Version 4.1.5.5 FILE COPY Envelope Compliance Certificate roject Information '� F AEG�" O �D �' Energy Code: 2018 IECC l r�_ -9_ t__ 4 ip_; ` D (/� Project Title: Drive Garvey j — _—� ri- I C [D II Location: Glens Falls, New York 11 �e�p 9y [� n,� / ( U „1 L1 n co 2 c.:`.L (Climate Zone: 6a , >y L1 (05 Project Type: New Construction 7."—:I/VP`'�� �.; i _ ertical Glazing/Wall Area: 1% `111 r,s `t ,f;,`( a IVOJ 0 Construction Site: Owner/Agent: Designer/Contractor: 0 n 257 Dix Ave Marc Garvey Ethan P. Hall CU C Building#2 Drive Garvey Distributors, LLC Rucinski Hall Architecture NJQueensbury, NY 12804 257 Dix Ave 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 p i 518-321-4456 518-741-0274 O N mdgmdgl@gmail.com ephall@nycap.rr.com cn 0 NJAdditional Efficiency Package(s) '-,., ' ' W Credits: 1.0 Required 1.0 Proposed Enhanced Interior Lighting Controls,1.0 credit Building Area Floor Area REVIEWED FOR 1-Automotive Facility: Nonresidential 7200ENERGY CODE COMPLIANCE Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor1a> Perimeter Roof 1:Metal Building,Standing Seam,Liner System with Thermal 7200 38.0 0.0 0.030 0.031 Blocks(d),[Bldg.Use 1-Automotive Facility] Floor 1:Slab-On-Grade:Unheated,Vertical 4 ft.,[Bldg.Use 1 - 342 — 10.0 0.480 0.540 Automotive Facility](c) NORTH Exterior Wall 3:Metal Building Wall,Single Layer Mineral Fiber(in 1536 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Automotive Facility] EAST Exterior Wall 2:Metal Building Wall,Single Layer Mineral Fiber(in 1275 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Automotive Facility] Door 6:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 — -- 0.070 0.310 Automotive Facility] Door 7:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 — -- 0.070 0.310 Automotive Facility] Door 8:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 -- -- 0.070 0.310 Automotive Facility] Door 9:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 -- -- 0.070 0.310 Automotive Facility] Door 10:Insulated Metal,Swinging,[Bldg.Use 1 -Automotive Facility] 21 -- — 0.300 0.370 SOUTH Exterior Wall 1:Metal Building Wall,Single Layer Mineral Fiber(in 1728 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Automotive Facility]• Project Title: Drive Garvey - Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody'& Page 1 of 20 Detail Shop.cck Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(e) Perimeter Window 1:Metal Frame with Thermal Break:Fixed,Pert.Specs.: 32 -- — 0.290 0.360 Product ID product label,SHGC 0.33,[Bldg.Use 1 -Automotive Facility](b) Door 1:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 — -- 0.070 0.310 Automotive Facility] Door 2:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 -- -- 0.070 0.310 Automotive Facility] Door 3:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 — — 0.070 0.310 Automotive Facility] Door 4:Insulated Metal,Garage door 14%glazing,[Bldg.Use 1 - 100 -- -- 0.070 0.310 Automotive Facility] Door 5:Insulated Metal,Swinging,[Bldg.Use 1 -Automotive Facility] 21 — — 0.300 0.370 WEST Exterior Wall 4:Metal Building Wall,Single Layer Mineral Fiber(in 1275 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Automotive Facility] Door 11:Insulated Metal,Swinging,[Bldg.Use 1 -Automotive Facility] 21 — — 0.300 0.370 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. (d)Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt,and the roof deck secured to the purlins. Envelope PASSES:.Design 24%better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck V- ion 4..L- 5 an' to comply with any applicable mandatory requirements listed in the Inspection Checklist. " ^ / ,.� .dR" Ethan P.Hall-Architect z;. `F 4!'�I`l�+L�7 Name-Title Signati '3} Date • Project Title: Drive Garvey Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave"Hyundai\Body&Detail Shop-2023\Const bwg's\Drive Garvey-Autobody& Page 2 of 20 Detail Shop.cck AlCOMcheck Software Version 4.1.5.5 i Interior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Drive Garvey Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 257 Dix Ave Marc Garvey Ethan P.Hall , Building#2 Drive Garvey Distributors, LLC Rucinski Hall Architecture Queensbury, NY 12804 257 Dix Ave 134 Dix Ave Queensbury,NY 12804 Glens Falls, NY 12801 518-321-4456 518-741-0274 mdgmdgl@gmail.com ephall@nycap.rr.com Additional Efficiency Package(s) Credits: 1.0 Required 1.0 Proposed Enhanced Interior Lighting Controls, 1.0 credit Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Automotive Facility 7200 0.71 5112 Total Allowed Watts= 5112 Proposed Interior Lighting Power • A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Automotive Facility LED 1:LED Linear 17W: 1 17 64 1088 LED 2:LED PAR 17W: 1 17 64 1088 LED 3:LED Linear 17W: 1 5 34 170 Total Proposed Watts= 2346 Interior Lighting PASSES: Design 54% better than code • Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck ion 4 5.5 a d to comply with any applicable mandatory requirements listed in the Inspection Checklist. //,� Ethan P.Hall-Architect ' ,G jVy 1 A as Name-Title Sig ture Date • Project Title: Drive Garvey • Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop:2023\Const Dwg's\Drive Garvey:Autobody& Page 3 of 20 Detail Shop.cck \( COMcheck Software Version 4.1.5.5 1 Exterior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Drive Garvey Project Type: New Construction Exterior Lighting Zone 4(High activity metropolitan commercial district(LZ4)) Construction Site: Owner/Agent: Designer/Contractor: . 257 Dix Ave Marc Garvey Ethan P. Hall Building#2 Drive Garvey Distributors, LLC Rucinski Hall Architecture Queensbury, NY 12804 257 Dix Ave 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 518-321-4456 518-741-0274 mdgmdgl@gmail.com ephall@nycap.rr.com Allowed Exterior Lighting Power A Area/Surface Category Quantity Allowed Tradable Allowed Wafts Watts/Unit Wattage (B X C) Entry canopy 3 ft2 0.4 Yes 1 Total Tradable Watts(a)= 1 Total Allowed Watts= 1 Total Allowed Supplemental Watts(b)= 900 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 900 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry canopy(3 ft2):Tradable Wattage LED 1:LED PAR 17W: 1 7 64 448 Total Tradable Proposed Watts= 448 Exterior Lighting PASSES: Design 50%better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck V 4.1.5,E an., c.j.sly with any applicable mandatory requirements listed in the Inspection Checklist. elk � ,// }�,J Ethan P.Hall-Architect /6 Av. gm Name-Title Sign re Date • Project Title: Drive Garvey • Report-date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 4 of 20 Detail Shop.cck COMcheck Software Version 4.1.5.5 Mechanical Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: Drive Garvey Location: Glens Falls, New York Climate Zone: 6a Project Type: New Construction Construction Site: Owner/Agent: • Designer/Contractor: • 257 Dix Ave Marc Garvey Ethan P. Hall Building#2 Drive Garvey Distributors, LLC Rucinski Hall Architecture Queensbury, NY 12804 257 Dix Ave 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 518-321-4456 518-741-0274 mdgmdgl@gmail.com ephall@nycap.rr.com Additional Efficiency Package(s) • Credits: 1.0 Required 1.0 Proposed Enhanced Interior Lighting Controls, 1.0 credit Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 (Single Zone): Heating:6 each-Unit Heater,Gas,Capacity=45 kBtu/h Proposed Efficiency=93.00%Ec,Required Efficiency: 80.00%Ec Fan System: FAN SYSTEM 1—Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Constant Volume,500 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck .: sion 4.1. an• • co ply with any applicable mandatory requirements listed in the Inspection Checklist. �i / �,�� Ethan P. Hall-Architect • �6ec�r•L:(/!�7 Name-Title • Si..- ure date • Project Title: Drive Garvey Report date: 11/1.6/23 Data filename: Y:\Garvey\Diix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 5 of 20 Detail Shop.cck COMcheck Software Version 4.1..5.5 firli;:lic Inspection Checklist I Energy Code: 2018 IECC Requirements: 88.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section ; Plan Review Complies? Comments/Assumptionsl & Req.ID i! C103.2 Plans and/or specifications provide all ❑Complies Requirement will be met. (PR1]1 information with which compliance ❑Does Not can be determined for the building ❑Not Observable Location on plans/spec:A-1 • envelope and document where !exceptions to the standard are ❑Not Applicable ;claimed. C103.2 Plans,specifications,and/or ❑Complies Requirement will be met. [PR2]1 calculations provide all information ❑Does Not with which compliance can be :Not Observable Location on plans/spec:A-1 determined for the mechanical systems and equipment and ❑Not Applicable document where exceptions to the standard are'claimed. Load calculations per acceptable engineering standards and handbooks. C103.2 Plans,specifications, and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable Location on plans/spec:A-1 determined for the interior lighting and electrical systems and equipment :Not Applicable and document where exceptions to the standard are claimed.Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C103.2 Plans,specifications,and/or ❑Complies Requirement will be met. [PR8]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable Location on plans/spec:A-1 determined for the exterior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to • • the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. C402.4.1 The vertical fenestration area<= 30 ❑Complies Requirement will be met. [PR10]1 percent of the gross above-grade wall ❑Does Not area. Location on plans/spec:A-1 :Not Observable ❑Not Applicable C402.4.1 The skylight area <=3 percent of the ;❑Complies Requirement will be met. [PR11]1 gross roof area. ;❑Does Not ❑Not Observable Location on plans/spec:A-1 ONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 6 of 20 Detail Shop.cck Section Plan Review Complies? Comments/Assumptions & Req.ID li C406 Plans,specifications, and/or OComplies Requirement will be met. [PR9]1 calculations provide all information ODoes Not with which compliance can be ❑Not Observable Location on plans/spec:A-1 determined for the additional energy efficiency package options. ❑Not Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1)_ 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey • Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 7 of 20 Detail Shop.cck Section II _ # Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID 11 C303.2 ;Slab edge insulation installed per DComplies Requirement will be met. [FO4)2 manufacturer's instructions. ODoes Not ONot Observable Location on plans/spec:A-1 DNot Applicable C303.2.1 Exterior insulation protected against DComplies Requirement will be met. [FO6]1 damage,sunlight, moisture,wind, DDoes Not landscaping and equipment maintenance activities. DNot Observable DNot Applicable C105 ;Installed slab-on-grade insulation type ❑Complies See the Envelope Assemblies table for values. [FO3]2 i and R-value consistent with insulation ❑Does Not i specifications reported in plans and COMcheck reports. ONot Observable ONot Applicable C402.2.4 ;Slab edge insulation depth/length. ❑Complies , Exception: Requirement does not apply. [FO7]2 i Slab insulation extending away from ❑Does Not i building is covered by pavement or ONot Observable See the Envelope Assemblies table for values. >= 10 inches of soil. ONot Applicable C403.12.2 Snow/ice melting system and freeze DComplies Exception: Requirement does not apply. protection systems have sensors and ❑Does Not C403.12.3 controls configured to limit service for [FO9]3 pavement temperature and outdoor ONot Observable temperature.future connection to DNot Applicable ' controls. . Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ] Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave.Hyuhdai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 8 of 20 Detail Shop.cck Section II . # Framing/Rough-In Inspection Complies? Comments/Assumptions & Req.ID q C303.1.3 ;Fenestration products rated in DComplies Requirement will be met. [FR12]2 accordance with NFRC. ❑Does Not ' ['Not Observable Location on plans/spec:A-1 ' DNot Applicable C303.1.3 :Fenestration products are certified as DComplies Requirement will be met. [FR13]1 ito performance labels or certificates ❑Does Not provided. Location on plans/spec:A-1 ❑Not Observable DNot Applicable C402.4.3 Vertical fenestration SHGC value. DComplies See the Envelope Assemblies table for values. [FR10]1 ❑Does Not DNot Observable DNot Applicable C402.4.3, Installed vertical fenestration U-factor DComplies See the Envelope Assemblies table for values. • C402.4.3. and SHGC consistent with label ❑Does Not 4 1 specifications and as reported in plans ❑Not Observable [FR8] and COMcheck reports. DNot Applicable C402.5.7 ;Vestibules are installed on all building DComplies Exception: Requirement does not apply. [FR17]3 ;entrances. Doors have self-closing DDoes Not devices. ❑Not Observable . DNot Applicable . Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 ILow Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Cbnst Dwg's\Drive Garvey-Autobody& Page . 9 of 20 Detail Shop.cck Section # Plumbing Rough-In Inspection Complies? . Comments/Assumptions & Req.ID C404.5, I Heated water supply piping conforms DComplies C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements.Refer to section details. [PL6]3 :Not Observable ❑Not Applicable C404.6.3 Pumps that circulate water between a DComplies [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <=5 minutes after end of heating [Not Observable cycle. ❑Not Applicable C404.7 Demand recirculation water systems DComplies [PL8]3 have controls that start the pump ❑Does Not upon receiving a signal from the •action of a user of a fixture or ❑Not Observable l appliance and limits the temperature ❑Not Applicable • of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)- Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\ConstDwg's\Drive Garvey-Autobody& Page 10 of. 20 Detail Shop.cck Section Mechanical Rough-In Inspection Complies? Comments/Assumlptions & Req.ID 11 C402.2.6 'Thermally ineffective panel surfaces of❑Complies Exception: Requirement does not apply. [ME41]3 !sensible heating panels have ❑Does Not ;insulation >= R-3.5. ❑Not Observable ❑Not Applicable C402.5.5, Stair and elevator shaft vents have ❑Complies Exception: Requirement does not apply. C403.2.4. motorized dampers that automatically EDoes Not 3 3 close. Refernece section C403.7.7 for [Not Observable [ME3] operational details. ❑Not Applicable C403.7.7 Outdoor air and exhaust systems have ❑Complies Requirement will be met. [ME58]3 motorized dampers that automatically ❑Does Not shut when not in use and meet ❑Not Observable Location on plans/spec:A-1 maximum leakage rates.Check gravity dampers where allowed. ❑Not Applicable Reference section language for operational details. C403.11.3 I HVAC piping insulation insulated in ❑Complies [ME61]2 accordance with Table C403.11.3. ❑Does Not ;Insulation exposed to weather is protected from damage and is ❑Not Observable provided with shielding from solar ❑Not Applicable radiation. C403.8.4 !Motors for fans that are not less than ❑Complies [ME142]2 1/12 hp and less than 1 hp are ❑Does Not ;electronically commutated motors or ❑Not Observable have a minimum motor efficiency of ❑Not Applicable 70 percent.These motors have the pP means to adjust motor speed. C403.8.5 !Each DX cooling system > 65 kBtu ❑Complies [ME143]2 and chiller water/evaporative cooling ❑Does Not ;system with fans> 1/4 hp are designed to vary the indoor fan airflow ❑Not Observable as a function of load and comply with ❑Not Applicable ,detailed requirements of this section. C403.12.1'Systems that heat outside the building ❑Complies Exception: Requirement does not apply. [ME71]2 !envelope are radiant heat systems ❑Does Not controlled by an occupancy sensing I device or timer switch. ❑Not Observable ❑Not Applicable C403.2.3 HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 ❑Does Not ❑Not Observable ❑Not Applicable C403.2.2 Natural or mechanical ventilation is ❑Complies Requirement will be met. [ME59]1 provided in accordance with ❑Does Not International Mechanical Code ❑Not Observable Location on plans/spec:A-1 Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply ❑Not Applicable to minimum per IMC Chapter 4. C403.7.1 Demand control ventilation provided ❑Complies Exception: Requirement does not apply. [ME59]1 for spaces>500 ft2 and >25 ❑Does Not people/1000 ft2 occupant density and served by systems with air side ❑Not Observable economizer,auto modulating outside ❑Not Applicable air damper control, or design airflow >3,000 cfm. C403.7.2 Enclosed parking garage ventilation DComplies Exception: Requirement does not apply. [ME115]3 has automatic contaminant detection ❑Does Not and capacity to stage or modulate fans to 50%or less of design capacity. :Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)- • Project Title: Drive Garvey • Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Cohst Dwg's\Drive Garvey-Autobody& Page 11 of 20 Detail Shop.cck Section Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.7.6 !HVAC systems serving guestrooms in DComplies Exception: Requirement does not apply. [ME141]3 :Group R-1 buildings with> 50 ODoes Not guestrooms: Each guestroom is provided with controls that ['Not Observable automatically manage temperature ❑Not Applicable setpoint and ventilation (see sections C403.7.6.1 and C403.7.6.2). C403.7.4 Exhaust air energy recovery on ❑Complies Exception: Requirement does not apply. [ME57]1 systems meeting Table C403.7.4(1) ODoes Not and C403.7.4(2). ['Not Observable ENot Applicable C403.7.5 'Kitchen exhaust systems comply with DComplies Exception: Requirement does not apply. [ME116]3 replacement air and conditioned ODoes Not supply air limitations, and satisfy hood rating requirements and maximum ['Not Observable exhaust rate criteria. DNot Applicable C403.11.1;HVAC ducts and plenums insulated in DComplies Exception: Requirement does not apply. accordance with C403.11.1 and ODoes Not C403.11.2:constructed in accordance with [ME60]2 'C403.11.2,verification may need to DNot Observable 'occur during Foundation Inspection. DNot Applicable C403.4.1. ,Heating for vestibules and air curtains DComplies Exception: Requirement does not apply. 4 •with integral heating include ❑Does Not [ME63]2 automatic controls that shut off the heating system when outdoor air ❑Not Observable temperatures>45F.Vestibule DNot Applicable heating and cooling systems :controlled by a thermostat in the vestibule with heating setpoint<= :60F and cooling setpoint>=80F. C408.2.2. ',Air outlets and zone terminal devices DComplies Exception: Requirement does not apply. 1 have means for air balancing. ❑Does Not [ME53]3 [Not Observable ❑Not Applicable C403.5, Refrigerated display cases,walk-in DComplies Exception: Requirement does not apply. C403.5.1, coolers or walk-in freezers served by ❑Does Not C403.5.2 remote compressors and remote [ME123]3 condensers not located in a ❑Not Observable condensing unit, have fan-powered ONot Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)- Project Title: Drive Garvey Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 12 of 20 Detail Shop.cck Section • # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. Spaces required to have light- ;❑Complies Requirement will be met. 2 reduction controls have a manual '❑Does Not [EL22]1 control that allows the occupant to Location on plans/spec:A-1 reduce the connected lighting load in a reasonably uniform illumination ❑Not Applicable ,pattern >=50 percent. C405.2.1, Occupancy sensors installed in ❑Complies Requirement will be met. C405.2.1. classrooms/lecture/training rooms, ❑Does Not 1 conference/meeting/multipurpose [EL18]1 rooms,copy/print rooms, Not Observable lounges/breakrooms,enclosed offices, ❑Not Applicable open plan office areas, restrooms, storage rooms, locker rooms, warehouse storage areas,and other spaces<=300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. C405.2.1. Occupancy sensors control function in ;❑Complies Exception: Requirement does not apply. 2 warehouses: In warehouses,the ;❑Does Not [EL19]1 lighting in aisleways and open areas is•❑Not Observable controlled with occupant sensors that automatically reduce lighting power pilot Applicable by 50%or more when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. C405.2.1. Occupant sensor control function in ❑Complies Exception: Requirement does not apply. 3 open plan office areas: Occupant ODoes Not [EL20]1 sensor controls in open office spaces ['Not Observable >=300 sq.ft. have controls 1) ❑Not Applicable e configured so that general lighting can PP be controlled separately in control zones with floor areas<= 600 sq.ft. within the space, 2)automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 3)are configured so that general lighting power in each control zone is reduced by>= 80%of the full zone general lighting power within 20 minutes of all occupants leaving that control zone, and 4)are configured such that any daylight responsive control will activate space general lighting or control zone general lighting only when occupancy for the same area is detected. C405.2.2, ,Each area not served by occupancy EComplies Requirement will be met. C405.2.2. i sensors(per C405.2.1)have time- ❑Does Not 1, 'switch controls and functions detailed Location on plans/spec:A-1 C405.2.2. `in sections C405.2.2.1 and C405.2.2.2. Not Observable 2 ❑Not Applicable [EL21]2 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 13 of 20 Detail Shop.cck Section '1 # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID ;! C405.2.3, Daylight zones provided with ❑Complies Exception: Requirement does not apply. C405.2.3. individual controls that control the ❑Does Not 1, 'lights independent of general area C405.2.3. lighting.See code section C405.2.3 ❑Not Observable 2 Daylight-responsive controls for ❑Not Applicable [EL23]2 ;applicable spaces,C405.2.3.1 Daylight responsive control function and 'section C405.2.3.2 Sidelit zone. C405.2.4 Separate lighting control devices for ❑Complies Requirement will be met. [EL26]1 specific uses installed per approved ❑Does Not lighting plans. Location on plans/spec:A-1 ['Not Observable ENot Applicable C405.2.4 Additional interior lighting power ❑Complies Requirement will be met. [EL27]1 allowed for special functions per the EDoes Not approved lighting plans and is ❑Not Observable Location on plans/spec:A-1 automatically controlled and separated from general lighting. ENot Applicable C405.2.5 Manual controls required by the ❑Complies Requirement will be met. [EL28]na° energy code are in a location with EDoes Not ready access to occupants and :Not Observable Location on plans/spec:A-1 located where the controlled lights are visible,or identify the area served and ENot Applicable their status. C405.2.6 Automatic lighting controls for exterior ❑Complies • Exception: Requirement does not apply. [EL3O]null lighting installed.Controls will be ❑Does Not daylight controlled, set based on business operation time-of-day, or :Not Observable ;reduce connected lighting > 30%. ENot Applicable C405.3 Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 face. ❑Does Not ENot Observable Location on plans/spec:A-1 ENot Applicable C405.6 Low-voltage dry-type distribution ❑Complies Exception: Requirement does not apply. [EL26]2 electric transformers meet the ❑Does Not minimum efficiency requirements of Table C405.6. ENot Observable ENot Applicable C405.7 Electric motors meet the minimum EComplies Exception: Requirement does not apply. [EL27]z efficiency requirements of Tables Does Not C405.7(1)through C405.7(4). ['Not