Loading...
IM Inspection Worksheet_12-12-2023_13-24-54INSPECTION WORKSHEET (FDTN-029318-2023) RC-0315-2023Case Number:Case Module:Permit Management 12/12/2023 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:7 Midnight Dr South Queensbury, NY 12804 301.8-1-41 Company Name NameContact Type Applicant Nadim Sheikh Engineer Cobble Court Engineering PLLC Granted Permission Shamim Sheikh Primary Owner Nadim Sheikh Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour False 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True Footing Drain stone - 6 mil poly False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place False Reinforcement in Place True with 2 rows # 4 continuous Permit Card Visible From Road False Poly Under Slab False Footing Dowels or Keyway in place True wet sticking J hooks December 12, 2023 Page 1 of 1