IM Inspection Worksheet_20-12-2023_15-33-53INSPECTION WORKSHEET (RESFINAL-029546-2023)
RC-0539-2022Case Number:Case Module:Permit Management
12/20/2023 Partial PassInspection Status:Inspection Date:
Residential Final InspectionInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:80 Rockhurst Rd
Queensbury, NY 12804
227.13-2-42
Company Name NameContact Type
Applicant Joseph Sheehan
Architect Rucinski Hall Architecture
Contractor Vern Edwards
Granted Permission Joseph Sheehan
Primary Owner Joseph Sheehan
Checklist Item CommentsPassed
Low flow toilet 1.3 gal/flushing cycle False
Bathroom Fans, if no window True
3" Plumbing Vent through roof minimum 18 inch True
Grade away from foundation: 6" down, 10' out False
Final Survey Plot Plan False N/A
Window guards req:<2' above floor/6' above grade True
Interior privacy/trim/doors/main entrance 36 True
Backflow Preventors where required False
Basement wall insulation R- value verified True
Emergency egress below grade True
Intake Openings True
Safety glazing: w/in 5' of tub/shower False
Site Plan / Variance required False provide site plan certification
Seals on Garage Doors, esp. Wood True
Not less than 3' horiz from opening of bthrn True
Basement ceiling covered 2x8 fl joist or less True
Attic Access Insulation = Attic R- Value False N/A roof deck with foam
Gas Shut-off Exposed & Regulator 12" min abv grd False propane
Platform at all exterior doors True
Garage Floor Pitched True
Wood deck: 2'+ from grade dia bracing required True
Inter Connected True
Arc Fault Breaker Habitable Spaces False
Dryer Duct Max Length 35', Labeled Over 35'False
Energy Sticker on Elec. Panel:R-Val. & Heating Sys False
Furnace/Hot Water Heater operating True
Fresh Air Intake True
Basement stairs closed rise greater than 4 inches True
Foam in basement/attics covered w/thermal barrier True
December 20, 2023 Page 1 of 3
INSPECTION WORKSHEET (RESFINAL-029546-2023)
Checklist Item CommentsPassed
Outside every bedroom area True
Blower Door Test Certification False N/A
Fin Elect; Energy Saving Light Bulbs 90 Percent False
Heat detector in garage False
Gas Log In Sealed or Glass Enclosure False
OK to Issue C/O False
Truss ID Signage Installed at Electrical Meter False
Range Hood 400+ cfm-Fresh Air REQUIRED False
4 inch Building Number Address visible from road False
HVAC Vent Terminal 10' from Lot Line & Openings True
Attic Access Gasketed True
Jack posts in basement lagged at top and bottom True
Guard at deck, porches 36" or more True
6" clearance to sill plate True
Propane Tank: Proper Setback from Prop Line/Struct True
4+ Deck Joist Ledger Connections-24" From Ends True
20 Minute Fire Door/Self-Closing Hardware True
Every level, Every bedroom True
Furnace shut-off w/in 30 ft. or w/in line of site True
within 10' of all sleeping areas True
on all levels w/gas appliances (i.e. furnace)True
Relief Valve ,Heat Trap/Water Temp 110 deg or less False
Electronic as-builts False
Attic Access 22 x 30 minimum True
As Built Septic System False provide sign off Architect asbuilt
Handrail Termination at Newell Post or Wall False
Duct work sealed properly True
General Comments True walk through for Temporary C/O- 1. A water tight kitchen 2. A
working bath 3. Complete septic system (holding tanks) provide
Architect sign off 3. Property Transfer to be completed 4. Provide
final electrical 5. Provide "site plan certification" 5. Provide set of
temporary steps at front door
Items 1,2,3 verified with exception of Architect as built for holding
tanks. Items 4&5 verified. 12/20/23
Flex Gas Pipe Bonding False
Outside Spigots have Air Gap True
Guard at stairwell at 34" or more True
Battery backup True
Plumbing fixtures False
Interior/Exterior Railings 34 to 38 True
Deck Ledger-Bolted per Code True
Carbon Monoxide Detectors:True
Basement Egress: 5s.f. window w/sill or Bilco door True walk out
Pull down stairs boxed out and insulated True
December 20, 2023 Page 2 of 3
INSPECTION WORKSHEET (RESFINAL-029546-2023)
Checklist Item CommentsPassed
HRV or ERV Installed per Bedroom Requirements True
1/2" Gypsum or House Wall and Gable True
Guards at stairs,decks,patios 30" + above grade True
Handrail 4 or more risers True
Roof Complete / Exterior Finish Complete True
Encl. Stairs Sheetrock Underside minimum ½ Gypsum True
Bathroom / Kitchen Watertight True
All Hot Water Systems: 3/4" or larger piping R-3 False
Foundation insulation to floor True
Smoke Detectors:True
Fresh air supply 3' from grade True
OK to Issue Temporary C/O True Conditions for temp C/O : Provide septic / holding tank as built
from Architect. Provide site plan certification for zoning. Fee for 90
Day temp C/O 165.00, if over 90 day, you will have to pay renewal
fee. CMD 12/20/23
December 20, 2023 Page 3 of 3