Observable Efficiency verified through certification under an approved certification ENot Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.8.2, 'Escalators and moving walks comply '❑Complies Exception: Requirement does not apply. C405.8.2. ,with ASME A17.1/CSA B44 and have EDoes Not 1 automatic controls configured to [EL28]2 'reduce speed to the minimum plot Observable permitted speed in accordance with ENot Applicable ;ASME A17.1/CSA B44 or applicable local code when not conveying passengers. C405.9 ;Total voltage drop across the ElComplies Exception: Requirement does not apply. [EL29]z combination of feeders and branch EDoes Not circuits<=5%. :Not Observable • ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Corist Dwg's\Drive Garvey-Autobody& Page 14 of 20 Detail Shop.cck 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)-1 • Project Title: Drive Garvey • Report date: 11/16/23 • Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 15 of 20 Detail Shop.cck Section ' • # Insulation Inspection Complies? Comments/Assumptions & Req.ID :; C303.1 Roof insulation installed per ❑Complies Requirement will be met. [IN3]1 manufacturer's instructions. Blown or ODoes Not poured loose-fill insulation is installed ONot Observable Location on plans/spec:A-1 only where the roof slope is<=3 in 12. ,❑Not Applicable C402.2.1 Insulation installed on a suspended ❑Complies Exception: Requirement does not apply. (IN20)1 ceiling having ceiling tiles is not being ODoes Not specified for roor/ceiling assemblies. Continuous insulation board installed ONot Observable in 2 or more layers with edge joints Observable,__, Applicable offset between layers. C303.1 'Building envelope insulation is labeled ❑Complies Requirement will be met. [IN10]2 with R-value or insulation certificate ODoes Not providing R-value and other relevant data. ONot Observable Not Applicable • C303.2 Above-grade wall insulation installed EComplies Requirement will be met. [IN7]1 per manufacturer's instructions. ODoes Not ❑Not Observable Location on plans/spec:A-1 ❑Not Applicable C303.2.1 'Exterior insulation is protected from OComplies Exception: Requirement does not apply. [IN14]2 ;damage with a protective material. ODoes Not •Verification for exposed foundation insulation may need to occur during ❑Not Observable Foundation Inspection. ONot Applicable C105 Installed above-grade wall insulation ❑Complies See the Envelope Assemblies table for values. [IN6]1 type and R-value consistent with ODoes Not insulation specifications reported in plans and COMcheck reports. ONot Observable DNot Applicable C402.2.3 Installed floor insulation type and R- ❑Complies See the Envelope Assemblies table for values. [IN8]2 'value consistent with insulation ODoes Not specifications reported in plans and COMcheck reports. ONot Observable ONot Applicable C402.2.6 Radiant panels and associated ❑Complies Exception: Requirement does not apply. [IN18]3 components,designed for heat ❑Does Not transfer from the panel surfaces to the occupants or indoor space are ONot Observable insulated with a minimum of R-3.5. :Not Applicable C105 Installed roof insulation type and R- ❑Complies See the Envelope Assemblies table for values. [IN2]1 value consistent with insulation ODoes Not specifications reported in plans and COMcheck reports. For some ceiling ['Not Observable systems,verification may need to ❑Not Applicable occur during Framing Inspection. C402.5.1. All sources of air leakage in the '❑Complies Requirement will be met. 1 building thermal envelope are sealed, ❑Does Not [IN1]1 caulked, gasketed,weather stripped ENot Observable Location on plans/spec:A-1 or wrapped with moisture vapor- permeable wrapping material to :❑Not Applicable minimize air leakage. , Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier'3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 16 of 20 Detail Shop.cck Section . # Final Inspection Complies? Comments/Assumptions Si Req.ID II C303.3, Furnished O&M instructions for ❑Complies Requirement will be met. C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [FI17]3 representative. Not Observable ❑Not Applicable C303.3, Furnished O&M manuals for HVAC ❑Complies Requirement will be met. C408.2.5. systems within 90 days of system ❑Does Not 3 acceptance. [FIB]3 ❑Not Observable ❑Not Applicable C402.5 Building envelope contains a ❑Complies Requirement will be met. [FI55]1 continuous air barrier that has been DDoes Not tested and deemed to limit air leakage ❑Not Observable Location on plans/spec:A-1 <=0.40 cfm/ft2. ❑Not Applicable C402.5.6 Weatherseals installed on all loading ❑Complies Exception: Requirement does not apply. [FI37]1 dock cargo door openings and provide ❑Does Not direct contact along the top and sides of vehicles parked in the doorway. Not Observable ❑Not Applicable C403.2.2 HVAC systems and equipment ❑Complies Exception: Multiple units of the same type of equipment with [FI27]3 capacity does not exceed calculated ❑Does Not sequencing controls. loads. ONot Observable ❑Not Applicable C403.2.4. Heating and cooling to each zone is DComplies 1 controlled by a thermostat control. ❑Does Not [FI47]3 Minimum one humidity control device - per installed Not Observable humidification/dehumidification ❑Not Applicable system. C403.4.1. Thermostatic controls have a 5 °F ❑Complies Requirement will be met. 2 deadband. ❑Does Not [FI38]3 Location on plans/spec:A-1 ['Not Observable LiNot Applicable C403.2.4. Temperature controls have setpoint ❑Complies. Exception: Requirement does not apply. 1.3 overlap restrictions. Does Not [FI20]3 ❑Not Observable ❑Not Applicable C403.2.4. Each zone equipped with setback ❑Complies Exception: Requirement does not apply. 2 I controls using automatic time clock or ❑Does Not [FI39)3 programmable control system. :Not Observable ❑Not Applicable C403.2.4. :Automatic Controls:Setback to 55°F ❑Complies Requirement will be met. 2.1, i(heat)and 85°F(cool); 7-day clock, 2- ❑Does Not C403.2.4. ,hour occupant override, 10-hour ['Not Observable Location on plans/spec:A-1 2.2 backup [F140]3 ❑Not Applicable C403.2.4. Systems include optimum start ❑Complies 2.3 controls. ODoes Not [FI41]3 ❑Not Observable ❑Not Applicable C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans,demonstrating proposed watts Not Observable are less than or equal to allowed Observable,__, Applicable watts. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2)• 3 Low Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 17 of 20 Detail Shop.cck Section 1 # Final Inspection Complies? Comments/Assumptions & Req.ID C405.5.1 Exterior lighting power is consistent DComplies See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved ❑Does Not lighting plans, demonstrating proposed watts are less than or equal :Not Observable to allowed watts. ❑Not Applicable C406.4 Enhanced digital lighting controls ❑Complies Requirement will be met. [FI54]1 efficiency package: Interior lighting ❑Does Not has following enhanced lighting ❑Not Observable Location on plans/spec:A-1 controls in accordance with Section ENot Applicable C405.2.2: Luminaires capable ofpP continuous dimming and being addressed individually, <=8 luminaires controlled in combination in a daylight zone,digital control system for fixtures, "Sequence of Operations" documentation,and functional testing per Section C408. C408.1.1 Building operations and maintenance DComplies Requirement will be met. [FI57]1 documents will be provided to the ❑Does Not owner. Documents will cover manufacturers' information, DNot Observable specifications, programming DNot Applicable procedures and means of illustrating to owner how building,equipment and systems are intended to be installed, maintained, and operated. C408.2.1 Commissioning plan developed by DComplies Requirement will be met. [FI28]1 registered design professional or ❑Does Not approved agency. Location on plans/spec:A-1 ONot Observable DNot Applicable C408.2.3. HVAC equipment has been tested to DComplies Exception: Unitary or packaged HVAC eqiupment without 1 ensure proper operation. ❑Does Not supply air economizers. [FI31]1 ENot Observable DNot Applicable C408.2.3. HVAC control systems have been ❑Complies Requirement will be met. 2 tested to ensure proper operation, ElDoes Not [FI10]1 calibration and adjustment of controls. ❑Not Observable Location on plans/spec:A-1 DNot Applicable C408.2.4 Preliminary commissioning report DComplies Requirement will be met. [FI29]1 completed and certified by registered ❑Does Not design professional or approved ❑Not Observable Location on plans/spec:A-1 agency. DNot Applicable C408.2.5. ;Furnished HVAC as-built drawings DComplies Requirement will be met. 1 'submitted within 90 days of system ❑Does Not [FI7]3 acceptance. ENot Observable ENot Applicable C408.2.5. 'Furnished as-built drawings for DComplies Requirement will be met. 1 electric power systems within 90 days ❑Does Not [FI16]3 of system acceptance. ENot Observable ❑Not Applicable C408.2.5. An air and/or hydronic system DComplies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [FI43]1 systems. Location on plans/spec:A-1 ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\bix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey-Autobody& Page 18 of 20 Detail Shop.cck Section = # Final Inspection Complies? . Comments/Assumptions & Req.ID ;4 C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ❑Does Not [F130]1 receipt of certificate of occupancy. :Not Observable Location on plans/spec:A-1 ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI33]1 ensure proper calibration,adjustment, ❑Does Not programming,and operation. ENot Observable Location on plans/spec:A-1 ❑Not Applicable Additional Comments/Assumptions: ]. High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Drive Garvey • • Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop-2023\Const Dwg's\Drive Garvey=Autobody& Page 19 of 20 Detail Shop.cck Project Title: Drive Garvey Report date: 11/16/23 Data filename: Y:\Garvey\Dix Ave Hyundai\Body&Detail Shop=2023\Const Dwg's\Drive Garvey-Autobody& Page 20 of 20 Detail Shop.cck • s HAANEN ENGINEERING Job No 16 I) S Sheet No. I of CI Subject: R.I1 ft S4 a e .$ VYi'"ve_ Gcc.„vci -P1 J4r6Fv I,.GG By Date 11 k ¢v, 6.2 j 1-x,cl-ti unrea 1,.0 yx A tt 4 Loa t (Dri. : r Ge•s e.cl on N '/S 20 2P) J oo f D 1-60, 3 4 4 fe SF 2.) RoK"F p rsrurj ct,u ,e6a In FA' FILE COPY j r 3) Roar Seelyvi� C� .c 7i'1+1i 1,0(41 % E 0 eS F 4) (Z 4 L;ve Lep.4 : 20 ips P 5) 900C uw Loa A. ►• C Maviu sI•e (Z�'°�,J 645.. Jlaee) Q) C'cY N1 6'Vtiw �,a�( (�y : Eo r tJ• 7k* S i Jul Loan Pe G. 3. ' c'C . CE L4, • 4�c. Q) G Xpc))u u`c 1-01( Ce, 0 4) -Re- 1,A fitGfUY z 1 U EtV 4 440 #1, 1F t \. 0Xt.° x 36 -0. No.61241 s qO f.E3st0 �1, `'L 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 ImmiE HAANEN ENGINEERING Job No i 6 ! ! $`' Sheet No. 2- of (13 Subject: t Ka- 5 c-t 'Dr ye._ 6:oyteeil D!a -j'oy3 , LLG By " Date 11) 15123 3tJi +oP (.°A:,,ec I yct_t c ►1 La Ga CAA.A.410h a 10pe-61 poor J44,4 LoGLAs ig SO Aye 41 Rva@ Pa..Chne Gs a 1. 0 • Sid pP 41 Rd 0 cyp i•..i L" * 1. 0 roc a 6,3( 1-1C nca 'fit 56 �°i vvto„a �..dct . 35 P5P 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 Ilimmar HAANEN ENGINEERING Job No B Sheet No. 3 of V5 Subject: ?kit f5S(lc ict-i-e4 (o'Ve-ut 'has h' a •4c By FtS Date kk (gout_ CAL ca�-►bhS c ) Wi crud Ca-C S Pe.le,-irYni\-1t laS Pi 0e Bu.0 - I) The b‘4. c}0 t3 h o P classi`f%ied a.s Cnclostzt 4- open buILdi . 4-he. bui 1 L pa iiatt enclose4 b,AA s 0 r 'pucHeal j opera bui .1t1 , A0 L op O ern\j I Q Wc�,, d- recc• r0 ri l; s tv—e. . V 5 4 S o wkh s ike tgac,U- Po = 4S-6 0-Z 614.c-ck Aoi LI g4 F.1"2 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 • HAANEN ENGINEERING Job No ltS- Sheet No. 4 of to Subject: (-HA- Pt5 oc c D-r ve C CAY�le j Ss kyslb ri, LLc By �` Date 1I115123 d (J t-OP►j US i C►A.t p)-ei 2- ; Pwr4- *1 (if Lac, DLS19h rPulu.rnc1-er� ¶30.sic w ►,a Sp-Ge.c.1 (\I) = 1 to w,\ (� C _11) 412-) WIvl d ;.