Loading...
CC-0862-2021 PRINCIPLE STRUCTURE Office Use Only l ' PERMIT APPLICATI ON Permit#: - - og(02- 2021 ____ J%` Permit Fee:$ 5 1/42 0o — Town of Q eensbury 742 Bay Road,Queensbury, NY 12804 *Rec Fee:$ o .� - NIA' P: 518-761-8256 www.queensburynet Invoice#: 4 f49 Flood Zone? Y NJ Reviewed : ,/ ,,- Project Location: 407 Big Bay Road Tax Map #: 309.17-1-16 Subdivision Name: *TOWN BD.RESOLUTION 385-2020:$1000 recreation fee for new dwelling units:singl f it , o-aiimy multiplefamily, apartments,condominiums, townhouses,and/or manufactured & m r hott,lout not mob I (uJ homes. This is in addition to the permit fee(s). 2021 TOWN OF QUEENSBURY PROJECT INFORMATION: BUILDING& CODES Residential X Commercial, Proposed Use: Office space / Single-Family: —Two-Family —Multi-Family(#of units:_) 1. Custom 2. Modular(REQUIRED:NYS stamped engineered drawings of foundation plans) Townhouse _Garage (#of cars_) —Business Office _Retail _Hotel/Motel _Industrial —Heated Warehouse/Storage Building _Unheated Warehouse/Storage Building Amusement Ride _Other(describe: ) MAIN STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1ST floor: 1ST floor: 16,000 2"d floor: 2"d floor: 3rd floor: Total square feet: Basement(habitable space): Total square feet: 16,000 Principle Structure Packet Revised December 2020 \ ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$ 3,000,000 2. Proposed use of the building: Offices for Brookfield Power 3. If Commercial or Industrial, indicate the name of the business: Brookfield Power 4. Source of Heat: X Gas _Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? YES X NO Explain, if yes: 6. Are there any easements on the property?_YES X NO 7. SITE INFORMATION: a.What is the dimensions or acreage of the parcel? 1.62 Acres b. Is this a corner lot? _YES X NO c. Will the grade be changed as a result of the construction? X YES NO d. What is the water source? X PUBLIC PRIVATE WELL e. What type of wastewater system is on the parcel? x SEWER PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a NYSlicensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: Ethan P. Hall -ArchitectWgent for the Applicant SIGNATURE: (TVtapt, A //ail DATE: 4 Dec 2021 Principle Structure Packet Revised December 2020 CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): JP Gross Properties, LLC Mailing Address, C/S/Z: 27 Silver Circle, Queensbury NY 12804 Cell Phone: ( 518 )361-0607 Land Line: ( 518 )792-0216 Email: igross0,grosselectricinc.com • Primary Owner(s): Name(s): JP Gross Properties, LLC Mailing Address, C/S/Z: 27 Silver Circle, Queensbury NY 12804 Cell Phone: ( 518 )361-0607 Land Line: ( 518 )792-0216 Email: jgross@grosselectricinc.com ❑ Check if all work will be performed by property owner only, • Contractor(s): (List all additional contractors on the back of this form) Contractor Name(s): JAG Group, LLC Contractor Trade: General Construction Mailing Address, C/S/Z: 8 Blue Lupine Lane, Wilton NY 12831 Cell Phone: ( 518 )361-1254 Land Line: ( 518 )812-0808 Email: tim(c�iaggroupllc.com **Workers' Comp documentation must be submitted with this application** • Architect(s)/Enqineer(s): Business Name: Rucinski Hall Architecture Contact Name(s): Ethan P. Hall Mailing Address, C/S/Z: 134 Dix Ave, Glens Falls NY 12801 Cell Phone: ( 518 )260-2888 Land Line: ( 518 )741-0268 Email: ephall nycap.rr.com Contact Person for Compliance in regards to this project: Ethan P. Hall Cell Phone: ( 518 )260-2888 Land Line: ( 518 )741-0268 Email: ephallanycap.rr.com Principle Structure Packet Revised December 2020 CHECKLIST--SINGLE FAMILY Project Location: REQUIRED-2 SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ResCheck, completed &signed 3. Septic alteration application, if applicable 4. Solid fuel burning or gas insert appliance form(s), if applicable 5. Driveway permit, if applicable 6. Structural drawings, including: a. Floor plans b. Foundation plans c. Cross sections d. Elevations e. Window&door schedule f. Natural light,ventilation &emergency egress 7. Plot plan:showing proposed structure(s) with setback dimensions from all surveyed property lines 8. Electrical inspection agency selected CHECKLIST--MULTI-DWELLING/COMMERCIAL Project Location: 407 Big Bay Road REQUIRED-2 SETS 1. Building Permit application, completed YES NO N/A 2. Energy Code inspector's report from ComCheck, completed &signed X 3. Septic alteration application, if applicable X 4. Solid fuel burning or gas insert appliance form(s), if applicable X 5. Driveway permit, if applicable X 6. Structural drawings, including: X a. Floor plans b. Foundation plans c. Cross sections d. Elevations e. Design loads including floor, snow&wind load f. Seismic design g. Plans signed and sealed by registered architect or engineer h. Window&door schedule 7. Plot plan:showing proposed structure(s) with setback dimensions from all X surveyed property lines 8. Electrical inspection agency selected 9. FINAL AS-BUILT PLANS SUBMITTED ELECTRONICALLY X Principle Structure Packet Revised December 2020 CONSTRUCTION TECHNOLOGY INSPECTION & TESTING DIVISION, P.D.&T.S., INC. 4 William Street,Ballston Lake,New York 12019 Phone: (518)399-1848 Email: constructiontech@live.com December 22, 2021 -- GROSS ELECTRIC,INC. a LE COIF 27 Silver Circle Queensbury,New York 12804 Att'n: Building Code Enforcement Officials Re: 80'X 200' BUILDING:407 BIG BAY ROAD, QUEENSBURY,NEW YORK Construction Materials Inspection and Testing Services Greetings, Per the request,Mr.Ai Gordon, GROSS ELECTRIC,INC., we are pleased to inform you CONSTRUCTION TECHNOLOGY has been retained to provide the construction materials inspection and testing services required of the referenced project including but not limited to: Soil compaction, structural steel, and portland cement concrete inspection and testing. As such, we would like a moment to introduce our organization. CONSTRUCTION TECHNOLOGY is the construction materials inspection division of Product Development& Technical Services, Inc. Since our 1984 incorporation in New York State, we have been devoted to providing the highest standards of on time field inspection, testing and laboratory support to the construction industry. Our desire is a QC/QA involvement with projects committed to timely completion while satisfying the quality controls and assurances necessary to support today's strict design criteria. All too often materials inspections are viewed as a necessary evil or a requirement to be overlooked. Many times the laboratory brings this attitude on itself because of less than fully qualified personnel, tardy response time or uncompromising attitudes of technicians. Given the opportunity, we are confident we can provide the services that reflect our strong desire to be an asset to the construction process. Our facility and field technical force is supported by state of the art test equipment, including nuclear soil/asphalt density test equipment, automatic soil moisture/density (Proctor) apparatus, temperature/humidity controlled curing environments for concrete specimens, and all other necessary equipment to satisfy the requirements of the American Society for Testing and Materials (ASTM) standards C-1077 and E-329 as they relate to a commercial inspection agency. CONSTRUCTION TECHNOLOGY has submitted to outside auditing by having our personnel, equipment, facility and quality assurance plan evaluated by the Cement and Concrete Reference Laboratory (CCRL) of the National Standards Institute. A copy of the CCRL/NSI audit and finding is available upon request. r' December 22, 2021 GROSS ELECTRIC,INC. Re: 80' X 200' BUILDING:407 BIG BAY ROAD,QUEENSBURY,NEW YORK Construction Materials Inspection and Testing Services Our staff ranges from consultant Professional Engineers,hydrologists and geologists to field technicians and materials inspectors with technical backgrounds of educational degrees and/or substantiated experience in a construction oriented discipline. Field inspectors also possess a combination of the following certifications: * Certification at various levels (AET-I through SET-IV) by the National Institute for Certification in the Engineering Technologies (NICET). * American Concrete Institute (ACI) Grade I Concrete Inspector. * American Concrete Institute (ACI) Certified Concrete Construction Special Inspector. * North East Transportation Training &Certification Program(NETTCP). Certified Soil and Aggregate Inspector * Troxler Nuclear Gauge Training Program for Radiation Safety Officers and Field Operators. * NYSDoT Certified Asphalt Density Inspector. * J&L Testing,Inc. Certification Program for Sanitary Landfill Inspectors. * J&L Testing, Inc. Certification Program for Quality Control and Inspection of Geosynthetic Systems for Use in Solid and Hazardous Waste Disposal Facilities. In addition to particular qualifications, field inspectors are familiar with all phases of construction materials testing and inspection including soils, concrete, reinforcement, masonry, structural steel,fireproofing and roof installation. This generally alleviates the need and expense of employing more than one inspector on a particular project. CONSTRUCTION TECHNOLOGY currently has the capabilities to provide inspection and testing services relating to many construction concerns including but not limited to: subsurface drilling and investigation, soils placement and compaction, foundation design recommendations,portland cement concrete, unit masonry,mortars, grouts,bituminous concrete, structural steel and fireproofing, as well as all associated laboratory services. In general, all forms of materials testing and inspection services, as they relate to the construction industry, may be obtained through CONSTRUCTION TECHNOLOGY. We appreciate your interest in our firm and our line of work. We look forward to completing the construction materials inspection, testing and laboratory requirements for: GROSS ELECTRIC,INC. If there are any questions, or when we may be of assistance,please contact this office immediately. Respectfully, CONSTRUCTION TECHNOLOGY / /2/.8.eliaur Robert Behan, (NICET) Manager Technical Services VIEWED FOR ENERGY CODE COMPLIANCE AfiCOMcheck Software Version 4.1.5.0 l Envelope Compliance Certificate Project Information C E I W ` p La Energy Code: 2018 IECC i ISV 7 O Project Title: New Office Facility ="7 CO Location: Glens Falls, New York 1 p O N V Climate Zone: 6a TOWN OF QUEENSBI 00 Project Type: New Construction j I yp BUILDING&CODE,, � 0�0 �+ Vertical Glazing/Wall Area: 19% 01 n O. O • Q) 0 lr Construction Site: Owner/Agent: Designer/Contractor: CA 6111.2 407 Big Bay Road Joseph Gross Ethan P. Hall lC n Queensbury, NY 12804 JP Gross Properties Rucinski Hall Architecture C. fn 27 Silver Circle 134 Dix Ave ' 0 Queensbury, NY 12804 Glens Falls, NY 12801 0 e 518-361-0607 518-741-0274 c O jgross@grosselectricinc.com ephall@nycap.rr.com tp CA al Additional'Effiiciency Package(s) i CsN O Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. O N tri Building Area Floor Area ."' 