IM Inspection Worksheet_02-01-2024_14-29-48INSPECTION WORKSHEET (FDTN-029636-2023)
CC-0596-2023Case Number:Case Module:Permit Management
01/02/2024 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:John O'Brien
Job Address:Parcel Number:1471 State Rte 9
Lake George, NY 12845
288.-1-58
Company Name NameContact Type
Applicant Russell Faden
Engineer Dreamscapes Unlimited
Granted Permission 1471 St Rt 9 LLC
Primary Owner 1471 St Rt 9 LLC
Checklist Item CommentsPassed
Building Inspector Notes False 12/21/23 partial approval for foundation.
- Footings approved.
1/2/24 Building Foundation Inspection Partial Approval
- North & West Frost Walls
Footing Drain Stone - 12 inch width False
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True 1/2/24 Building Foundation Inspection Partial Approval
- North & West Frost Walls
5 psi or 10 ft. above highest conn. for 15 minutes False
Masonry Wall False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing False
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Monolithic Slab False
Footings True 12/21/23 partial approval for foundation.
- Footings approved.
Footing Drain stone - 6 mil poly False
Piers False
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True 1/2/24 Building Foundation Inspection Partial Approval
- North & West Frost Walls
Reinforcement in Place True 12/21/23 partial approval for foundation.
- Footings approved.
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place False
January 02, 2024 Page 1 of 1