-e_c?10tiaii - Pu_ct-by (1(4) 2 Q . C(- 3) x posu e. C4-1-em —5 6.x pc.)Sure. C. LI) To po -r,tph�c fo-44y (V_..117). f I y� 6) 6 ro\ d akv tiv, Fcke►vy (k_t) a 1 .0 Cci.A.S Fe - F Y Cc,) = 0 . K- 7 6.1 c(tl s L.1re.. cicx-s R Cc..h tlY1 ea ii-{cab by[Yt 'At-Irmo-1 ,'Pre--3Vre. Co•e(-Pk-c‘-cv-►` CCzCp;) i a, IV (1)•!‘ . Vc.A d c t3 r -s"u,-e_ us k �,� pri t e- 04.2) a. Q err .2S p lencf AoF he,-)j.4 254 Bay Rd - Queensbury, NY 12804- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job No 14, Sheet No. 5 of Vb Subject: fZk 4 pcs 36 afx , iv@. 6cUYve`i I i01-` L1rS v J By µSS Date it l 1512-3 1.,nc.A A. Cal)tcLacA.Aoliks 9. z 2 0. 00 _ 2 Its ka. ke C()gel 0- 00 .A-4 x ()Ail x i•o x ® . x ,.o x C►o3 )2 24, pe tj 25 Psf. r Ls-pse [ lS. X ?) + (e. g5) xc0•t )J 21 ivs p W�N� wa.. giat, rLW ^. ps6 O s (WU to, 10j eiP 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 I...IE HAANEN ENGINEERING Job No Sheet No. 6 of lC.•) Subject: P-I•f c- A S 4 ei -- ,10'rive k rk s. 'rw--1-0-6.G-A, By ("1J Date t 115-123 Ltk c.k rt.) N—3 Sl,e_c r ,/ _ 2 I ff aF C20 F+ x 96P4J } tS-()sP (2.oP4--x `l6 pr) ba-)e NS (so) 6 9. Z. k:ps \itIck pis, Cft SO 6dou10..}-{ er7-W IN, 1n4 ton e S"FseaY = (2i "pSF) C20P4- x s �� F5D) r V 4- kXoC 12,4_3c A3D ola 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 Fma HAANEN ENGINEERING Job No 1E II Sheet No. 7 of \ Subject: R-14 A- A 4,soc�e.► tVe Cie ba er. f,.Lc. By �'s Date It I S-113 Lu u g ,L) 5'ei S yin i c VC-5 5"1 F 744wmeleds SS .2- 3 • sms - 6 . 37--► o . 2.c 5 , = ® 6 $ Cm 2 6 .16 'z , C4,1 0, 101 3) CGeue(Pncy Cake..Esreld — I� 4 ) S&rS VPam'lcj i C uYLJ - 13. �J ge.5 Mph o a E ;u i v"jc P,:-ce cne-Vno a. 254 Bay Rd - Queensbury,NY 128Q4- Phone:518-793-7444- Fax:518-793-7061 HAANEN ENGINEERING Job NoC1 5 Sheet No. of Subject: I-f/ A-S °i-ej ivy �C tY/C1 'pt, ;bona , Luc By NS h Date \\\kS1 23 to 4 n .b c, .o.41^Jv'r Sei S w, '2 LA.ye. $eeQY (.\ = CS CS S'p c,i1fv 3 •co Ice s Oz- -:.d• rn.wv,64- Freto.c. T-= \. L' O 2S" o, 0 � ?,® f I-oj �'ec-k1 ye. 5eC. "ic., t )t t ` (3. 4 i' is . t(m) psp g C3 s G1- ,C q.6 Pfj -!- 0.2- X 3 5osi' X()c s cf 6' P 1- 16k-�k 54• G k V 4c► ill ,c v21ir,9 k Witt lc wlV\CI LoU Uo'ferflS 4 . -4440-$44 c e-siyl� 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 F•en HAANEN ENGINEERING Job No \ VI C Sheet No. of 16 Subject: P.HA, Av. (fir t toyvseO.,{ LLe, By Date 11 IS 113 fauili g 1'v9 t. \Ie-(44 c.A4 Lc.1 & C SAEe� ca� Fr,6 gk; es cisc 2 it.-5 Pt-rem eyta yr deot -3 3 P+ s 3 el. F� 7 5 P4-2" ale-ee j 6 rAwl-. H Cal Ato tcv 1- ' 2-5 3 '4-14, 2s F�2 f� 's �t2 Amu A ided �. r(1- X4-�F3- ¢.o - 7 rt e ri c e1 &Ic LL 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 HEHAANEN ENGINEERING Job No 16 <IS- Sheet No. \o of \ Subject: R-H k A3S (Dri\tr ko y �-aJ By Date U.•n J c.�,�vT fie_Sc -rN 254 Bay Rd - Queensbury,NY 12804- Phone:518-793-7444- Fax:518-793-7061 WALL LINEf PANEL SCHEDULE ja.� Leo r't'fw tar.Moil lur BST(w M'Ph.Nr tw rv.sr. I FLU,WAL4 r-o" n'o' rye t1f7Uf1 t i r1�41- o'-o' °Ler- r uy revert n a Fuu,Witl. a'-o' o--a ?u Flaevent event( 1 FLat.WU. I Q`-Yrr 0 Q' F7� t 1 M Q (7) 0 (-7 Qi (7 STEEL UNE t sa'-0" STEEL LINE a 1 r-0' , 16'--0' 7 16'-o" Ter-0- 18'-0• 16'-0" 11 W -A •I V- 4'x4' 4'x4' 10'00' 10'x10' 10'x10' 10'x10' " I SSW E.H. - 17'-0' I I 1 I In N I k r o SHOP X X 1 n a olio '� l� p O F - I: `�J 14 O ir Cif z ^1 U • i i W i l' 5 1 ^ m o 11 FSW E.H. +2 1X-10 1/2' I /) 3 " \�M1JI W ►\n. r 6 1 c I 16'-0' o T6'-0° 16'-0' 18'-0' 18'--0' 16'-0' 0 - ' STEEL LINE , es'-e" d ST L LINE t L OOcc 6 g k IVsa :olumn locations marked with "+' are designated 09 Meet Economical (Pipe, Tube, or 1-Shape) and will be determined at final design. E 1 . ill. II . . . . . . 4 „1 , . .rN . . . .I. aoran000 N m 4 ill 111111111111111111" 111111111111111111 ‹ 111 NM . — Nr 11 411111Ie 111111111111111 0 a a , EN 1 . . . . i r . i ‘,-.-:_. g 2 - 0 e R 1 a,. • ._.. 0 . 0 0 I z g I u , • Li ai Fs 1 g g 4 n 1.---------! . .:, _ 0 _ .. - 11 g g 1 8 ng - t0 g, E 15Q3355 '",5553Rin § 2 3- g 9 551 . 5331:35 i., . ii,ii § gig 81-,...,._8, 8sesesage88Bessse8. satOssag.._ B . .._. . i .._. •11 , , 1 . . . . . . . . . . .„ . . . . . . . . . . . . . . . . . . . . . . d. .., •___11 J , , f• 1 ' l' :a N .. wAttmmmmWas mvvmmft Iv / Till / 1 .; 1 .7 .7 .y .:: : al Li A Asi ; 000000 000000 0041,000 000000 000000 000000 ' 1 -.----- a 2 0 . . 1 • i. I i .. ..._ . ._ - __.; _... . • • • N . 0 g i0_A E c 1 1 0 isa 8 1 a § W 1 11 us 8 S g g :i 1 i 111111111111828i88le8ele8811 / 1111118l888828 Kirby Building Systems Jabal Page 3 Frame:2 By: Date 11/10/2023 Building:Shop Job Name Garvey Body Shop Control E P202311100928 *** Design Summary-Frome Reactions by Load Case *t i Membsr Xallps Yt4tq 2(Ups M®bor - X WED Yt8F4 Z0ips LOAD CASE 1-DEAD LOAD CASE 8•WDiD CASE 2 TO LEFT COLO1 1 2 0 'COW1 a .4 D COW! 0 4 0 C0102 0 -10 0 COIA3 -1 2 0 COL03 3 .4 0 LOAD CASE 2-COISATFIIAL LOAD CASE 0•LONG,WIND 1 TO*A®C COLDO 1 4 0 IC01o1 -1 -S 0 00102 0 7 0 C0102 0 -9 0 COLO3 -1 3 0 COW03 1 -3 0 WHO.CASE 3-ROOF LIVE ¶LOAD CASs 10 WHO.wrn0,1 TO FrQ NT COLD1 3 10 O C0LD1 -1 -2 0 COLD2 0 21 0 COt Z I , - 0 -e 0 Co103 -3 3 0 1 COLTS -1 -2 0 LOAD CASE 4-SNOW • ;'war)CASE 11-LONG-WINO STO HAY 11 COLCM 3 12, '0 •i COLDI -1 -7 0 COL02 0 4 25, `-' 0 COL02 0 -1s 0 00103 -3 9 0 COL07 1 -6 0 LOAD CASE 5•WIND CASE 1 TO New LOAD CASE 12-LONG.WIND 2 TO FIlONT CONN -4 j -S 0 COLD1 -1 -S 0 COLO2 0 -H 0 CCWZ O -10 COL03 1 -3 9 COL03 1 -4 0 LOAD CASE••WIND CASE 1 TO LEFT 1 LOAD CASE 13-SESMIC TO RIENT COLOI 2 -1 1 0 CDY.O1 -2 -1 0 COL02 0 -4 0 COL02 0 1 0 COLIN a -2 0 COLO4 -1 1 0 LOAD CASE 7-WIND CASE 2TOMART LOAD CASE 14-SEINAIC TO LEFT COL01 -4 -8 0 00101 2 1 0 C0L02 0 -15 0 COL02 0 -1 a I 1 -5 0 COLDS 1 -1 --00 Kirby BuddingSystems Job 8: , Page:4 Fnnic 3,4,54 By Da t 11/10/2023 iluildincp Shop Job Name:Garvey Body Shop Canby!it P202311100928 Design Summary-Frame Reactions by Load Case *** 1; , 1 . :r 1 , , . , _,. . . Mombar X Mrs Y Odpe Z Caps blornber X(Idps Y(kips a 044-....---,LOAD CASE 1-DEAD LOAD CASE Li-VAPID CASE 210 LEST MIN COL01 1 2 0 OOLO1 2 .4 0 C0102 11 4 0 CoL02 0 -10 0 COLDS -1 2 0 COLDS • 3 4 0 LOAD CASE 2-COLLATERAL LOAD CASE 9-WHS.WIND 110 ISAOL COW' 1 4 0 towl -1 3 0 COWS 0 0 0 cOW2 0 -9 0 COM -1 3 0 COWL -3 0 WAD CASE A•ROOT Mt WAD cA5E 10•Lour,.WINO1 , catourS 1---‘--•--- EE WW1 I 11 0 COLD1 -1 -2 0 COWS 0 22 0 WW2 , ,,f.,--1., 0 -4 0 COLDS ' -3 7 0 c)ap,,, , • -1 -2 0 LOAD CASE 4-SNOW 1.0 4D CASE 11-L0NR.E.fitiD 2 TO RACK COLO' 3 --12-r• .,\0 . all" 4 4 0 COLDS 0 I,251 --• D COLDS 0 .15 0 C0103 -3 '0 0 COLDS 1 4 0 LOAD CASE 5-WINO CASE 17D RIGHT LOAD CASE 12-L0146.INDIO 2T0 FRONT COLO( 4 -S 0 coma 4 4 0 COLO 0 -9 0 COLDS 0 -10 0 CO103 -1 .3 0 COLDS 1 -3 0 LOAD CASE 6•WIND CASE 1 TO LEFT LOAD CASE 13-SEISMIC TO RIGHT COLO1 2 -1 0 COLOI -2 -1 0 COLO2 0 -4 0 COLDS 0 1 0 COWS 2 -2 . 0 COLDS 4 1 0 WAD CASE 7-WINO CASE 2 TO MOLT LOAD CASE 14-SEISMIC TO DDT COLO1 -4 -$ 0 COW1 2 1 0 COWS . 0 -10 0 COWS -1 00103 1 4 0 COWL 4 0 AIM _.. Vssimiggsleageag 8 eviasaB581, 81m 51 , gEEEEsm glaybEFIIIEltsREEE § Ggks nm aso ... uwl ill ! na F g • ... E I 1 0 g GT-0 , ---. _a g 4Z al . "111 • . . 3 a H . d F . . , I i . , xi r •A' it. . . . . . . . . . . . . . . . . 00000 cia = 00 00000 fl 1:t1 S. i VP . ! . e R • ..__ .., , ; ,.., — .. . .. . . . . . f, • it • ,___ m I r ---. . . . .. . . . . . . . . . . OOOq. . . . . 0 ..:.:- . . . , .% HIlisillEilIMM11111111111111112fr ,. 1 g S 5:---- 1 1 : :!•...._, o , . ra I- •-=;:------ _ _,,,,T ,-...., . 2 • 11 .1-.. 1 I I •I .-%- g a .... 1 I .-: 1 . i . . : • WlY• . U i • • • • • - :--'. . . . . . 00000 00000 moo ° oboe wool' s, V, 1 ! Fl -a LA ...a ..... • -•1. 110 1 . + . o 446,44 44 /. 4io 4 $. 11. 4k 4 ,146 ,14. fl 1 W 1 — _— m,moo coamo miqmm * 4164. 4 :. mmoom mommo f' 124 Irby Drive Date: 11/10/2023 • F;,tea. Portland,TN 37148 in Bulf6ing All Sy?-r=A`i1,Ira Ph: (615)325-4165 w-•—' ar°-:-> -W,r �c (800)231-3460 GENERAL INFORMATION FOR COLUMN BASE REACTIONS PRELIMINARY QNLY NOT FOR CONSTRUCTION Project Names Garvey Body Shop Quote Number. Customer. Hilltop Construction Control Number: P202311100928 Pricing Ver. 2023.11.7.1 Column base reactions are included in this packet for a building estimated by the Seller.These reactions result from frame analysis done for this specific job.They reflect all loading to which the building may be subject,per the appropriate building code and loading information provided to the Seller at the time of the quote. Preliminary reactions are subject to change and are usually provided at the request of the customer.Some items are excluded from this report.These include,but are not limited to,Roof Framed Openings,Point Loads, Mezzanines,and Cranes. Reactions are provided by load case in order to aid the foundation engineer in determining the appropriate load factors and combinations to be used with either Working Stress or Ultimate Strength design methods.Wind load cases are given for each primary wind direction.For ASCE7-10 based building codesand beyond based building codes,the unfactored load case reactions due to wind are generated using the ultimate design wind speed(Vult). Sign conventions for computer generated frame reactions are as follows and should be taken in the sense of the frame sketch given on the reactions sheets. GLOBAL X. GLOBAL V GLOBAL Z ( +to right) (+upward) ( +counter-clockwise) , . Kirby Building Systems Job : Fagg:6 Frame:Walt A Portal Frame,FL F.L 2-3 By Data 11/10/2023 Building:Shop Job Name Caney Body Shop Control et P202311100928 IP" Design Summary-Frame Reactions by Load Case *** 0 F 1 I tp I I I— _j y COLO 7 CO LO2 7 ---7—> :'''' •.;. 18'-0- Manbar X Mpg Y Win 2 Odps Member IL 03pg Y Nilp, Z D _ips WAD CASE 1-DEAD LOAD CASES.WIND TO FRONT COLSI -1 2 0 COLD1 4 -2 0 COLO2 -1 2 0 WIDE -1 -2 0 lam CASE 2-wpm 10 azsia LOAD CASE 6-SEISMIC TO RIGHT C0101 -7 4 0 COLO .5 .6 0 COLO? 1 I 0 COLO2 -1 6 0 LOAD CAW S-WIND TO LETT LOAD CASE 7-SEISMIC 70 LEFT COLD1 1 6 0 CONN . 1 6 0 COLD2 7 -a 0 COUTZ 5 -5 0 WAD CASE 4-WIND TO ELAM COLO1 1 -3 0 COLQ2 1 -3 0 ' ,• r ,,,) I .--, I ''---'' .J' V •• -. 1...' '., 1 • Nucor Buildings Group JOB NAME Gawey Body Shop JOB NUMBER BUBDWG: Shop ENGINEER LONGITUDINAL X-BRACING REACTIONS (These reactions must be combined with the appropriate Longitudinal frame reactions) Line: Bay: H(kips V(hips Casa F.L2-3 9 8 WIND F.L 2-3 5 5 SEISMIC V V. *Horizontal bracing reactions are orthogonal to horizontal frame reactions. MTI Sustainable Solutions for Efficient Environments 4 Chelsea Place Suite 102—Clifton Park,NY 12065 Phone:518-450-7292 Fax:518-450-7295 Design Review-Commissioning-Fire Life Safety-Test&Balance-ASHRAE 110-Drone Sales/Inspections December 12,2023 Dan Washburn �t�� Vice President COPY Hilltop Construction Re: Garvey Hyundai Body Shop 257 Dix Ave—Queensbury, NY HVAC Air Balancing Dan, Mechanical Testing Inc.has agreed to perform the HVAC air balancing for the new Body Shop project at Garvey Hyundai in Queensbury, NY. The air balancing will include the new HVAC systems being installed. Once our field work is completed,we will submit a certified typed report for engineer/town review. Feel free to reach out with any questions. Glad to help. Regards, Ken McThenia Chief Estimator W MEN aC OWNED N AABC UT: ) cmncIsoev��.,,. IQ/QBC41113: Commissioning- Group TE.,,TERM . „� HAANEN ENGINEERING , LLP December 12, 2023 Town of Queensbury 742 Bay Road Queensbury, NY 12804 Attn: Mr. John O'Brien; Director of Building and Code Enforcement Re: Garvey Hyundai Body Shop HE Project No. 16115 Gentlemen: The Town of Queensbury has requested a letter stating that Haanen Engineering will complete the structural steel inspection for the Garvey Hyundai Body Shop to be constructed on Dix Avenue in Queensbury. In response, Haanen Engineering will complete the required inspections during and at completion of the pre-engineered building erection. A brief letter report will be provided with the results of the inspections. If questions arise with the above information, please contact me at (518) 793-7444 extension 19. Very truly yours, HAANEN ENGINEERING, LLP - - FILE COPY Daniel A. De Nero, P. E. Principal 254 Bay Road,Queensbury, NY 12804 Tel: 518-793-7444 Fax: 518-793-7061 Email: hjh@hjhllc.com CONSTRUCTION TECHNOLOGY INSPECTION & TESTING DIVISION, P.D.