1-Office: Nonresidential 16000 F ICOPYj Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factono Perimeter Roof 1:Metal Building,Standing Seam,Filled Cavity with Thermal 16000 38.0 0.0 0.037 0.031 Blocks(d),[Bldg.Use 1 -Office] Floor 1:Slab-On-Grade:Unheated,Vertical 4 ft.,[Bldg.Use 1 - 560 -- 15.0 0.450 0.540 Office](c) NORTH Exterior Wall 1:Metal Building Wall,Single Layer Mineral Fiber(in 3000 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Office] Window 1:Metal Frame with Thermal Break:Fixed,Pert.Specs.: 152 — -- 0.320 0.360 Product ID product label,SHGC 0.33,[Bldg.Use 1 -Office](b) Door 5:Insulated Metal,Swinging,[Bldg.Use 1 -Office] 21 -- -- 0.300 0.370 EAST Exterior Wall 3:Metal Building Wall,Single Layer Mineral Fiber(in 1374 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Office] Window 3:Metal Frame with Thermal Break:Fixed,Pert.Specs.: 304 — -- 0.320 0.360 Product ID product label,SHGC 0.33,[Bldg.Use 1 -Office](b) Door 3:Insulated Metal,Swinging,[Bldg.Use 1 -Office] 80 -- -- 0.320 0.370 SOUTH Exterior Wall 2:Metal Building Wall,Single Layer Mineral Fiber(in 3867 30.0 0.0 0.052 0.052 cavity,thermal block at girt),[Bldg.Use 1 -Office] Window 2:Metal Frame with Thermal Break:Fixed,Pert.Specs.: 1296 — -- 0.320 0.360 Product ID product label,SHGC 0.33,[Bldg.Use 1 -Office](b) Door 1:Insulated Metal,Swinging,[Bldg.Use 1-Office] 49 — — 0.320 0.370 Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 1 of 22 ' I I . Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factor(a) Perimeter- Door 2:Insulated Metal,Swinging,[Bldg.Use 1-Office] 21 — -- 0.300 0.370 WEST Exterior Wall 4:.Metal Building Wall,Single Layer Mineral Fiber(in 1374 30.0 0.0 0.052 0.052 cavity;thermal block at girt),[Bldg.Use 1,Office]Window 4:Metal Frame with Thermal Break:Fixed,Perf.Specs.: 96 — -- 0.320 0.360 Product ID product label,SHGC 0.33,[Bldg.Use 1 -Office](b) Door 4:Insulated INetaf,Swinging',[Bldg.Use,1-Office] 21 — -- 0.300 0.370 (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product performance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget U-factors shown in table are F-factors. (d)Thermal spacer block with minimum R-3.5 must be installed above the purlin/batt,and the roof deck secured to the purlins. Envelope PASSES: Design 2% better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 2018 IECC requirements in COMcheck'.Versi 4.1. .nd t• 'om• with any applicable mandatory requirements listed in the Inspection Checklist. ,v✓� ) , � :��; . � Ethan P.Hall-Architect ! ,..,0%.:- ti' ;:-.e�' � Name-Title Signatu �:(4?" �; -t,'\.� Date (';‘;7:: 13( ci.:L:ti''''',1 :,(,, tea. tz -7 q� -,; -p� �w d� g, •i Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 2 of 22 COMcheck Software Version 4.1.5.0 Interior Lighting Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: New Office Facility Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 407 Big Bay Road Joseph Gross Ethan P.Hall Queensbury, NY 12804 JP Gross Properties Rucinski Hall Architecture 27 Silver Circle 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 518-361-0607 518-741-0274 jgross@grosselectricinc.com ephall@nycap.rr.com Additional Efficiency Package(s) Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Allowed Interior Lighting Power A B • C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Common Space Types:Office-Open Plan 8487 0.73 6196 2-Common Space Types:Office-Enclosed 7513 0.84 6311 Total Allowed Watts= 12506 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Common Space Types:Office-Open Plan LED 1:LED PAR 20W: 4 24 64 1536 2-Common Space Types:Office-Enclosed LED 2:LED Linear 17W: 1 70 34 2380 LED 3:LED PAR 20W: 4 6 64 384 LED 4:LED A Lamp 13W: 1 9 34 306 Total Proposed Watts= 4606 Interior Lighting PASSES: Design 63% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit,application.The proposed interior lighting systems have been designed to meet the 2018 IECC requirements in COMcheckVersio,f:115'0 i + comply with any applicable mandatory requirements listed in the Inspection Checklist. Ethan P. Hall-Architect -'a.w • ., .y (/w g/!i�__ Name-Title Signe Vie` g;' < `: Date zi is��`� Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 3 of 22 COMcheck Software Version 4.1.5.0 • Exterior Lighting Compliance Certificate IA Project Information Energy Code: 2018 IECC Project Title: New Office Facility . Project Type: New Construction Exterior Lighting Zone 2(Light industrial area with limited nighttime use) Construction Site: Owner/Agent: Designer/Contractor: 407 Big Bay Road Joseph Gross Ethan P. Hall Queensbury, NY 12804 JP Gross Properties Rucinski Hall Architecture 27 Silver Circle 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 518-361-0607 518-741-0274 jgross@grosselectricinc.com ephall@nycap.rr.com Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) Entry canopy 2 ft2 0.25 Yes 0 Total Tradable Watts(a)= 0 Total Allowed Watts= 0 Total Allowed Supplemental Watts(b)= 400 (a)Wattage tradeoffs are only allowed between tradable areas/surfaces. (b)A supplemental allowance equal to 400 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Entry canopy(2 ft2):Tradable Wattage LED 1:LED A Lamp 13W: 1 3 34 102 Total Tradable Proposed Watts= 102 Exterior Lighting PASSES: Design 75% better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2018 IECC requirements in COMcheck Ve sion 4.1.5.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. y,/ Ethan P.Hall-Architect Ce6 Z02/ °' Name-Title Sign e Date Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 4 of 22 • COMcheck Software Version 4.1.5.0 V(1 Mechanical Compliance Certificate Project Information Energy Code: 2018 IECC Project Title: New Office Facility Location: . Glens Falls,New York Climate Zone: 6a Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 407 Big Bay Road Joseph Gross Ethan P. Hall Queensbury, NY 12804 JP Gross Properties Rucinski Hall Architecture 27 Silver Circle 134 Dix Ave Queensbury, NY 12804 Glens Falls, NY 12801 518-361-0607 518-741-0274 jgross@grosselectricinc.com ephall@nycap.rr.com Additional Efficiency Package(s) Reduced interior lighting power.Requirements are implicitly enforced within interior lighting allowance calculations. Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 (Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=65 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=40 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1—Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Single-Zone VAV,1500 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade 1 HVAC System 2(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=65 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=40 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1—Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Single-Zone VAV, 1500 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade 1 HVAC System 3(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=65 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=40 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1 —Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Single-Zone VAV,1500 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade 1 HVAC System 4(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=65 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency: 80.00%Et or 80%AFUE Cooling:1 each-Field-Assembled DX System,Capacity=40 kBtu/h,Air-Cooled Condenser,Air Economizer Proposed Efficiency=15.00 SEER,Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1—Compliance(Motor nameplate HP method):Passes Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 5 of 22 Quantity System Type&Description Fans: FAN 1 Supply,Single-Zone VAV,1500 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2018 IECC requirements in COMcheck Version 4.1.5.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. /� ►�►/ Ethan P. Hall-Architect ✓ CO Name-Title Sign e Date Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 6 of 22 COMcheck Software Version 4.1.5.0 .1 (1'..1 Inspection Checklist Energy Code: 2018 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the"Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 ;Plans and/or specifications provide all DComplies Requirement will be met. [PR1]1 information with which compliance DDoes Not 'can be determined for the building ❑Not Observable Location on plans/spec:A-1 envelope and document where exceptions to the standard are ❑Not Applicable claimed. C103.2 Plans,specifications,and/or DComplies Requirement will be met. [PR2]1 calculations provide all information ❑Does Not with which compliance can be Location on plans/spec: M-1 determined for the mechanical systems and equipment and ❑Not Applicable document where exceptions to the standard are claimed. Load calculations per acceptable ;engineering standards and handbooks. C103.2 Plans, specifications,and/or ❑Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not !with which compliance can be Location on plans/spec: E-1 determined for the interior lighting :and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information 'provided should include interior ;lighting power calculations,wattage of ;bulbs and ballasts,transformers and control devices. C103.2 Plans,specifications,and/or DComplies Requirement will be met. [PR8]1 calculations provide all information ❑Does Not with which compliance can be ['Not Observable Location on plans/spec: E-1 determined for the exterior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed.Information provided should include exterior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. C402.4.1 The vertical fenestration area <= 30 DComplies Requirement will be met. [PR10]1 percent of the gross above-grade wall ❑Does Not area. Location on plans/spec:A-1 EJNot Observable ❑Not Applicable C402.4.1 The skylight area <=3 percent of the DComplies Requirement will be met. [PR11]1 gross roof area. - ❑Does Not ❑Not Observable Location on plans/spec:A-1 ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 7 of 22 Section # Plan Review Complies? Comments/Assumptions & Req.ID C406 Plans,specifications,and/or ❑Complies Requirement will be met. [PR9]1 calculations provide all information ❑Does Not with which compliance can be ❑Not Observable Location on plans/spec:A-1 determined for the additional energy efficiency package options. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 8 of 22 . Section # Footing/Foundation Inspection Complies? Comments/Assumptions & Req.ID C303.2 ESlab edge insulation installed per ❑Complies Requirement will be met. [FO4]z (manufacturer's instructions. ❑Does Not E ❑Not Observable Location on plans/spec:A-1 ❑Not Applicable C303.2.1 Exterior insulation protected against ❑Complies Requirement will be met. [FO6]1 damage,sunlight, moisture,wind, ❑Does Not landscaping and equipment maintenance activities. ❑Not Observable ❑Not Applicable C105 Installed slab-on-grade insulation type ❑Complies See the Envelope Assemblies table for values. [FO3]2 and R-value consistent with insulation ❑Does Not {specifications reported in plans and ❑Not Observable {COMcheck reports.{ ❑Not Applicable C402.2.4 Slab edge insulation depth/length. ❑Complies Exception: Requirement does not apply. [FO7]2 Slab insulation extending away from ❑Does Not building is covered by pavement or See the Envelope Assemblies table for values. >= 10 inches of soil. ❑Not Observable f ❑Not Applicable C402.2.6 {Radiant heating systems panels ❑Complies Exception: Requirement does not apply. [FO12]3 !insulated to>=R-3.5 on face opposite ❑Does Not space being heated. See the Envelope Assemblies table for values. ONot Observable ❑Not Applicable C403.12.2 Snow/ice melting system and freeze ❑Complies Exception: Requirement does not apply. protection systems have sensors and ❑Does Not C403.12.3;controls configured to limit service for ❑Not Observable [FO9]3 ;pavement temperature and outdoor itemperature.future connection to ❑Not Applicable ;controls. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 9 of 22 Section # Framing/Rough-In Inspection Complies? Comments/Assumptions & Req.ID C303.1.3 I Fenestration products rated in ❑Complies Requirement will be met. [FR12]z accordance with NFRC. ODoes Not ❑Not Observable Location on plans/spec:A-1 ENot Applicable C303.1.3 !Fenestration products are certified as ❑Complies Requirement will be met. [FR13]1 'to performance labels or certificates ODoes Not provided. Location on plans/spec:A-1 ❑Not Observable ENot Applicable C402.4.3 Vertical fenestration SHGC value. OComplies See the Envelope Assemblies table for values. [FR10]1 ODoes Not ❑Not Observable ❑Not Applicable C402.4.3, Vertical fenestration U-Factor. ❑Complies See the Envelope Assemblies table for values. C402.4.3. ODoes Not 4 1 ['Not Observable [FR8] ❑Not Applicable C402.4.4 U-factor of opaque doors associated ❑Complies See the Envelope Assemblies table for values. [FR14]z with the building thermal envelope ❑Does Not meets requirements. ❑Not Observable ONot Applicable C402.5.7 Vestibules are installed on all building ❑Complies Requirement will be met. [FR17]3 ientrances. Doors have self-closing ODoes Not devices. Location on plans/spec:A-1 [Not Observable ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 10 of 22 . Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Req.ID C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ElDoes Not C404.5.2 requirements. Refer to section details. [Not Observable [PL6]3 ❑Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. Not Observable [PL6]3 ENot Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 ,requirements. Refer to section details. Not Observable [PL6]3 :Not Applicable C404.5, Heated water supply piping conforms ❑Complies Exception: Requirement does not apply. C404.5.1, to pipe length and volume ❑Does Not C404.5.2 requirements. Refer to section details. Not Observable [PL6]3 ❑Not Applicable C404.6.3 •Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <=5 minutes after end of heating :Not Observable cycle. ❑Not Applicable C404.6.3 ;Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 ;heater and storage tank have controls ❑Does Not ;that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable j cycle. ENot Applicable C404.6.3 'Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 heater and storage tank have controls ❑Does Not that limit operation from startup to <= 5 minutes after end of heating ❑Not Observable cycle. ❑Not Applicable C404.6.3 !Pumps that circulate water between a ❑Complies Exception: Requirement does not apply. [PL7]3 }heater and storage tank have controls ❑Does Not 'that limit operation from startup to <=5 minutes after end of heating ['Not Observable cycle. ❑Not Applicable C404.7 }Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 I have controls that start the pump EDoes Not upon receiving a signal from the !action of a user of a fixture or ❑Not Observable appliance and limits the temperature ENot Applicable }of the water entering the cold-water piping to 104°F. C404.7 Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 have controls that start the pump ODoes Not upon receiving a signal from the action of a user of a fixture or ❑Not Observable appliance and limits the temperature ENot Applicable of the water entering the cold-water piping to 104°F. C404.7 ;Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 ;have controls that start the pump ❑Does Not upon receiving a signal from the action of a user of a fixture or ❑Not Observable appliance and limits the temperature ENot Applicable of the water entering the cold-water !piping to 104°F. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 11 of 22 Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Req.ID C404.7 Demand recirculation water systems ❑Complies Exception: Requirement does not apply. [PL8]3 have controls that start the pump ODoes Not upon receiving a signal from the action of a user of a fixture or ONot Observable appliance and limits the temperature ❑Not Applicable of the water entering the cold-water piping to 104°F. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay,Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 12 of 22 Section Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C402.2.6 Thermally ineffective panel surfaces of❑Complies Exception: Requirement does not apply. [ME41]3 sensible heating panels have ❑Does Not insulation >= R-3.5. ENot Observable ENot Applicable C402.5.5, Stair and elevator shaft vents have ❑Complies Exception: Requirement does not apply. C403.2.4. motorized dampers that automatically ❑Does Not 3 close. Refernece section C403.7.7 for [ME3]3 operational details. ENot Observable ENot Applicable C403.11.3 1 HVAC piping insulation insulated in ❑Complies Requirement will be met. [ME61]2 accordance with Table C403.11.3. ❑Does Not Insulation exposed to weather is ❑Not Observable Location on plans/spec: M-1 !protected from damage and is ❑Not Applicable I provided with shielding from solar pp ;radiation. C403.11.3I HVAC piping insulation insulated in ❑Complies Requirement will be met. [ME61]2 accordance with Table C403.11.3. ❑Does Not Insulation exposed to weather is ❑Not Observable Location on plans/spec: M-1 protected from damage and is provided with shielding from solar ONot Applicable radiation. C403.11.31 HVAC piping insulation insulated in ❑Complies Requirement will be met. [ME61]2 ;accordance with Table C403.11.3. ❑Does Not ;Insulation exposed to weather is ONot Observable Location on plans/spec: M-1 f protected from damage and is ;provided with shielding from solar ONot Applicable !radiation. C403.11.3(HVAC piping insulation insulated in ❑Complies Requirement will be met. [ME61]2 f accordance with Table C403.11.3. ❑Does Not I Insulation exposed to weather is :Not Observable Location on plans/spec: M-1 'protected from damage and is provided with shielding from solar ONot Applicable radiation. C403.8.4 {Motors for fans that are not less than ❑Complies Requirement will be met. [ME142]2 ;1/12 hp and less than 1 hp are ❑Does Not E electronically commutated motors or ❑Not Observable Location on plans/spec: M-1 have a minimum motor efficiency of 70 percent.These motors have the ❑Not Applicable means to adjust motor speed. C403.8.4 'Motors for fans that are not less than ❑Complies Requirement will be met. [ME142]2 1/12 hp and less than 1 hp are ❑Does Not electronically commutated motors or Location on plans/spec: M-1 have a minimum motor efficiency of ONot Observable 70 percent.These motors have the ❑Not Applicable means to adjust motor speed. C403.8.4 ;Motors for fans that are not less than ❑Complies Requirement will be met. [ME142]2 ;1/12 hp and less than 1 hp are ODoes Not electronically commutated motors or Location on plans/spec: M-1 have a minimum motor efficiency of ONot Observable 70 percent.These motors have the ONot Applicable means to adjust motor speed. C403.8.4 :Motors for fans that are not less than ❑Complies Requirement will be met. [ME142]2 ;1/12 hp and less than 1 hp are ❑Does Not i electronically commutated motors or Location on plans/spec: M-1 {have a minimum motor efficiency of ['Not Observable I70 percent.These motors have the ❑Not Applicable t means to adjust motor speed. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 13 of 22 Section # Mechanical Rough-In Inspection Complies? - Comments/Assumptions & Req.ID C403.8.5 ;Each DX cooling system> 65 kBtu ❑Complies Requirement will be met. [ME143]2 land chiller water/evaporative cooling ❑Does Not {system with fans> 1/4 hp are :Not Observable Location on plans/spec: M-1 }designed to vary the indoor fan airflow as a function of load and comply with ❑Not Applicable detailed requirements of this section. C403.8.5 ;Each DX cooling system > 65 kBtu Complies Requirement will be met. [ME143]2 land chiller water/evaporative cooling ❑Does Not system with fans> 1/4 hp are DNot Observable Location on plans/spec: M-1 ;designed to vary the indoor fan airflow l as a function of load and comply with DNot Applicable ;detailed requirements of this section. C403.8.5 'Each DX cooling system > 65 kBtu DComplies Requirement will be met. [ME143]2 ;and chiller water/evaporative cooling ❑Does Not 'system with fans> 1/4 hp are :Not Observable Location on plans/spec: M-1 designed to vary the indoor fan airflow as a function of load and comply with ❑Not Applicable {detailed requirements of this section. C403.8.5 ;Each DX cooling system>65 kBtu ❑Complies Requirement will be met. [ME143]2 and chiller water/evaporative cooling ❑Does Not ;system with fans> 1/4 hp are Location on plans/spec: M-1 designed to vary the indoor fan airflow DNot Observable {as a function of load and comply with DNot Applicable {detailed requirements of this section. C403.12.1;Systems that heat outside the building ❑Complies Exception: Requirement does not apply. [ME71]2 'envelope are radiant heat systems ❑Does Not controlled by an occupancy sensing device or timer switch. DNot Observable ❑Not Applicable C403.2.3 {HVAC equipment efficiency verified. ❑Complies See the Mechanical Systems list for values. [ME55]2 { ❑Does Not :Not Observable DNot Applicable C403.2.2 Natural or mechanical ventilation is ❑Complies Requirement will be met. [ME59]1 provided in accordance with ❑Does Not International Mechanical Code ❑Not Observable Location on plans/spec: M-1 Chapter 4. Mechanical ventilation has capability to reduce outdoor air supply ENot Applicable to minimum per IMC Chapter 4. C403.7.1 Demand control ventilation provided ❑Complies Requirement will be met. [ME59]1 for spaces>500 ft2 and >25 ❑Does Not people/1000 ft2 occupant density and ['Not Observable Location on plans/spec: M-1 served by systems with air side economizer, auto modulating outside DNot Applicable air damper control, or design airflow >3,000 cfm. C403.7.2 Enclosed parking garage ventilation ❑Complies Exception: Requirement does not apply. [ME115]3 has automatic contaminant detection ❑Does Not and capacity to stage or modulate fans to 50%or less of design capacity. [Not Observable ❑Not Applicable C403.7.6 HVAC systems serving guestrooms in ❑Complies Exception: Requirement does not apply. [ME141]3 Group R-1 buildings with >50 ❑Does Not guestrooms: Each guestroom is provided with controls that ❑Not Observable automatically manage temperature ONot Applicable setpoint and ventilation(see sections C403.7.6.1 and C403.7.6.2). i C403.7.4 Exhaust air energy recovery on ❑Complies Requirement will be met. [ME57]1 systems meeting Table C403.7.4(1) EDoes Not and C403.7.4(2). ENot Observable ENot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 14 of 22 Section Mechanical Rough-In Inspection Complies? Comments/Assumptions & Req.ID C403.7.5 Kitchen exhaust systems comply with ❑Complies Exception: Requirement does not apply. [ME116]3 1 replacement air and conditioned ❑Does Not supply air limitations, and satisfy hood rating requirements and maximum ❑Not Observable exhaust rate criteria. ❑Not Applicable C403.11.1;HVAC ducts and plenums insulated in ❑Complies Exception: Requirement does not apply. (accordance with C403.11.1 and ❑Does Not C403.11.2,constructed in accordance with [ME60]2 I C403.11.2,verification may need to [Not Observable {occur during Foundation Inspection. ❑Not Applicable C403.4.1. 'Heating for vestibules and air curtains ❑Complies Requirement will be met. 4 with integral heating include ❑Does Not [ME63]2 l automatic controls that shut off the ❑Not Observable Location on plans/spec: M-1 I heating system when outdoor air I temperatures>45F.Vestibule ❑Not Applicable heating and cooling systems controlled by a thermostat in the vestibule with heating setpoint<= ;60F and cooling setpoint>= 80F. C403.3.3 ;Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. [ME35]1 I kBtu/h-50%>240 kBtu/h-25% ❑Does Not ['Not Observable Location on plans/spec: M-1 ONot Applicable C403.3.3 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% ❑Does Not ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C403.3.3 Hot gas bypass limited to: <=240 DComplies Requirement will be met. [ME35]1 kBtu/h-50%>240 kBtu/h-25% DDoes Not ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C403.3.3 Hot gas bypass limited to: <=240 ❑Complies Requirement will be met. [ME35)1 kBtu/h-50%>240 kBtu/h-25% ElDoes Not ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C408.2.2. Air outlets and zone terminal devices ❑Complies Requirement will be met. 1 have means for air balancing. ❑Does Not [ME53]3 I [Not Observable ❑Not Applicable C403.5, ;Refrigerated display cases,walk-in ❑Complies Exception: Requirement does not apply. C403.5.1, /coolers or walk-in freezers served by ODoes Not C403.5.2 remote compressors and remote [ME123]3 condensers not located in a ❑Not Observable condensing unit, have fan-powered ❑Not Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 15 of 22 Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.2. Spaces required to have light- DComplies Requirement will be met. 2 reduction controls have a manual ❑Does Not [EL22]1 control that allows the occupant to :Not Observable Location on plans/spec: E-1 reduce the connected lighting load in la reasonably uniform illumination ❑Not Applicable pattern >= 50 percent. C405.2.1, Occupancy sensors installed in ❑Complies Requirement will be met. C405.2.1. classrooms/lecture/training rooms, ❑Does Not 1 1 conference/meeting/multipurpose Location on plans/spec: E-1 [EL18] rooms, copy/print rooms, lounges/breakrooms,enclosed offices, ONot Applicable open plan office areas, restrooms, storage rooms, locker rooms, warehouse storage areas,and other spaces<=300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. C405.2.1. Occupancy sensors control function in DComplies Exception: Requirement does not apply. 2 warehouses: In warehouses,the ❑Does Not [EL19]1 lighting in aisleways and open areas is controlled with occupant sensors that ❑Not Observable automatically reduce lighting power DNot Applicable by 50%or more when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. C405.2.1. Occupant sensor control function in DComplies Requirement will be met. 3 open plan office areas:Occupant ODoes Not [EL20]1 sensor controls in open office spaces Location on plans/spec: E-1 >=300 sq.ft. have controls 1) ❑Not Applicable e configured so that general lighting can PP be controlled separately in control zones with floor areas<=600 sq.ft. within the space, 2)automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space,3)are configured so that general lighting power in each control zone is reduced by>=80%of the full zone general lighting power within 20 minutes of all occupants leaving that control zone, and 4)are configured such that any daylight responsive control will activate space general lighting or control zone general lighting only when occupancy for the same area is detected. C405.2.2, ;Each area not served by occupancy DComplies Requirement will be met. C405.2.2. I sensors(per C405.2.1) have time- ❑Does Not 1, switch controls and functions detailed Location on plans/spec: E-1 C405.2.2. ;in sections C405.2.2.1 and C405.2.2.2. ❑Not Applicable e 2 I pP [EL21]2 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 16 of 22 • Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.3, 'Daylight zones provided with ❑Complies Requirement will be met. C405.2.3. individual controls that control the ['Does Not 1, ;lights independent of general area ['Not Observable Location on plans/spec: E-1 C405.2.3. :lighting.See code section C405.2.3 2 ;Daylight-responsive controls for ❑Not Applicable [EL23]2 ;applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone. C405.2.4 ;Separate lighting control devices for ❑Complies Requirement will be met. [EL26]1 specific uses installed per approved ❑Does Not ;lighting plans. Location on plans/spec: E-1 ❑Not Observable ❑Not Applicable C405.2.4 !Additional interior lighting power ❑Complies Requirement will be met. [EL27]1 'allowed for special functions per the DDoes Not approved lighting plans and is ❑Not Observable Location on plans/spec: E-1 automatically controlled and separated from general lighting. ['Not Applicable C405.2.5 Automatic lighting controls for exterior DComplies Requirement will be met. [EL28]no° lighting installed.Controls will be ['Does Not daylight controlled,set based on Location on plans/spec: E-1 business operation time-of-day, or ['Not Observable reduce connected lighting >30%. ❑Not Applicable C405.3 :Exit signs do not exceed 5 watts per ❑Complies Requirement will be met. [EL6]1 iface. ❑Does Not ❑Not Observable Location on plans/spec: E-1 ❑Not Applicable C405.6 ;Low-voltage dry-type distribution ❑Complies Requirement will be met. [EL26]2 :electric transformers meet the ['Does Not I minimum efficiency requirements of ❑Not Observable Location on plans/spec: E-1 'Table C405.6. ['Not Applicable C405.7 ;Electric motors meet the minimum ❑Complies Requirement will be met. [EL27]2 ;efficiency requirements of Tables ❑Does Not I C405.7(1)through C405.7(4). Location on plans/spec: E-1 Efficiency verified through certification ❑Not Observable ;under an approved certification Observable,__, Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.8.2, ;Escalators and moving walks comply ['Complies Exception: Requirement does not apply. C405.8.2. ;with ASME A17.1/CSA B44 and have ❑Does Not 1 ;automatic controls configured to [EL28]2 I reduce speed to the