IM Inspection Worksheet_19-12-2023_15-02-05INSPECTION WORKSHEET (SEP-029488-2023)
SEP-0767-2023Case Number:Case Module:Permit Management
ScheduledInspection Status:Inspection Date:
SepticInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:25 Cedarwood Dr
Queensbury, NY 12804
296.9-2-23
Company Name NameContact Type
Applicant IBS Septic
Contractor IBS Septic
Granted Permission IBS Septic
Primary Owner William Yole
Checklist Item CommentsPassed
Building Inspector Notes False
Soil Type: Sand False
ETU Maintenance Contract provided False
Size of Stone False
Final Electrical False
Roof gutters don't discharge over leach field False
Waterline separation distance False
Building to Tank False
Public Sewer Sign-Off False
[Provide extension collar if Yes]False
Tank to Distribution Box False
Size False
Opening Sealed:False
Soil Type: Clay False
90% alarm level activates False
End Cap False
Absorbtion Fields: Total Length False
Septic system field above flood plain False
Foundation to Tank False
Engineer Report and As-Built False
Sump pump not connected to septic system False
Water shut off activates at 90% full False
Well Casing Length: 50ft +/-False
Location of system on property False
Inlet & Outlet manholes 12"+ below grade False
Septic tanks & pump station anchored in flood zone False
Water softener not connected to septic system False
Type of Water: Municipal / Well Water False
Locations / Separations False
Well separation distance False
Depth of Trenches False
December 19, 2023 Page 1 of 2
INSPECTION WORKSHEET (SEP-029488-2023)
Checklist Item CommentsPassed
Separation of Pits False
Stone Size:False
Seepage Pits: Number False
Length of Each Trench False
System Use Status False
Conforms as per Plot Plan False
Size of tank False
Distribution box to Field / Pit False
Foundation to Absorption False
InletOutlet Pipes & Baffles False
50% alarm level activates False
Soil Type: Loam False
December 19, 2023 Page 2 of 2