&T.S., INC. FILE COPY 4 William Street,Ballston Lake,New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com December 7, 2023 HILLTOP CONSTRUCTION COMPANY 21 Casey Road Queensbury,New York 12804 Att'n: Building Code Enforcement Officials Re: GARVEY DISTRIBUTION: 257 DIX AVENUE, QUEENSBURY,NEW YORK Construction Materials Inspection and Testing Services Greetings, Per the request, Mr.Dan Washburn,HILLTOP CONSTRUCTION COMPANY, we are pleased to inform you CONSTRUCTION TECHNOLOGY has been retained to provide the construction materials inspection and testing services required of the referenced project including but not limited to:Soil compaction, structural steel, and portland cement concrete inspection and testing. As such, we would like a moment to introduce our organization. . CONSTRUCTION TECHNOLOGY is the construction materials inspection division of Product Development&Technical Services, Inc. Since our 1984 incorporation in New York State,we have been devoted to providing the highest standards of on time field inspection, testing and laboratory support to the construction industry. Our desire is a QC/QA involvement with projects committed to timely completion while satisfying the quality controls and assurances necessary to support today's strict design criteria. All too often materials inspections are viewed as a necessary evil or a requirement to be overlooked.Many times the laboratory brings this attitude on itself because of less than fully qualified personnel, tardy response time or uncompromising attitudes of technicians. Given the opportunity, we are confident we can provide the services that reflect our strong desire to be an asset to the construction process. Our facility and field technical force is supported by state of the art test equipment,including nuclear soil/asphalt density test equipment, automatic soil moisture/density(Proctor) apparatus, temperature/humidity controlled curing environments for concrete specimens, and all other necessary equipment to satisfy the requirements of the American Society for Testing and Materials (ASTM) standards C-1077 and E-329 as they relate to a,commercial inspection agency. CONSTRUCTION TECHNOLOGY has submitted to outside auditing by having our personnel, equipment,facility and quality assurance plan evaluated by the Cement and Concrete Reference Laboratory (CCRL) of the National Standards Institute. A copy of the CCRL/NSI audit and finding is available upon request. December 7, 2023 HILLTOP CONSTRUCTION COMPANY Re: GARVEY DISTRIBUTION:257 DIX AVENUE,QUEENSBURY,NEW YORK Construction Materials Inspection and Testing Services Our staff ranges from consultant Professional Engineers,hydrologists and geologists to field technicians and materials inspectors with technical backgrounds of educational degrees and/or substantiated experience in a construction oriented discipline.Field inspectors also possess a combination of the following certifications: * Certification at various levels (AET-I through SET-IV)by the National Institute for Certification in the Engineering Technologies (NICET). *American Concrete Institute(ACI) Grade I Concrete Inspector. * American Concrete Institute(ACI)Certified Concrete Construction Special Inspector. *North East Transportation Training &Certification Program(NETTCP). Certified Soil and Aggregate Inspector *Troxler Nuclear Gauge Training Program for Radiation Safety Officers and Field Operators. *NYSDoT Certified Asphalt Density Inspector. *J&L Testing,Inc. Certification Program for Sanitary Landfill Inspectors. *J&L Testing,Inc. Certification Program for Quality Control and Inspection of Geosynthetic Systems for Use in Solid and Hazardous Waste Disposal Facilities. In addition to particular qualifications,field inspectors are familiar with all phases of construction materials testing and inspection including soils, concrete,reinforcement, masonry, structural steel,fireproofing and roof installation. This generally alleviates the need and expense of employing more than one inspector on a particular project. CONSTRUCTION TECHNOLOGY currently has the capabilities to provide inspection and testing services relating to many construction concerns including but not limited to: subsurface drilling and investigation, soils placement and compaction,foundation design recommendations,portland cement concrete,unit masonry, mortars, grouts,bituminous concrete, structural steel and fireproofing, as well as all associated laboratory services. In general, all forms of materials testing and inspection services,as they relate to the construction industry,may be obtained through CONSTRUCTION TECHNOLOGY. We appreciate your interest in our firm and our line of work. We look forward to completing the construction materials inspection, testing and laboratory requirements for: HILLTOP CONSTRUCTION COMPANY. If there are any questions,or when we may be of assistance,please contact this office immediately. Respectfully, CONSTRUCTION TECHNOLOGY Robert Behan, (NICET) Manager Technical Services Oil Water Separator High Oil Level Alarm Model# S/OWS/HOLS/30X Installation and FILE Copy Operator's Manual Panel and Component Installation: R 1. Caution:To maintain the NEMA 4X rating, make A WARNING all wiring connections with seal tight cable grips 1.All installations must be in accordance with the National Electrical or conduit connections. Code,and any other applicable state and local electrical 2. Determine mounting location for control panel. requirements. Mount panel using mounting feet supplied. 3. The control panel should not be mounted in an area that is subject to submersion. 4. Run cables through conduit(if applicable). Make S/OWS/ROCS/30X High Oil Level Alarm ield connections as shown on wiring diagram. 5. Branch circuit protection to be provided by end- user. The S/OWS/HOLS/30X control panel will alert of an 6. Mount components at appropriate levels(See Oil Present Condition and Low Level Condition in an notes on drawing S/OWS/HOLS/30X). 7. The oil present sensor shall be positioned Oil Separator Tank. anywhere that the oil alarm level is desired.The low level boat shall be mounted below the oil Features: present sensor. • Oil Present Sensor, Low Level Float with 30'cords and mounting hardware. Optional length available up to 100'. Start up: • Indoor/Outdoor NEMA 4X Heavy Duty Polycarbonate Enclosure: 8"x8"x4", Color Gray Material 94V-2, 1. When the power is applied, the green power Polycarbonate, IP-56 Rating, NEMA 4X light located on the white front swing panel shall • Voltage: 120 VAC, Sinlge Phase, 60Hz light. • Control Panel is UL Listed for the United States and Canada To test the alarm circuit, push the test button on the • External Mounting Feet: Quick Installation. side of enclosure, the audible alarm shall sound and • Oil Alarm with Test and Silence Features, Red Beacon the high red beacon will light. Alarm Light • Alarm Horn Sounds at 85 Decibels at 10' Service: • Low Level Indicator • Power On Indicator Caution:Before checking electrical connections • Dry Contacts for Oil Alarm within the control or attempting to replace any • Easy Accessible Terminal Block components, turn off all branch circuits supplying • 10' Power Cord power to the main control panel. Verify Correct Operation of Control Panel After Installation is Complete www.skimoil.com _ contact@skimoil.comr-' l; �' ` (314) 579-9755 �. i 103 W.Weaver Street .. 1 , Carrboro,NC 27510 Protecting the Environment since 1995. h R ' BACK PI ATF OIL PRESENT LIGHT O POWER LIGHT 5' LOW LEVEL LIGHT : OIL BUZZERNT CI A Ci [-•-8.4'—w TEST 11 CON-1 O O P 5.2' 0 \SILENSE —� A '- lig A — — — 0 0 D 1 - -- I D 8.4' I I 11.2' __ _11 to •■ ro la �Il��ICAMIE LD U R G V l PH N IrCOM OIL u'u III [SENSORT][V RED][cGNTAcr] LOW Ph N GP PRESENT SENSOR [FLOAT,[lAC V1.5' FOR IRE RRIP 120VAC Component Installation Details_ DRY CONTACT L: i ACCESS 30' J 3 3.7• NOTES The'oil sensor is to '� • be mounted above the low 1 9:21.11....._ level Float. Minimum 1/2'. OIL PRESENT maximum I' distance. The low SENSOR level Float shuts down the oil alarm circuit. I IlW I EVEI El OAT LOW LEVEL 110 1 I —712'4ts-- ■ FLOAT N Minimum 1/2' ■ Maximum 1' 1.5' 3' c srowsntoLsraox 99,..._g vKl�o f'r Oil Water Separator High 011 Level Alarm �y�,ll�' u,e • pmw my • • FormJ1 upo1101 , FILE COPY Manual J8 Load Calculation Project#:12/14/23-1 December 14,2023 Project Information , Project#: 12/14/23-1 Notes: Name: Garve Hyundai Location: 257 Dix Ave,Town of Queensbury,Warren County,NY Form J1 (Summer) 1 Name of Room Gene Hyundai Entire House ' 2 Running Feet of Exposed Wall 341 3 Ceiling Height(Ft)and Gross Wall Area(Soft) 15.0 5,118 4 Room Dimensions(Ft)and Floor Plan Area(SgFt) 7.1.84 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) • 7,1.84 HMI 8tuh 1 Type of Exposure Construction(lumber Panel Faces Area or Length Htg. Clg. Heating SLIg. L-Clg. Windows and Glass 8a Doors a 8b Skylights a 7 Wood and Metal Doors a 11J 44.40 12.80 884 39,250 11,138 8 Above Grade Walls and a 12F-0sv 4.81 0.67 4,234 20.383 2,834 Partitions 9 Below Grade Walls a 10 Ceilings a 18A-38md 1.92 1.69 7,184 13.783 12,108 11 Floors a 22B-lop 28.27 341(P) 8.982 Heating Load uh) 0.280 40,397 1 (Bt 12 Infiltration Sensible Load(Ruh) Effect ACH WAR 1.0 2,924 0.150 Latent Load(Btuh) 4.949 a Occupants at 230 and 200 Stub 10 2,300 2.000 b Scenario!lumber Del 1,200 13 Internal c Default Adjustments . . d Custom Appliances e Plants • Other User specified additional loads 14 _Subtotals Sum lines 6 through 13 122,755 32,504 8,949 EH LF&E SGF 15 Duct Loads ELG 18 Ventilation Loads I Vent Cfm I 358 E Cfm 358 14,427 1,950 8.599 17 Winter Humidification Load GalfDay 18 Piping Load 19 Blower Heat 1,708 20 AED Excursion 21 Total Load I Sum lines 13 through 19 137,182 36.159 13,548 All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 1 of 2 Project#:12/14/23-1 Form J1 Name:Garve Hyundai December 14,2023 • Disclaimers With the permission of the Air Conditioning Contractors of America("ACCA"),material is reproduced from Manual J Residential Load Calculation(8th Edition)which is copyrighted by ACCA.The program and data are provided"as is"without warranty of any kind either expressed or implied.The entire risk as the quality and performance of the program and data is with you.In no event will ACCA be liable to you for any damages,including without limitation any lost profits,lost savings,or other incidental or consequential damages arising out of the use or inability to use this program or the data.©2015 Air Conditioning Contractors of America.All Rights Reserved.www.acca.org ACCA,Manual J and Powered by ACCA Manual J are registered trademarks of the Air Conditioning Contractors of America.All rights reserved. Cold weather humidification,or some lifestyles that produce excessive moisture,may cause condensation to occur if the absolute humidity of the indoor air is too high for the momentary circumstances.Condensation can occur on surfaces or concealed within the structure,and can lead to mold,mildew,frost damage,and moisture damage.The software does not perform calculations for the estimation or detection of possible condensation problems,and it is the designers(i.e.software users)responsibility to do so independently if required.For guidance and additional cautions refer to ACCA Manual J 8th Edition,including Section 1-11 and Section 27. The calculated values shown in this report are based on the data input by the user of the software.Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully,and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC.("AVENIR")OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT,NEGLIGENCE,STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL,INCIDENTAL,INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER(INCLUDING,BUT NOT LIMITED TO,DAMAGES FOR LOSS OF BUSINESS PROFITS,BUSINESS INTERRUPTION,LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE),EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT,AND REGARDLESS OF THE FORM OF THE ACTION,SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 2 of 2 Load Summary UP Onor Manual J8 Load Calculation Project#:12/14/23-1 December 14,2023 Project Information Project#: 12/14/23-1 Notes: Name: Garve Hyundai Location: 257 Dix Ave,Town of Queensbury,Warren County,NY Outdoor Conditions Indoor Conditions Floorplan/Levels Location: Glens Falls AP,New York Heating Cooling Ground Floor 7,164 ft2 Elevation: 335' Room Temp: 70°F 75°F Latitude: 43 Design Temp Diff: 74.0°F 10.0°F Total Heated Area: 7,164 ft2 Heating Cooling Humidity: 35 50 Total Cooled Area: 7,164 ft2 Dry Bulb: -4.0°F 85.0°F Moisture Diff(Grains): 27.4 Daily Range: Medium Ventilation Wet Bulb: 71.0°F Num Occupants: 10 Infiltration Heating Cooling Method: Simple Type: Heat Recovery Type: Heat Recovery Stories: 1 ACH: 0.20 ACH: 0.20 Construction: Average Outside Air. 358 cfm Outside Air: 358 cfm Exposure Category: Three or Four Exposures Sensible Eff: 50% Sensible Eff: 50 Num Fireplaces: None Net Air Changes(H/C): 0.28/0.15 Net Flow(H/C): 501 cfm/269 cfm Total Heating:137,182 Btu/hr Heating Load Breakdown Sensible Load Breakdown Total Sensible:36,159 Btu/hr Total Latent:13,548 Btu/hr walls Doors • Load Breakdown woos Doors Name Heating Sensible Latent Windows° 0 0Ceilings , .. Skylights* 0 0 Blower Heat • Doors 39,250 11,138 - Ventilafion Ceilings ' r Floors / �Walls 20,363 2,834 ' Intemal Below Grade Walls 0 . entilation Ceilings 13,783 12,106 Infittra.n n ,ation Floors 8,962 0 Infiltration 40,397 2,924 4,949 Fenestration Load vs Hour of Day-Block Load(Summer) Intemal 3,500 2,000 Other 0 Duct Loads 0 0 0 Ventilation 14,427 1,950 6,599 Humidification 0 Legend Piping Load 0 w ® Load Line Radiant Back Loss 0 m Blower Heat 1,706 - Average AED* 0 - 30 Percent Total 137,182 36,159 13,548 0 t Total Area 7,164 ft2 7,164 ft2 8 9 10 11 12 13 14 15 16 17 18 19 20 *Average Load Procedure Hour of Day Heating AT':70.0 JSHR:0.73 Cooling AT':22.0 MJB Tons:4.14 Average Load:0 Btu/hr Peak Load:0 Btu/hr Est.Heating CFM2:1611 SqFt/Ton:1729 Excursion Limit:0 Btu/hr AED Load:0 Btu/hr Est.Cooling CFM2:1357 CFM/SqFt:0.19 (1)AT:Difference between supply air and return air (2)Estimated air flow based on specified supply air AT Length=ft Area=ft2 Temperature=°F Flowrate=USGPM Air Flow=cfm Heat Loss=Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Unit Heat Loss=Btu/(hr•ft2) Rv=hr•ft2•°F/btu Head Loss=ft water RH=Radiant Floor Heating Software Version:23.0.0294 R BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmelt N=Not Heated See sections at end of report for important Notes,Assumptions and Disclaimers. Page 1 of 2 Project#: 12/14/23-1 Load Summary Name:Garve Hyundai December 14,2023 Disclaimers With the permission of the Air Conditioning Contractors of America("ACCA"),material is reproduced from Manual J Residential Load Calculation(8th Edition)which is copyrighted by ACCA.The program and data are provided"as is"without warranty of any kind either expressed or implied.The entire risk as the quality and performance of the program and data is with you.In no event will ACCA be liable to you for any damages,including without limitation any lost profits,lost savings,or other incidental or consequential damages arising out of the use or inability to use this program or the data.©2015 Air Conditioning Contractors of America.All Rights Reserved.www.acca.org ACCA,Manual J and Powered by ACCA Manual J are registered trademarks of the Air Conditioning Contractors of America.All rights reserved. Cold weather humidification,or some lifestyles that produce excessive moisture,may cause condensation to occur if the absolute humidity of the indoor air is too high for the momentary circumstances.Condensation can occur on surfaces or concealed within the structure,and can lead to mold,mildew,frost damage,and moisture damage.The software does not perform calculations for the estimation or detection of possible condensation problems,and it is the designers(i.e.software users)responsibility to do so independently if required.For guidance and additional cautions refer to ACCA Manual J 8th Edition,including Section 1-11 and Section 27. The calculated values shown in this report are based on the data input by the user of the software.Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully,and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC.("AVENIR")OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT,NEGLIGENCE,STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL,INCIDENTAL,INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER(INCLUDING,BUT NOT LIMITED TO,DAMAGES FOR LOSS OF BUSINESS PROFITS,BUSINESS INTERRUPTION,LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE),EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT,AND REGARDLESS OF THE FORM OF THE ACTION,SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. (1)AT:Difference between supply air and return air (2)Estimated air flow based on specified supply air AT Length=ft Area=ft' Temperature=°F Flowrate=USGPM Air Flow=cfm Heat Loss=Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Unit Heat Loss=Btu/(hr•ft') Rv=heft'•°F/btu Head Loss=ft water RH=Radiant Floor Heating Software Version:23.0.0294 R BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmelt N=Not Heated See sections at end of report for important Notes,Assumptions and Disclaimers. Page 2 of 2 Load Report LJO11O1 Manual J8 Load Calculation Project#:12/14/23-1 December 14,2023 Project Information Project#: 12/14/23-1 Notes: Name: Game Hyundai Location: 257 Dix Ave,Town of Queensbury,Warren County,NY Manual J Load Summary Total Heating:137,182 Btu/hr Total Sensible:36,159 Btu/hr Total Latent:13,548 Btu/hr Outdoor Conditions Indoor Conditions Location: Glens Falls AP,New York Heating Cooling Elevation: 335' Room Temp: 70°F 75°F Latitude: 43 Design Temp Diff: 74.0°F 10.0°F Heating Cooling Humidity: 35 50 Dry Bulb: -4.0°F 85.0°F Moisture Diff(Grains): 27.4 Daily Range: Medium Wet Bulb: 71.0°F Infiltration Ventilation Method: Simple Num Occupants: 10 Stories: 1 Heating Cooling Construction: Average Type: Heat Recovery Type: Heat Recovery Exposure Category: Three or Four Exposures ACH: 0.20 ACH: 0.20 Num Fireplaces: None Outside Air: 358 cfm Outside Air. 358 cfm Net Air Changes(Heat/Cool): 0.28/0.15 Sensible Eff: 50% Sensible Eff: 50% Net Flow(Heat/Cool): 501 cfm/269 cfm Floorplan/Levels Ground Floor 7,164 ft' Total Heated Area: 7,164 ft' Total Cooled Area: 7,164 ft' (1)AT:Difference between supply air and return air (2)Estimated air flow based on specified supply air AT Created Using LoopCAD 2023 Uponor(US)(12/142023) Length=ft Area=ft. Temperature=°F Flowrate=USGPM Air Flow=cfm Heat Loss=Btulhr Unit Heat Loss=Btu/(hrft') Rv=hrft'°Fbtu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmeti N=Not Heated See end of report for important Notes and Disclaimers. Page 1 of 6 Name:Garve Hyundai Load Report Project#:12/14/23-1 December 14,2023 Constructions Walls Code Description U-Value Area Heating Cooling 12F-osw Frame Wall or Partition;Wood Framing;R-21 Insulation in 2 x 6 Stud Cavity; 0.065 4,234 20,363 2,834 Stucco or Wood Siding;Plus Interior Finish Doors Code Description U-Value Area Heating Cooling 11J Metal Door with Fiberglass Core 0.600 884 39,250 11,138 Floors Code Description U-Value Area Heating Cooling 22B-10p 22B-Vertical Board Insulation Covers Slab Edge and Extends Straight Down to 0.100 341'- 8,962 0 Three Feet Below Grade,any Floor Cover 2"(P) Ceilings Code Description U-Value Area Heating Cooling 16A-38md No radiant barrier over ceiling or same type of air space behind an attic knee 0.026 7,164 13,783 12,106 wall;R-38 Insulation;Materials:Asphalt Shingles(a),Metal(m),Wood Shakes(w),Tar/Gravel(x),Membrane(z),Tile,Slate or Concrete;Colors: Dark(d),Light(I),White(w); Internal Loads Other Loads Description Sensible Latent Blower Load 1,706 Btu/hr Default(1,200 Btuh) 1,200 0 10 Occupants: 2,300 2,000 Total 3,500 2,000 (1)AT:Difference between supply air and return air (2)Estimated air flow based on specified supply air AT Created Using LoopCAD 2023 Uponor(US)(12/142023) Length=ft Area=ft. Temperature=°F Flowrate=USGPM Air Flow=cfm Heat Loss=Btu/hr Unit Heat Loss=Btu/(hrft.) Rv=hrft'°F/btu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmen N=Not Heated See end of report for important Notes and Disclaimers. Page 2 of 6 Name:Garve Hyundai Load Report Project#:12/14/23-1 December 14,2023 Load Breakdown Heating Load Breakdown Name Heating Sensible Latent Windows' 0 0 Skylights' _ 0 0 Doors 39,250 11,138 Walls . 20,363 2,834 Walls Doors Below Grade Walls 0 Ceilings 13,783 12,106 Floors 8,962 0 Ceilings Infiltration 40,397 2,924 4,949 , Internal 3,500 2,000 ,::;; \ Ventilation Other 0 _ Floors \jl Duct Loads 0 0 0 Ventilation 14,427 1,950 6,599 Humidification _ 0 Infiltra is J Piping Load _ 0 Radiant Back Loss 0 Blower Heat 1,706 Sensible Load Breakdown • AED' 0 Total 137,182 36,159 13,548 Total Area 7,164 ft' 7,164 ft' 'Average Load Procedure Walls Doors Heating AT':70.0 JSHR:0.73 . Cooling AT':22.0 MJB Tons:4.14 Est.Heating CFM':1611 SgFt/Ton:1729 Est.Cooling CFM':1357 CFM/SqFt:0.19 \ Blower Heat Ceilings % Internal entilation L n •ation (1)AT:Difference between supply air and return air (2)Estimated airflow based on specified supply air AT Created Using LoopCAD 2023 Uponor(US)(12/142023) Length=ft Area=ft' Temperature=°F Flowrate=USGPM Air Flow=afro Heat Loss=Btulhr Unit Heat Loss=Btu/(hr•tt') Rv=hrtt'-°Flbtu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmett N=Not Heated See end of report for important Notes and Disclaimers. Page 3 of 6 Name:Garve Hyundai Load Report Project#:12/14/23-1 December 14,2023 AED Fenestration Load vs Hour of Day-Block Load(Summer) Legend L • ® Load Line m — Average - 30 Percent 0 I I I I I I I I I I 1 I I 8 9 10 11 12 13 14 15 16 17 18 19 20 Hour of Day Average Load:0 Btu/hr Peak Load:0 Btu/hr Excursion Limit:0 Btu/hr AED Load:0 Btu/hr (1)AT:Difference between supply air and return air (2)Estimated air flow based on specified supply air AT Created Using LcopCAD 2023 Uponor(US)(12/142023) Length=ft Area=ff Temperature='F Flowrate=USGPM Air Flow=cfm Heat Loss=Blu/br Unit Heat Loss=BtW(hr•tF) Rv=hr•ft'•'F/btu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmen N=Not Heated See end of report for important Notes and Disclaimers. Page 4 of 6 • • Name:Garve Hyundai Load Report Project#:12/14/23-1 December 14,2023 Heating Zones Zone Area Room Temp Total Load Zone 101 7,164 70 122,755 Heating Rooms Room Area Room Temp Total Load` Body Shop 1,061 70 22,284 Detail Bays 2,254 70 43,717 - Offices 272 70 8,311 Parts,Storage,Shipping&Receiving 3,512 70 46,493 Toilet 65 70 1,950 •The sum of mom loads may not be equal to the project total due to additional system loads. Cooling Zones Zone Area Room Temp AED Sensible Load • Entire Building 7,164 75 YES 32,504 (Average Load Procedure) Cooling Rooms Room . Area Room Temp AED Sensible Load` Body Shop 1,061 75 YES 6,609 Detail Bays 2,254 75 YES 12,062 Offices 272 75 YES 1,261 Parts,Storage,Shipping&Receiving 3,512 75 YES 12,273 Toilet 65 75 YES 299 •(Average Load Procedure)The sum of roam loads may not equal the project total due to variations in solar gain and system loads. (1)AT:Difference between supply air end return air (2)Estimated air flow based on specified supply air AT Created Using LoopCAD 2D23 Uponor(US)(12/142023) Length=ft Area=ft' Temperature=°F Ftowrate=USGPM Air Flaw=cfm Heat Loss=Btulhr Unit Heat Loss=Btu/(hrft') Rv=hrft'•°F/blu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmefl N=Not Heated See end of report for important Notes and Disclaimers. Page 5 of 6 Name:Garve Hyundai Load Report Project#:12/14/23-1 December 14,2023 Disclaimers With the permission of the Air Conditioning Contractors of America('ACCA-),material is reproduced from Manual J Residential Load Calculation(8th Edition)which is copyrighted by ACCA.The program and data are provided"as is without warranty of any kind either expressed or implied.The entire risk as the quality and performance of the program end data is with you.In no event will ACCA be liable to you for any damages,including without limitation any lost profits,lost savings,or other incidental or consequential damages arising out of the use or inability to use this program or the data.