IM Inspection Worksheet_20-12-2023_14-55-49INSPECTION WORKSHEET (PTI-029419-2023)
PT-0403-2022Case Number:Case Module:Permit Management
12/20/2023 PassedInspection Status:Inspection Date:
Property Transfer InspectionsInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:80 Rockhurst Rd
Queensbury, NY 12804
227.13-2-42
Company Name NameContact Type
Agent Rucinski Hall Architecture
Primary Owner Joseph Sheehan
Checklist Item CommentsPassed
Watertight True
Building Inspector Notes False 5/31/23 home is still under rehabilitation and rough plumbing has
not been completed / inspected. Main line was verified for flow into
first of 3 holding tanks, via of pouring water into main line. House
plumbing must be completed as to test each fixture for flow into
the first holding tank.Last tank in line, I was able to verify floats and
water shut off, but not the operation of alarms or water shut off
(solenoid)
Operation of floats / alarm / and water shut off verified 12/20/23
Weather/lack of information/inaccessibility False
Holding tank (if yes, include capacity)True (3) 1500 gallon
System/components indicate unacceptable False
Is there a high water alarm?True Yes
Concrete tank True
Temperature (Fahrenheit)True 75+
Plumbing fixtures tested & confirmed True Via at drain lines
Holding Tank:verify level rises; cap. w/in 250 gal True
System appears undersized/undersized components False
Verify 50% & 90% floats True
Tank cover True Steel manhole (traffic rated)
System appears to have functioned adequately True
System passes all function testing True property transfer completed / all fixtures verified for flow to holding
tanks with testing of floats / alarm and water shut off
Evidence of prolonged high liquid level False
Access riser? (if yes, depth to cover)True Steel manhole
Inlet baffle True
No treatment tank/other critical component(s)False
As-built provided is accurate False for new holding tanks
Test each fixture flow to septic tank True No / DWV and supply not completed - 12/20/23 flow test of fixtures
completed
On-site as-built req'd before insp is complete True
Are both switch and alarm operable?True Newly installed, main panel box not completed. In order for a
certificate of occupancy, all parts of the system will have to be
verified of operation.
All verified 12/20/23
Outlet baffle False
December 20, 2023 Page 1 of 2
INSPECTION WORKSHEET (PTI-029419-2023)
Checklist Item CommentsPassed
Weather True Sunny
Are there any obvious electrical shortcomings?False
December 20, 2023 Page 2 of 2