IM Inspection Worksheet_12-12-2023_13-24-54INSPECTION WORKSHEET (FDTN-029318-2023)
RC-0315-2023Case Number:Case Module:Permit Management
12/12/2023 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:7 Midnight Dr South
Queensbury, NY 12804
301.8-1-41
Company Name NameContact Type
Applicant Nadim Sheikh
Engineer Cobble Court Engineering PLLC
Granted Permission Shamim Sheikh
Primary Owner Nadim Sheikh
Checklist Item CommentsPassed
Building Inspector Notes False
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour False
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True
Footing Drain stone - 6 mil poly False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place False
Reinforcement in Place True with 2 rows # 4 continuous
Permit Card Visible From Road False
Poly Under Slab False
Footing Dowels or Keyway in place True wet sticking J hooks
December 12, 2023 Page 1 of 1