©2015 Air Conditioning Contractors of America.At Rights Reserved.www.acca.org ACCA,Manual J and Powered by ACCA Manual J are registered trademarks of the Air Conditioning Contractors of America.All rights reserved. Cold weather humidification,or some lifestyles that produce excessive moisture,may cause condensation to occur if the absolute humidity of the indoor air is too high for the momentary circumstances.Condensation can occur on surfaces or concealed within the structure,and can lead to mold,mildew,frost damage,and moisture damage.The software does not perform calculations for the estimation or detection of possible condensation problems,and it is the designers(i.e.software users)responsibility to do so independently it required.For guidance and additional cautions refer to ACCA Manual J 8th Edition,including Section 1-11 and Section 27. The calculated values shown in this report are based on the data Input by the user of the software.Inaccurate or erroneous data input wit result in inaccurate or erroneous results.You are strongly advised to review all input data carefully,and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC.('AVENIR')OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT,NEGLIGENCE,STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL,INCIDENTAL,INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER(INCLUDING,BUT NOT LIMITED TO,DAMAGES FOR LOSS OF BUSINESS PROFITS,BUSINESS INTERRUPTION,LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE),EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT,AND REGARDLESS OF THE FORM OF THE ACTION,SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR'UNDER THE SOFTWARE LICENSE AGREEMENT. (1)AT:Difference between supply air and retum air (2)Estimated air flow based on specified supply air AT Created Using LoepCAD 2023 Uponor(US)(12/142023) Length=ft Area=IF Temperature=°F Flowrate=USGPM Air Flow=cfm Heat Loss=Btuinr Unit Heat Loss=BtW(hrft') Rv=hrft,°Frotu Version:23.0.0294 R Head Loss=ft water RH=Radiant Floor Heating BB=Baseboard FA=Forced Air OTH=Other Heating SM=Snowmelt N=Not Heated See end of report for important Notes and Disclaimers. Page 6 of 6 AED Report uponor Manual J8 Load Calculation Project#:12/14/23-1 December 14,2023 Project Information Project#: 12/14/23-1 Notes: Name: Garve Hyundai Location: 257 Dix Ave,Town of Queensbury,Warren County,NY Outdoor Conditions Indoor Conditions Floorplan/Levels Location: Glens Falls Heating Cooling Ground Floor 7,164 ft2 AP,New York Room Temp: 70°F 75°F Elevation: 335' Design Temp 74.0°F 10.0°F Total Heated Area: 7,164 ft2 Latitude: 43 Diff: Total Cooled Area: 7,164 ft2 Heating Cooling Humidity: 35 50 Dry Bulb: -4.0°F 85.0°F Moisture Diff(Grains): 27.4 Daily Range: Medium Wet Bulb: 71.0°F Fenestration Load vs Hour of Day(Summer) Legend r coLoad Line Average -- 30 Percent 0 8 9 10 11 12 13 - 14 15 16 17 18 19 20 Hour of Day Average Load:0 Btu/hr Peak Load:0 Btu/hr Excursion Limit:0 Btu/hr AED Load:0 Btu/hr All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 1 of 2 Project#:12/14/23-1 AED Report Name:Carve Hyundai December 14,2023 Disclaimers With the permission of the Air Conditioning Contractors of America("ACCA"),material is reproduced from Manual J Residential Load Calculation(8th Edition)which is copyrighted by ACCA.The program and data are provided"as is"without warranty of any kind either expressed or implied.The entire risk as the quality and performance of the program and data is with you.In no event will ACCA be liable to you for any damages,including without limitation any lost profits,lost savings,or other incidental or consequential damages arising out of the use or inability to use this program or the data.©2015 Air Conditioning Contractors of America.All Rights Reserved.www.acca.org ACCA,Manual J and Powered by ACCA Manual J are registered trademarks of the Air Conditioning Contractors of America.All rights reserved. Cold weather humidification,or some lifestyles that produce excessive moisture,may cause condensation to occur if the absolute humidity of the indoor air is too high for the momentary circumstances.Condensation can occur on surfaces or concealed within the structure,and can lead to mold,mildew,frost damage,and moisture damage.The software does not perform calculations for the estimation or detection of possible condensation problems,and it is the designers(i.e.software users)responsibility to do so independently if required.For guidance and additional cautions refer to ACCA Manual J 8th Edition,including Section 1-11 and Section 27. The calculated values shown in this report are based on the data input by the user of the software.Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully,and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC.("AVENIR")OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT,NEGLIGENCE,STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL,INCIDENTAL,INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER(INCLUDING,BUT NOT LIMITED TO,DAMAGES FOR LOSS OF BUSINESS PROFITS,BUSINESS INTERRUPTION,LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE),EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT,AND REGARDLESS OF THE FORM OF THE ACTION,SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 2 of 2 Manual J Worksheets uponofManual J8 Load Calculation Project#:12/14/23-1 December 14,2023 Project Information Project#: . 12/14/23-1 Notes: Name: Garve Hyundai Location: 257 Dix Ave,Town of Queensbury,Warren County,NY Form J1 (Summer) 1 flame of Room Garve Hyundai Entire House 2 Running Feet of Exposed Wall 341 3 Ceiling Height(Ft)and Gross Wall Area(SgFt) 15.0 5,118 4 Room Dimensions)Ft)and Floor Plan Area(SgFt) 7,1e4 5 Ceiling Slope(Deg.)and Gross Ceiling Area(SgFt) 7,164 HTM Btuh Type of Exposure Construction:lumber Panel Faces Area or Length Htg. Clg. Heating SClg. L-Cig. ba Windows and Glass a Doors 6b Skylights a 7 Wood and Metal Doors a 11J 44,40 12.e..o 884 39.250 11,138 8 Above Grade Walls and a 12F-0sn 4.81 0.67 4,234 20.383 2,034 ,Tar 9 Below Grade Walls s 10 Ceilings a 18A38md 1.92 1.69 7,164 13,783 12,106 11 Floors a 22B-10p 28.27 341(P) 8,962 Heating Load)Rtuh) 0.280 40,397 12 Infiltration Sensible Load(Btuh) Effect ACH WAR 1.0 2,924 0.150 Latent Load(Btuh) 4,949 a Occupants at 230 and 200 Mutt 10 2.300 2,000 b Scenario!lumber DeI 1.200 13 Internal c Default Adjustments d Custom Appliances e Plants Other User specified additional loads 14 Subtotals Sum lines 6 through 13 122,755 32.504 6.949 EHLF 8 ESGF 15 Duct Loads ELG 16 Ventilation Loads I Vent Cfm I 358 E Cfm 358 14,427 1,950 6,599 17 Winter Humidification Load Gal/Day 18 Piping Load 19 Blower Heat 1,706 20 AED Excursion 21 Total Load I Sum lines 13 through 19 137,182 38,159 13.548 • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 1 of 13 • Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet A Location And Design Conditions Location:Glens Falls AF,New Ycd5 Elevation:335 ft Latitude:43 Indoor Conditions,Heating: DB=70.0'F RH=35% Indoor Conditions,Cooling: DB=75.0°F I RH=50% Table'I Conditions 95%DB=-4.0'F 1%DB=85.0'F Coincident WB=71.0'F Daily Range=Medium Design Temperature Differences HTD=74.0'F CID=10.0'F AGrains=27.4 All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 2 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet B HTM Values for Windows and Glass Doors Garve Hyundai Panel Const-Ilumber Internal Shade Faces U-Value SHGC Insect Screen External Shading Overhang Heat HIM Cool HMI All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 3 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet C HTM Values for Skylights Garve Hyundai Item Const-number Internal Shading Tilt Faces U-Value SHGC Description Perimeter Area Ueff Heating HTM Cooling HIM All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 4 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet D HTM Values and Net Area for Opaque Panels • Garve Hyundai Heating HTM=U x HTD or U x FILM Construction HTD=74.0`F CID=10.0`F Design Range=Medium Cooling HTM=U x CLTD or U x PTDC [lumber and • • Exposure Average Gross Opening net Slab U-Value HID Group CLTD 46 Direction,or Length Height/ or Slab Heating Cooling Ceiling Slope (Ft) Width Area Area Area Edge F-Value or [lumber or HTM RIM(Ft) (SgFt) (SgFt) (SgFt) (Ft) PTDH 4A PTDC Wood and Metal Doors • a 111J I 92 I 10 I 884 I I I I 0.e00 I 74.0 I 21.0 44.40 I 12.e0 Above Grade Walls a 112F-0se I 341 I 15 I 5,118 I 884 I 4,234 I I 0.085 I 74.0 F I 10.3 I 4.81 I 0.67 Partition Walls I I I • I I I I I I I ;I I Below Grade Walls Ceilings a I1eA-38nvi •I I 7.184 I I 7,1e4 I 0.028 I 74.0 I 95.0 1.92 I 1.e9 Passive Floors a I22B-10p I I I 7.1e4 I I I 341 I 0.355 I 74.0 - I 0.0 I 28.27 I 0.00 Radiant Floors • • • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) • Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 5 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet E Infiltration Loads HTD=74.0°F I CTD=10.0°F I Design Grains=27.4 Table 10A ACF=0.99 Step 1,Option 1-Infiltration Loads for Ileutral Space Pressure Based on Table 5 ACH Values Operating Floor Table 5 Space AGV Space Fireplace Total Mode Area Leakage (CuFt( Category ACH (CuFt( ICFM ICFM ICFM Heating 7,154 Avwage 0.28 107,453 501 0 501 Cooling 7.154 Aveesge 3.15 107,453 2e9 2e9 Step 2-Infiltration Loads on Central Equipment(Adjusted for Space Pressure( Type of VCFM OA Cfm Cfm ICFM Het H&C Load Line 11, Flowing to Exhausted CF .> (Option I) In51t CFM Loads Worksheet H Space from Space tICFM (Btuh) Heat Load 358 358 358 0 501 501 40.397 Sens Load 2,924 358 358 358 0 2e9 259 Lat Load 4.349 1. The room infiltration Iced equals the blodi infiltration load en the central equipment multiplied by the grow wall area ratio(WAR). 2. WAR=Gross room wall area/Gross wall area for all rooms served by the central equipment. All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 6 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet F Internal Loads Sensible Latent Load Use Sensible Latent Source of Internal Load Count Factor Factor pith) (glob) Factor Factor Load Load a Occupants 10 230 200 1.0 1.0 2,300 2,000 Total occupancy load for Form J1(Btuh)= 2,300 2.000 Default Scenario b Default(1.200 Etch)I 1 I 1,200 I I 1.0 I 1.0 1,230 Default scenario load for Form J1(Etuh)= 1.200 Adjustments to Default Scenario c None I I I Total adjustment options for Form J1(Btuh)= Individual Appliance Options d None I I I I I Total individual appliance load for Form J1(Btuh)_ Plants e Small 0 10 Medium 0 20 Lsrge 0 30 Total plant load for Form J1(Btuh)= Consider diversity;Load Factor=Average input/Rated or Nameplate Input;Use Factor=Percent operating time for one hour All load values shown in Btulhr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 7 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet H Ventilation Loads Garve Hyundai Hro LAr Site SER For VDH ,,, Elevation Table 1 Condition of Only and LATr Ti Type of VCFM LER Air Leaving Outdoor CT oti D V-Grains Vent. Load or for Heal Ventilation Indoor Condition for '35 Indoor Loads CFMo,n Recovery Dehumidifier Grains To and From Ventilation Drybulb tBtuhi Ventilator for Site Grains Wdaht A air Table 10A Elevation - _ ACF Heat Load 358 0.5 LATvoe -4.0°F 74.0'F 33.0 70.0 14,427 Table 12 Sen Load 0.5 LATvo, 85.0'F. 10.0'F 80.0 0.99 75.0 1,950 358 - - Lat Load 0 Grainvoa 27.4 27.4 8,599 • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 8 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Worksheet I Ancillary Loads 1 Garve Hyundai Winter Humidification Heating Load Indoor Conditions Table 1 Values Table Table 12 Grains Outdoor CFM Humid Gallons DI Relative Winter Site 10A Outdoor Indoor stet fnfilt Vent Total H-Load Per Bulb Humidity Dry Bulb Elevation ACF ODGR IDGR HCFM VCFM TCFM (Mull) Day • TO 0 35% -4.0 225 0.989582 3.8 38.5 501 358 850 0.0 Heat of_evaporation provided by central heating equipment Heating Load=0.58 x TCFM x(IDGP.-ODGR)x ACF Humidification(RH Value)shall not cause visible or concealed condensation Gallons Pei Day=0.00272x Heating Load (per Section 27 procedures) Hot Water Piping Load Feet Water Ambient Table 9 Piping WTO=T„-T,. Wall ID Size/Type of Pipe Temp. Temp. Factor Load P4=1.1 x L;x INTO,x F9, 4 Tr°F T,F 11/111 F9, PL, System Total(Stun).Sum PL, System Total Blower Motor Load ManufacturersBlower Motor Power from Default Default Sensible Sensible Load=3.413 x watts Sensible Capacity Manufacturer's Blower Table Power Load Load Sensible Loud=3.413 x KW Data not Adjusted Watts KW HP Watts Btuh Bb, Sensible Load=3,5D0 x HP h for Blower Heat 500 1,705 Moisture Migration Load Moisture will migrate through porous ceiling.wall,and floor materials that are not protected by a vapor retarding membrane.The latent moisture migration load for summer cooling may bean important issue if the structure dos not have an appropriate vapor retarding membrane for the local summer climate.For winter humidification,moisture migration may cause visible or concealed condensation.mold,mildest,and structural damage,See the full version of Manual J,Section 28 for basic guidance.Contact the Energy Efficient Building Association(EEBA)for comprehensive guidance pertaining to membrane need and use.See the 2012 ASHP-AE Handbook of Fundamentals.Chapter 25 and Chapter 26.Compare local code with EESA'ASHRAE guidance. Incompatibilities require the attention of the local code authority.Joe Lstibureh is the primary authority on this issue(obtain contact info from the EEBA.ASHRAE,cr irtemet search). 1 All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 9 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Room Loads Garve Hyundai Room Heat Load Sens Load (Btuh) (Btuh) Body Shop 22,284 6,609 Data Bays 43,717 12,062 Offices 8,311 1,261 Parts,Storage,Shipping 8 Receiving 46,493 12,273 Toilet 1,950 299 ':overage Load Procedure • • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 10 of 13 • Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Total Heating:137,182 Total Sensible:36,159 Total Latent:13,548 :lame Heating Sensible Latent 'Windows' 0 0 Skylights' 0 0 Doors 39,250 11,138 Wags 20,363 2,834 Below Grade Walls 0 Ceilings 13,783 12,106 Floors 8,962 0 Infiltration 40,397 2,924 - 4,949 Internal 3,500 2.000 Duct Loads 0 0 0 Ventilation 14,427 1,950 6,599 Humidification 0 Piping Load 0 Radiant Back Loss 0 Recovered Back Loss 0 Blower Heat 1,706 AED• 0 Total Load 137,182 36,159 13,548 Total Area 7,164 ft' 7,164 n' 'Average Load Procedure All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 11 of 13 • Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Constructions Walls Code Description U-Value(btu/(hr-ft'.'F)) 12F-0sw Frame Wall cr Partition;Wood Framing.R-21 Insulation in 2 x 8 Stud Cavity;Stud or Wood Siding;Plus Interior Finish 0.085 Doors Code Description U-Value(btu/(hrft' F)) 1 1 J Metal Door with Fiberglass Core 0.800 Floors Code Description U-Value(btuJ(hrft°-°F)) 228-10p 228-Vertical Board Insulation Covers Slab Edge and Extends Straight Down to Three Feet Below Grace.any Floor Cover 0.100 Ceilings Code Description U-Value(btW(hr-ft'-'F)) 18.A-36md do radiant barrier over ceiling or same type of air space behind en attic knee wall;R-39 Insulation:Materials:Asphalt Shingies(a). 0.0213 Metal(m),Wood Shakes(w).Tar i Gravelix),Membrane(o),Tile.Slate or Conmete:Colors:Dark(d),Light(l),Whitehv); • • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 12 of 13 Project#:12/14/23-1 Manual J Worksheets Name:Garve Hyundai December 14,2023 Disclaimers With the permission of the Air Conditioning Contractors of America("ACCA"),material is reproduced from Manual J Residential Load Calculation(8th Edition)which is copyrighted by ACCA.The program and data are provided"as is"without warranty of any kind either expressed or implied.The entire risk as the quality and performance of the program and data is with you.In no event will ACCA be liable to you for any damages,including without limitation any lost profits,lost savings,or other incidental or consequential damages arising out of the use or inability to use this program or the data.©2015 Air Conditioning Contractors of America.All Rights Reserved.www.acca.org ACCA,Manual J and Powered by ACCA Manual J are registered trademarks of the Air Conditioning Contractors of America.All rights reserved. Cold weather humidification,or some lifestyles that produce excessive moisture,may cause condensation to occur if the absolute humidity of the indoor air is too high for the momentary circumstances.Condensation can occur on surfaces or concealed within the structure,and can lead to mold,mildew,frost damage,and moisture damage.The software does not perform calculations for the estimation or detection of possible condensation problems,and it is the designers(i.e.software users)responsibility to do so independently if required.For guidance and additional cautions refer to ACCA Manual J 8th Edition,including Section 1-11 and Section 27. The calculated values shown in this report are based on the data input by the user of the software.Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully,and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC.("AVENIR")OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT,NEGLIGENCE,STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL,INCIDENTAL,INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER(INCLUDING,BUT NOT LIMITED TO,DAMAGES FOR LOSS OF BUSINESS PROFITS,BUSINESS INTERRUPTION,LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE),EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT,AND REGARDLESS OF THE FORM OF THE ACTION,SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. • All load values shown in Btu/hr Created Using LoopCAD 2023 Uponor(US)(12/14/2023) Software Version:23.0.0294 R See sections at end of report for important Notes,Assumptions and Disclaimers. Page 13 of 13 C mmmmmmim Ilmmmmmmm anrvmoi mim U (� Ti 0 �11� S 518.832.9213 1 ryan@clearvuinspections.com 1 18 Blackberry Lane,Queensbury,NY 12804 Hilltop Construction Co. C/O Dan Washburn 3027 4th St, Hudson Falls, NY 12839 danw@hilltopconstructionco.com 518-260-7363 RE: Garvey Hyundai Garage Blower Door In lieu of a blower door test,we propose to perform (1)visual inspections at the new construction garage located at 257 Dix Avenue,Queensbury, NY 12804 to verify compliance to IECC-C402.5 IECC-C402.5-The thermal envelope of buildings shall comply with Sections C402.5.1 through C402.5.8,or the building thermal envelope shall be tested in accordance with ASTM E 779... 5111"'ui'Suiuii 'urui' (1)Visual Clearance Inspection - $500.00 - If additional inspections are required,they will be bill at $125.00 per occurrence.Terms are net 15. Date: 12.14.2023 Ry n Wild ClearVU Inspect: ns LLC 0�0 IM/ - - ate: n Washb n i 111\pn(6WI...... N„IN4\I\l1{VNph `111�111phIIAhN�hll�hli�hlj� ::..il.sC.:lo noble.`:oINNNIN.�,i CiCly10 its for 4 Chelsea Place Suite 102—Clifton Park,NY 12065 Phone:518-450-7292 Fax:518-450-7295 Design Review-Commissioning-Fire Life Safety-Test&Balance-ASHRAE 110-Drone Sales/Inspections December 12,2023 Dan Washburn Vice President Hilltop Construction Re: Garvey Hyundai Body Shop 257 Dix Ave—Queensbury, NY HVAC Air Balancing Dan, Mechanical Testing Inc. has agreed to perform the HVAC air balancing for the new Body Shop project at Garvey Hyundai in Queensbury, NY. The air balancing will include the new HVAC systems being installed. Once our field work is completed,we will submit a certified typed report for engineer/town review. Feel free to reach out with any questions. Glad to help. Regards, elffla Ken McThenia Chief Estimator 9 W��',��MENac OWNED mo� mmI1 yJ/ muJ �' ��� �, UWVM'k�tt �luull u. C CERTIFIED BY ,. ���/� Cdbk7fdrR185S1101 ilin resnxy no.lusnxc axo auxxclxc euxFJ.0 Rhvac Online Elite Software Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York Page 1 Manua/S Performance Data - System 1 - Main Loads and Design Conditions Cooling: Outdoor Dry Bulb: 71 Sensible Gain: 75.000 Outdoor Wet Bulb: 71 Latent Gain: 21.000 Indoor Dry Bulb: 75 Total Gain: 96.000 Indoor RH: 50 Load SHR: 0.78 Supply Airflow: 3200 Entering Dry Bulb: 75 Entering Wet Bulb: 62.5 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions This system's equipment was selected in accordance with ACCA Manual S. Cooling: Model Type: Standard Air Conditioner, Outdoor Model:YC2D48SB21, Indoor Model:XAHD60GBCN1 AHRI Reference Number:210541931, Nominal Capacity: 96.000, Manufacturer:York Entered Interpolation Data: EDB EDB Total 75°F 75°F EWB Airflow ODB Capacity Sen. Cap Sen. Cap °F CFM °F MBtuh S/T MBtuh 62.5 3200 71 96 0.78 75 Interpolation Results: Percent Load of Load Sensible Capacity: 75.000 75.000 100% Latent Capacity: 21.000 21.000 100% Total Capacity: 96.000 96.000 100% Heating: Model Type: Natural Gas Furnace, Model:TM9Y120D20MP11, Nominal Capacity:240.000, Manufacturer: York Results: Percent Load of Load Heating Capacity: 240.000 174.000 138% Garvey Hyundai Monday, December 18,2023 Rhvac Online Elite Software Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York Page 2 Manual S Performance Data - System 2 -Additional System Loads and Design Conditions Cooling: Outdoor Dry Bulb: 0 Sensible Gain: 0.000 Outdoor Wet Bulb: 71 Latent Gain: 0.000 Indoor Dry Bulb: 75 Total Gain: 0.000 Indoor RH: 50 Load SHR: 0.00 Supply Airflow: 0 Entering Dry Bulb: 0 Entering Wet Bulb: 0 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions Cooling: Model Type: , Manufacturer: Interpolation Results: Percent Load of Load Sensible Capacity: 0.000 0.000 0% Latent Capacity: 0.000 0.000 0% Total Capacity: 0.000 0.000 0% Heating: Model Type: , Model: , Manufacturer: Results: Percent Load of Load Heating Capacity: 0.000 174.000 0% Garvey Hyundai Monday, December 18,2023 Rhvac Online Elite Software Development, Inc. FW Webb Co Garvey Hyundai Ballston Spa, New York Page 3 Manua/S Performance Data - System 3 -AnotherAdditionai System Loads and Design Conditions Cooling: Outdoor Dry Bulb: 0 Sensible Gain: 0.000 Outdoor Wet Bulb: 71 Latent Gain: 0.000 Indoor Dry Bulb: 75 Total Gain: 0.000 Indoor RH: 50 Load SHR: 0.00 Supply Airflow: 0 Entering Dry Bulb: 0 Entering Wet Bulb: 0 Heating: Outdoor Dry Bulb: -4 Sensible Loss: 174.000 Indoor Dry Bulb: 70 Entering Dry Bulb: -4.0 Indoor RH: 30 Supply Airflow: 3,200 Equipment Performance Data at System Design Conditions Cooling: Model Type: , Manufacturer: Interpolation Results: Percent Load of Load Sensible Capacity: 0.000 0.000 0% Latent Capacity: 0.000 0.000 0% Total Capacity: 0.000 0.000 0% Heating: Model Type: , Model: , Manufacturer: Results: Percent Load of Load Heating Capacity: 0.000 174.000 0% Garvey Hyundai Monday, December 18,2023