minimum ENot Observable ;permitted speed in accordance with ❑Not Applicable I ASME A17.1/CSA B44 or applicable {local code when not conveying j passengers. C405.9 ;Total voltage drop across the ['Complies Requirement will be met. [EL29]2 ;combination of feeders and branch ❑Does Not circuits <=5%. Location on plans/spec: E-1 ['Not Observable ['Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 17 of 22 Section # Insulation Inspection Complies? Comments/Assumptions & Req.ID C303.1 Roof insulation installed per ❑Complies Requirement will be met. [IN3]1 manufacturer's instructions. Blown or ❑Does Not poured loose-fill insulation is installed ❑Not Observable Location on plans/spec:A-1 only where the roof slope is<=3 in 12. ❑Not Applicable C402.2.1 Insulation installed on a suspended ❑Complies Exception: Requirement does not apply. [IN20]1 ceiling having ceiling tiles is not being ❑Does Not specified for roor/ceiling assemblies. Continuous insulation board installed ❑Not Observable in 2 or more layers with edge joints ENot Applicable offset between layers. C303.1 ;Building envelope insulation is labeled ❑Complies Requirement will be met. [IN10]Z jwith R-value or insulation certificate ❑Does Not {,providing R-value and other relevant data. ❑Not Observable ❑Not Applicable C303.2 Above-grade wall insulation installed ❑Complies Requirement will be met. [IN7]1 per manufacturer's instructions. ❑Does Not [Not Observable Location on plans/spec:A-1 ENot Applicable C303.2.1 ;Exterior insulation is protected from EComplies Exception: Requirement does not apply. [IN14]2 damage with a protective material. ❑Does Not Verification for exposed foundation ❑Not Observable insulation may need to occur during I Foundation Inspection. ❑Not Applicable C105 Installed above-grade wall insulation ❑Complies See the Envelope Assemblies table for values. [IN6]1 type and R-value consistent with ❑Does Not insulation specifications reported in plans and COMcheck reports. ENot Observable ENot Applicable C402.2.3 f Installed floor insulation type and R- Complies See the Envelope Assemblies table for values. [IN8]z value consistent with insulation DDoes Not lspecifications reported in plans and ICOMcheck reports. ❑Not Observable ❑Not Applicable C402.2.6 ;Radiant panels and associated ❑Complies Exception: Requirement does not apply. [IN18]3 :components, designed for heat ❑Does Not {transfer from the panel surfaces to the occupants or indoor space are [Not Observable insulated with a minimum of R-3.5. ❑Not Applicable C105 Installed roof insulation type and R- ❑Complies See the Envelope Assemblies table for values. [IN2]1 value consistent with insulation ❑Does Not specifications reported in plans and COMcheck reports. For some ceiling [Not Observable systems,verification may need to ENot Applicable occur during Framing Inspection. C402.5.1. All sources of air leakage in the ❑Complies Requirement will be met. 1 building thermal envelope are sealed, ❑Does Not [IN1]1 caulked,gasketed,weather stripped ❑Not Observable Location on plans/spec:A-1 or wrapped with moisture vapor- permeable wrapping material to ENot Applicable minimize air leakage. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 18 of 22 • Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M instructions for DComplies Requirement will be met. C408.2.5. systems and equipment to the ODoes Not 2 building owner or designated Not Observable [FI17]3 representative. ❑ ❑Not Applicable C303.3, ,Furnished O&M manuals for HVAC DComplies Requirement will be met. C408.2.5. systems within 90 days of system ODoes Not 3 ;acceptance. [F18]3 ❑Not Observable ONot Applicable C402.5 ;Building envelope contains a DComplies Requirement will be met. [FI55]1 I continuous air barrier that has been ODoes Not ;tested and deemed to limit air leakage DNot Observable Location on plans/spec:A-1 <=0.40 cfm/ft2. ONot Applicable C402.5.6 ;Weatherseals installed on all loading DComplies Exception: Requirement does not apply. [FI37]1 :dock cargo door openings and provide ODoes Not direct contact along the top and sides of vehicles parked in the doorway. ONot Observable DNot Applicable C402.5.6 Weatherseals installed on all loading ❑Complies Exception: Requirement does not apply. [FI37]' dock cargo door openings and provide ODoes Not direct contact along the top and sides of vehicles parked in the doorway. [Not Observable ONot Applicable C402.5.6 •Weatherseals installed on all loading DComplies Exception: Requirement does not apply. [F137]1 dock cargo door openings and provide ODoes Not direct contact along the top and sides of vehicles parked in the doorway. ONot Observable ONot Applicable C402.5.6 Weatherseals installed on all loading DComplies Exception: Requirement does not apply. [FI37]1 dock cargo door openings and provide ❑Does Not direct contact along the top and sides of vehicles parked in the doorway. DNot Observable DNot Applicable C403.2.2 HVAC systems and equipment DComplies Requirement will be met. [FI27]3 capacity does not exceed calculated ODoes Not loads. Location on plans/spec: M-1 DNot Observable :Not Applicable C403.2.4. 'Heating and cooling to each zone is DComplies Requirement will be met. 1 controlled by a thermostat control. ❑Does Not [FI47]3 ;Minimum one humidity control device ❑Not Observable Location on plans/spec: M-1 per installed humidification/dehumidification ONot Applicable system. C403.2.4. Heating and cooling to each zone is DComplies Requirement will be met. 1 !controlled by a thermostat control. ❑Does Not [FI47]3 'Minimum one humidity control device ONot Observable Location on plans/spec: M-1 per installed humidification/dehumidification ONot Applicable system. C403.2.4. `Heating and cooling to each zone is DComplies Requirement will be met. 1 controlled by a thermostat control. ElDoes Not [FI47]3 Minimum one humidity control device ['Not Observable Location on plans/spec: M-1 per installed humidification/dehumidification ENot Applicable ,system. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 19 of 22 Section # Final Inspection Complies? Comments/Assumptions Si Req.ID C403.2.4. Heating and cooling to each zone is ❑Complies Requirement will be met. 1 controlled by a thermostat control. DDoes Not [FI47]3 Minimum one humidity control device ['Not Observable Location on plans/spec: M-1 per installed humidification/dehumidification ❑Not Applicable system. C403.4.1. ;Thermostatic controls have a 5 °F ❑Complies Requirement will be met. 2 Ideadband. ❑Does Not [FI38]3 Location on plans/spec: M-1 4 ONot Observable ❑Not Applicable C403.2.4. ;Temperature controls have setpoint ❑Complies Requirement will be met. 1.3 !overlap restrictions. DDoes Not [F120]3 Location on plans/spec: M-1 ONot Observable ONot Applicable C403.2.4. Each zone equipped with setback ❑Complies Requirement will be met. 2 controls using automatic time clock or DDoes Not [FI39]3 programmable control system. ❑Not Observable Location on plans/spec: M-1 ❑Not Applicable C403.2.4. ;Automatic Controls:Setback to 55°F ❑Complies Requirement will be met. 2.1, (heat)and 85°F(cool); 7-day clock,2- DDoes Not C403.2.4. hour occupant override, 10-hour ONot Observable Location on plans/spec: M-1 2.2[FI40]3 backup ONot Applicable 1 C403.2.4. Systems include optimum start ❑Complies Requirement will be met. 2.3 ,controls. ❑Does Not [FI41]3 i Location on plans/spec: M-1 ENot Observable ENot Applicable C403.2.4. ;Systems include optimum start ❑Complies Requirement will be met. 2.3 !controls. DDoes Not [FI41]3 ; Location on plans/spec: M-1 [Not Observable ONot Applicable C403.2.4. ;Systems include optimum start ❑Complies Requirement will be met. 2.3 i controls. DDoes Not [FI41]3 ; Location on plans/spec: M-1 ENot Observable ONot Applicable C403.2.4. ;Systems include optimum start ❑Complies Requirement will be met. 2.3 controls. DDoes Not [FI41]3 Location on plans/spec: M-1 ❑Not Observable ONot Applicable C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ODoes Not is shown on the approved lighting plans, demonstrating proposed watts ['Not Observable are less than or equal to allowed Observable_ Applicable watts. C405.5.1 Exterior lighting power is consistent EComplies See the Exterior Lighting fixture schedule for values. [FI19]1 with what is shown on the approved DDoes Not lighting plans, demonstrating proposed watts are less than or equal ['Not Observable to allowed watts. ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 20 of 22 • Section # Final Inspection Complies? Comments/Assumptions & Req.ID C408.1.1 Building operations and maintenance DComplies Requirement will be met. [FI57]1 documents will be provided to the ❑Does Not owner.Documents will cover manufacturers' information, ❑Not Observable specifications, programming ❑Not Applicable procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained,and operated. C408.2.1 Commissioning plan developed by DComplies Requirement will be met. [FI28]1 registered design professional or ❑Does Not approved agency. Location on plans/spec: M-1 ❑Not Observable ❑Not Applicable C408.2.3. HVAC equipment has been tested to DComplies Requirement will be met. 1 ensure proper operation. ❑Does Not [FI31]1 ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C408.2.3. 1 HVAC control systems have been DComplies Requirement will be met. 2 ;tested to ensure proper operation, ODoes Not [FI10]1 :calibration and adjustment of controls. ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C408.2.4 ;Preliminary commissioning report DComplies Requirement will be met. [FI29]1 'completed and certified by registered ❑Does Not design professional or approved ❑Not Observable Location on plans/spec: M-1 agency. ❑Not Applicable C408.2.5. ;Furnished HVAC as-built drawings DComplies Requirement will be met. 1 ;submitted within 90 days of system ❑Does Not [FI7]3 !acceptance. ❑Not Observable I pp i ❑Not Applicable C408.2.5. Furnished as-built drawings for DComplies Requirement will be met. 1 electric power systems within 90 days ❑Does Not [FI16]3 iof system acceptance. ['Not Observable ❑Not Applicable C408.2.5. An air and/or hydronic system DComplies Requirement will be met. 3 balancing report is provided for HVAC ❑Does Not [FI43]1 systems. ['Not Observable Location on plans/spec: M-1 ❑Not Applicable C408.2.5. Final commissioning report due to ❑Complies Requirement will be met. 4 building owner within 90 days of ElDoes Not [F130]1 receipt of certificate of occupancy. ❑Not Observable Location on plans/spec: M-1 ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI33]1 ensure proper calibration,adjustment, ❑Does Not programming, and operation. ❑Not Observable Location on plans/spec: E-1 ENot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 21 of 22 Project Title: New Office Facility Report date: 12/03/21 Data filename: Y:\Gross Electric\407 Big Bay Road\Const Dwg's\407 Big Bay Road-Brookfield Power.cck Page 22 of 22 • f• l The Pakatar Group LLC 120 Defreest Drive,Suite 100 PAKATAR GROUP.uc Troy,NY 12180 518-874-1604 Contract #:121821BRO Agreement to Perform Commercial Testing Services U to Gross Electric Inc. Date Services Performed By: Services Performed For: +—' December 18,2021 The Pakatar Group LLC Gross Electric Inc. 120 Defreest Drive,Suite 100 Ai Gordon O Troy,NY 12180 27 Silver Circle 518-874-1604 UQueensbury,NY 12804 We hereby submit specifications for: Perform air leakage services in accordance with ASTM E1827 to comply with local codes for testing the envelope of buildings on new Brookfield Power Control Center at 407 Big Bay Road,Queensbury, V) NY ® Provide certified report of findings during envelope testing aEnvelope area: 22,402 sqft O Target CFM: 8,960.8 0 rOKY Schedule for Completion of Work: APPROXIMATE STARTING DAI•h Date: Near rCERVErn1 Completion of Construction THE CONTRACTOR AND THE OWNER HAVE DETERMINED DE2O217 gij THATA DEFINIlb COMPLFTION DATE: TOWN OF QUEENSBURY ❑ IS OF TI-II?ESSENCE © IS NOT OF TI-IE ESSENCE BUILDING& CODES Proposal'Contract for Gross Eleclic Inc. •December 18,2021 1 r i - • We Propose hereby to furnish material and labor—complete in accordance with these specifications,for the sum of: Two thousand one hundred and 0/100 Dollars $2,100.00 Payment Schedule: Per terms of agreement All material irguaranteed to be as specified All work to be completed in a workmanlike manner according to standard practices. Ar9' Alteration or Deviation from above specifications involving extra costs or time allotted will be executed only upon written orders,and will become an extra chaise over and above the estimate. All agreements contingent upon stiker,accidents or delays beyond our control Refer to Additional Notices to Owner attached to this document IN WITNESS WHEREOF,the parties hereto have caused this Proposal/Contract to be effective as of the day, month and year first written above. Upon signing,this proposal becomes a binding contract authorizing the contractor to do the work as specified. Payment will be made as outlined above. Gross Electric Inc. The Pakatar Group LLC By: By: Name: Name: Alexander Pakatar Tide: Title: Vice President Proposal/Contract for Gross Electric Inc. 'December 18,2021 2 � • M NOTICES TO OWNER Right to Stop Work: If any payment under this agreement is not made when due,the contractor may svend work on the job until time all payments due have been made. Cancellation: The Owner has the unconditional right to cancel the contract without penally,or obligation until midnight of the third business day after be/she signs this contract. Cancellation must be done by giving the contractor written notice indicating the Owner's intention not to be bound. Notice of Cancellation shall be deemed given when deposited in a mailbox,propel!),addressed and postage prepaid Upon cancellation,any property traded in any pc0nients made under this contract,and any negotiable instrument executed by you will be returned within 10 business days following receipt by the Contractor of a Cancellation Notice. Any security interest arising out of this transaction will be cancelled Proposal/Contract for Gross Electric Inc. •December 18,2021 3 Project: Brookfield Power Control Center Location: 407 Big Bay Rd. 4ueensbury, NY 12804 HVAC Document Index 1. Unit 1&2 Manual N, Open Office Area 2. Unit 3,4, 5&6 Manual N,Control Room 3. Unit 7&8 Manual N,Server Room 4. Unit 9 Manual N, Elec Room 5. Unit 10&11 Manual N,South Side of Bldg. & Meeting Room 6. Unit 12 Manual N, Cafeteria, Laundry, Corridor 1 7. Unit 13 Manual N, Men's,Women's,Conference,Copy, Huddle 1, Locker Rooms 8. Unit 14 Manual N,Workout Room 9. Elec Heater Manual N, Main Entrance Vestibule 10. Elec Heater Manual N,South Entrance Vestibule 11. Lifebreath Spec Sheet HRV 100-155MAX 12. Lifebreath Spec Sheet ERV 330 ERV 13. Samsung Spec Sheet -40 deg Split Heat Pump 14. York 96% Eff 2 Stage Gas Furnace 15. York 19 SEER 2 stage AC Cond Manual N,5th Edition,Abridged Version • Form NI ��a Project Name Brookfield,407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 �> 0100•"� Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 J9► Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 �/r\ Type of Load Zone Elevation 328 Latitude 43 Daily Range _ M ; Square Feet 6258 JAG Volume I 117579 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 488.0 24,917 33,474 b. • Windows Glass e Doors g h ► Lookup a b Skylights ►Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 1,098 2,681 544 b - c Above d Grade e Walls g h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 7,808 12,711 2,972 Ceilings c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 97 2,548 ►Lookup a Lighting Fixtures 6,205 b Occupants&Plants 9,450 9,750 Internal c Office Equipment 30,240 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 0.14 0.07 22,332 1,509 2,705 ► Lookup Supply Duct Load Return Duct Load ►Lookup Ventilation Loads CFM 600 48,840 6,600 11,832 ► Lookup Blower Heat(Equipment Load) 4,220 Total Loads 114,030 95,213 24,287 Manual N,5th Edition,Abridged Version • Form N1 :��a, _ Project Name Brookfield 407 Big Bay Rd,QBl,NY Heating Design 99%DB 4 Heating Design Space DB 70 Heating Temp.Difference 74 r ��.„- Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 M ,,,� �{� Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 ��FF f�rro a Type of Load Room Elevation 328 Latitude 43 Daily Range M _ .., Square Feet 248 lAG Volume I 2480 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day _ 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►To c ip a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Glass Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 g h� I.Lookup a b Skylights c d e ► Lookup a Wood&Metal b Doors c I. Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f g h Partition Walls p1 p2 I.Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 248 404 94 b Ceilings c I.Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 I.Lookup a Lighting Fixtures 563 b Occupants&Plants Internal c Office Equipment d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) I. Lookup , Infiltration 0.26 0.14 875 64 114 I. Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM I. Lookup Blower Heat(Equipment Load) 36 Total Loads 1,279 757 114 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 ACDesign City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Zone Elevation 328 Latitude 43 Daily Range M Square Feet 2320 IAG Volume I 39440 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 b lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 - 68.59 160.0 - 8,170 10,975 • c Store Front Glass Door,Metal No Break South 51.06 68.59 24.5 1,251 1,681 Windows d & Glass e Doors f 9 h ► Lookup a b Skylights o d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 969 2,366 480 b Steel Bldg Wall, R-30 Cavity,Metal Siding South 2.44 0.50 663 1,619 - 328 c Above d Grade e Walls f 9 h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 2,320 3,777 883 Ceilings b c P. Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 97 2,548 ► Lookup a Lighting Fixtures 1,904 b Occupants&Plants 3,024 3,120 Internal c Office Equipment 51,530 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) I. Lookup Infiltration 0.18 0.09 9,631 651 1,167 I. Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 3,573 Total Loads 29,362 75,029 4,287 { Manual N,5th Edition,Abridged Version • Form N1 r Project Name Brookfield,407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 p*r��p Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 A �f �k Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 lll Vim✓' Type of Load Room Elevation 328 Latitude 43 Daily Range M Square Feet 678.5 IAG Volume I 6785 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c Windows d & Glass e • Doors f 9 h ► Lookup a b Skylights d e ►Lookup a Wood&Metal b Doors c P.Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 280 684 139 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 • Above d Grade e Walls f 9 h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b c ►Lookup a b c — . Floors d e • f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 28 736 ►Lookup a Lighting Fixtures • 1,290 b Occupants&Plants Internal c Office Equipment 32,055 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) P.Lookup Infiltration 0.26 0.14 2,393 174 312 ►Lookup Supply Duct Load Return Duct Load ►Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) • 1,683 Total Loads 3,813 35,341 312 Manual N,5th Edition,Abridged Version • Form N1 Project Name _Brookfield,407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 +�.,y�� Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 AJ[ _LK Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 JJJ�����u��r/'� Type of Load Room Elevation 328 Latitude 43 Daily Range M ., Square Feet 678.5 lAG Volume I 6785 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent I.Lookup a lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 b lc-cuf-c Doublepane,fixed sash,Metal no break East 51.06 51.95 c Windows Glass e Doors g h ► Lookup a • Skylights e ► Lookup a Wood&Metal b Doors c • P. Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 210 513 104 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Above d Grade e Walls g h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b - O.Lookup a b c Floors d e _ f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 21 552 ►Lookup a Lighting Fixtures 491 b Occupants&Plants Internal c Office Equipment 21,100 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 2,393 174 312 • I.Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM I.Lookup Blower Heat(Equipment Load) 1,093 Total Loads 3,458 22,963 312 • Manual N,5th Edition,Abridged Version • Form N1 f•, Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 . Cooling Design Space DB 75 Cooling Temp.Difference 10 ~ ACCkDesign City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Huddle Room#6 Elevation 328 Latitude 43 Daily Range M ., . Square Feet 156 lAG Volume I 1560 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 46.0 2,349 3,155 • Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h P. Lookup a b Skylights d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 130 317 64 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b c ►Lookup a b c • Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 13 342 ► Lookup a Lighting Fixtures 532 b Occupants&Plants 784 496 Internal c Office Equipment 530 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 0.26 0.14 550 40 72 O. Lookup Supply Duct Load Return Duct Load ►Lookup Ventilation Loads CFM ►Lookup Blower Heat(Equipment Load) 255 Total Loads 3,558 5,361 568 t Manual N,5th Edition,Abridged Version • Form NI r- Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 j Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 ff� Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 //���77 Type of Load Room Huddle Room#5 Elevation 328 Latitude 43 Daily Range M Square Feet 156 lAG Volume I 1560 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Panel HTM Net Area Btuh Type of Exposure Construction Number&Description Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 52.0 2,655 3,567 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03& - Glass a 1c-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 - I Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 . 9 h ► Lookup a b Skylights o d e • I. Lookup a Wood&Metal b Doors c P.Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 130 317 64 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 I. Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b c I.Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 13 342 I.Lookup a Lighting Fixtures 532 b Occupants&Plants' 784 496 Internal c Office Equipment 530 d Food Service Equipment and Investigated Loads . e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 550 40 72 10. Lookup Supply Duct Load Return Duct Load ► oo cup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 276 Total Loads 3,864 5,794 568 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference _ 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 /1�7f Type of Load Room Huddle Room#4 Elevation 328 Latitude 43 Daily Range M - Square Feet 144 IAG Volume I 1440 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 48.0 2,451 3,293 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Glass Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ►Lookup a b Skylights c d e I. Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 120 293 59 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 • h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling — 1.63 0.38 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 13 342 ►Lookup a Lighting Fixtures 532 b Occupants&Plants 784 496 Internal c Office Equipment 530 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) P. Lookup Infiltration 0.26 0.14 508 37 66 ►Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 262 Total Loads 3,593 5,497 562 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 . Cooling Temp.Difference 10 ACCIKDesign City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Huddle Room#3 Elevation 328 Latitude 43 Daily Range M - Square Feet 144 lAG Volume I 1440 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Cig Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 48.0 2,451 3,293 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Glass Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 . h ►Lookup a b Skylights d e ►Lookup a • Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall, R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 120 293 59 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 . ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 • Ceilings b c ►Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 _ 13 342 ►Lookup a Lighting Fixtures 532 • b Occupants&Plants 784 496 Internal c Office Equipment 530 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) O. Lookup Infiltration 0.26 0.14 508 37 66 P. Lookup Supply Duct Load • Return Duct Load ► Lookup Ventilation Loads CFM ►Lookup Blower Heat(Equipment Load) 282 Total Loads 3,593 5,497 562 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 q� Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 A,[ Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 //►► 7er� ��rr�. Type of Load Room Huddle Room#2 Elevation 328 Latitude 43 Daily Range M Square Feet 180 lAG Volume I 1800 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break SW 51.06 83.80 32.0 1,634 2,682 _b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Glass Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ► Lookup a b Skylights d e ► Lookup a Wood&Metal b Doors c P. Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 120 293 24 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 13 342 ►Lookup a Lighting Fixtures 532 b Occupants&Plants 784 496 Internal c Office Equipment 530 d Food Service Equipment and Investigated Loads _e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 635 46 83 I.Lookup Supply Duct Load . Return Duct Load ► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 230 Total Loads 2,903 4,828 579 Manual N,5th Edition,Abridged Version •• Form N1 f"L- .,_ Project Name Brookfield,407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Ay�q "- Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 C C Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 . '�a+/ Type of Load Room Meeting Room Elevation 328 Latitude 43 Daily Range M Square Feet 1156 lAG Volume I 19652 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 96.0 4,902 6,585 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 176.0 8,987 9,142 Windows c & d Glass e Doors f 9 h ►Lookup a b Skylights o d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 408 996 202 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 748 1,827 469 c Above d Grade e Walls f 9 h Partition Walls P2 P P. Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 1,156 1,882 440 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 69 1,813 Lookup ' a Lighting Fixtures 3,133 b Occupants&Plants 11,813 12,188 Internal c Office Equipment 5,540 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► oo up I Infiltration 0.18 0.09 4,799 324 581 b.- Lookup Supply Duct Load Return Duct Load '► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 1,882 Total Loads 25,205 39,531 12,769 Manual N,5th Edition,Abridged Version • Form N1�� Project Name _Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Cafeteria Elevation 328 Latitude 43 Daily Range M Square Feet 878 lAG Volume I 3180 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 32.0 1,634 824 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 24.0 1,225 618 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 24.5 1,251 631 9 h ► Lookup a b Skylights d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 585 1,429 116 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e . Walls f 9 — h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 878 1,429 334 Ceilings b -- c ► Lookup a b c . Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 59 1,550 ► Lookup a Lighting Fixtures 1,925 b Occupants&Plants 3,600 2,880 Internal c Office Equipment — d Food Service Equipment and Investigated Loads 24,000 ' e Blower Heat(Building Load) I. Lookup Infiltration 0.26 0.14 1,122 82 146 0-Lookup Supply Duct Load -- - Return Duct Load ►Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 1,606 Total Loads 9,640 33,736 3,026 Manual N,5th Edition,Abridged Version • Form N1 � .e Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 _Heating Design Space DB 70 Heating Temp.Difference 74 �-4 ®' Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 lr�i Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 ., J�7��i�///���ee/��fff��\ Type of Load Room Corridor 1 Elevation 328 Latitude 43 Daily Range M Square Feet 318 lAG Volume I 3180 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 b lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 c Store Front Glass Door,Metal No Break West 51.06 69.03 24.5 1,251 1,691 Windows d & Glass e Doors f 9 h ►Lookup a b Skylights d e ►Lookup a Wood&Metal b Doors c '► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 60 147 30 b South c Above d Grade e Walls f 9 h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 318 518 121 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 6 158 O.Lookup a Lighting Fixtures 440 b Occupants&Plants Internal c Office Equipment d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 0.26 0.14 1,122 82 146 10.Lookup Supply Duct Load Return Duct Load P. Lookup Ventilation Loads CFM ►Lookup Blower Heat(Equipment Load) 118 Total Loads 3,195 2,482 146 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 ,�/'��I�+",� Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 l� _L _4� Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 „ Jr7��1�f 1 Type of Load Room Laundry Room Elevation 328 Latitude 43 Daily Range M Square Feet 318 lAG Volume I 3180 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 b lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 c Store Front Glass Door,Metal No Break West 51.06 69.03 Windows d & Glass e Doors f 9 h ►Lookup a b Skylights d e ►Lookup a Wood&Metal b Doors c I. Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 150 366 74 b Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 80 195 16 c Above d Grade e Walls f 9 h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 120 195 46 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 24 630 ► Lookup a Lighting Fixtures 137 b Occupants&Plants Internal c Office Equipment d Food Service Equipment and Investigated Loads 4,000 e Blower Heat(Building Load) '► Lookup Infiltration 0.26 0.14 1,122 82 146 O. Lookup Supply Duct Load Return Duct Load ►Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 218 Total Loads 2,509 4,572 146 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 AccK Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Men's Room Elevation 328 Latitude 43 Daily Range M - Square Feet 405 lAG Volume I 4050 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ► Lookup a b Skylights d e ►Lookup a • Wood&Metal b . Doors c P.Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 270 659 53 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls pi p2 P. Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 405 659 154 Ceilings b c P. Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 28 736 ►Lookup a Lighting Fixtures 982 b Occupants&Plants 900 720 Internal c Office Equipment d Food Service Equipment and Investigated Loads 4,000 e Blower Heat(Building Load) P.Lookup Infiltration 0.26 0.14 1,429 104 186 ►Lookup Supply Duct Load Retum Duct Load ► Lookup Ventilation Loads CFM ►Lookup Blower Heat(Equipment Load) 309 • Total Loads 3,483 6,483 906 `�«� Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 AockDesign City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Women's Room Elevation 328 Latitude 43 Daily Range M , Square Feet 405 lAG Volume I 4050 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ► Lookup a b Skylights ° d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 270 659 53 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls Pi p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 405 659 154 Ceilings b - c ► Lookup a- b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 28 736 ►Lookup a Lighting Fixtures 982 b Occupants&Plants 900 720 Internal c Office Equipment d Food Service Equipment and Investigated Loads 4,000 e Blower Heat(Building Load) O.Lookup Infiltration 0.26 0.14 1,429 104 186 P. Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM O. Lookup Blower Heat(Equipment Load) 309 Total Loads 3,483 6,483 906 Manual N,5th Edition,Abridged Version • Form N1 x~ Name Brookfield 407 BigBayRd,QBY,NY HeatingDesign 99%DB -4 HeatingDesign Space DB 70 _ Temp.Difference 74 �, Project 9 9 P Heating A- wim"-- Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 _ Type of Load Room Conference Room Elevation 328 Latitude 43 Daily Range M , Square Feet 420 lAG Volume I 4200 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 32.0 1,634 824 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ►Lookup a b Skylights d e P.Lookup a Wood&Metal b Doors c ►Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 280 684 55 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls P1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 420 684 160 Ceilings b c ► Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 28 736 ►Lookup a Lighting Fixtures 1,065 b Occupants&Plants 2,352 1,488 Internal c Office Equipment 1,060 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 1,481 108 193 ►Lookup Supply Duct Load Return Duct Load I. Lookup Ventilation Loads CFM I. Lookup Blower Heat(Equipment Load) 281 Total Loads 5,218 5,905 1,681 Manual N,5th Edition,Abridged Version • Form N1 � Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 �/�—�Aor Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 LJ, Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 I�r Type of Load Room Copy Room Elevation 328 . Latitude 43 Daily Range M Square Feet 158 lAG Volume I 1580 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent P. Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & Glass . e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ► Lookup a b Skylights d • e ► Lookup a Wood&Metal b Doors c P.Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 105 256 21 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 165 269 63 Ceilings - b c ►Lookup a b c Floors d e — f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 12 315 ►Lookup a Lighting Fixtures 532 b Occupants&Plants Internal c Office Equipment 4,310 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 0.26 0.14 557 41 73 10.Lookup Supply Duct Load Return Duct Load I. Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 248 Total Loads 1,398 5,215 73 rt: Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10'� Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 ���77 Type of Load Room Huddle Room#1 Elevation 328 Latitude 43 Daily Range M Square Feet 180 JAG Volume I 1800 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent I.Lookup a 1c-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 32.0 1,634 824 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c 1 c-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & Glass e lo-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h ►Lookup a b Skylights c d e _ ►Lookup a • Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 120 293 24 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 ► Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 180 293 69 Ceilings b c P. Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 13 342 ► Lookup a Lighting Fixtures 532 b Occupants&Plants _ 784 496 Internal c Office Equipment - 530 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 0.26 0.14 635 46 83 ► Lookup Supply Duct Load Return Duct Load ►Lookup Ventilation Loads CFM P. Lookup Blower Heat(Equipment Load) 140 Total Loads 3,196 2,949 579 Manual N,5th Edition,Abridged Version • Form N1 r • Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 ACCOrrikk Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room Locker Room Elevation 328 Latitude 43 Daily Range M Square Feet 462.5 lAG Volume I 4625 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Cig Sensible Clg Latent O. Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 74.0 3,778 3,844 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break North 51.06 25.75 9 h P. Lookup a b Skylights c d e ► Lookup a Wood&Metal b Doors c ► Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 250 611 50 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 185 452 116 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls P2 P ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 463 753 176 Ceilings b c P. Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 44 1,156 I.Lookup a Lighting Fixtures 1,393 b Occupants&Plants 800 640 Internal c Office Equipment d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 1,631 119 213 ► Lookup Supply Duct Load Return Duct Load O. Lookup Ventilation Loads CFM P. Lookup Blower Heat(Equipment Load) 325 Total Loads 8,381 6,821 853 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Jam .- Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 lJ Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 JJJ���777���rrr��AA�//f��\\\ Type of Load Zone Elevation 328 Latitude 43 Daily Range M • Square Feet 450 lAG Volume I 4050 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day _ 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent P.Lookup a b Windows c & d Glass e Doors g h ►Lookup a b Skylights d e ► Lookup a Wood&Metal b Doors c P. Lookup a • c Above d Grade e Walls g h Partition Walls P2 P P.Lookup a 17A-15m Metal deck plus R-15 board,no ceiling 4.51 1.40 Ceilings b c ► Lookup a b c Floors d e f P. Lookup a Lighting Fixtures 829 b Occupants&Plants 4,260 6,540 Internal c Office Equipment 18,400 d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► Lookup Infiltration 0.26 0.14 1,429 104 186 10. Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 1,180 Total Loads 1,429 24,773 6,726 Manual N,5th Edition,Abridged Version • Form N1 Via®,,... Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 Acassi Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 ' Type of Load Room Main Entrance Vestibule Elevation 328 Latitude 43 Daily Range M • Square Feet 124 lAG Volume I 1240 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Gig Latent ►Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b 1 c-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 18.0 919 935 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 Windows - d lc-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 & Glass e is-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break East 51.06 51.95 49.0 2,502 2,545 9 h ► Lookup a b Skylights c d e ► Lookup a Wood&Metal b Doors c P.Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 155 379 97 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls , f 9 h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling • 1.63 0.38 Ceilings b c O. Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 16 420 O. Lookup a Lighting Fixtures 328 b Occupants&Plants Internal c Office Equipment d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ►Lookup Infiltration 6.02 2.99 10,124 681 1,221 I. Lookup Supply Duct Load — Return Duct Load P. Lookup Ventilation Loads CFM ►Lookup Blower Heat(Equipment Load) 229 Total Loads 14,344 4,815 1,221 Manual N,5th Edition,Abridged Version • Form N1 Project Name Brookfield 407 Big Bay Rd,QBY,NY Heating Design 99%DB -4 Heating Design Space DB 70 Heating Temp.Difference 74 -�� Design State New York Cooling Design 1%DB 85 Cooling Design Space DB 75 Cooling Temp.Difference 10 f�'iJ' Design City Glens Falls Coincident Wet Bulb 71 Rel Hum Design Space% 50 Design Grains Difference 29 Type of Load Room South Entrance Vestibule Elevation 328 Latitude 43 Daily Range M Square Feet 138 JAG Volume I 1380 Altitude Correction Factor 1 Design Month Jul&Aug Design Hour of Day 3:00 PM Type of Exposure Construction Number&Description Panel HTM Net Area Btuh Faces Heating Cooling or Length Heating Clg Sensible Clg Latent ► Lookup a lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 b lc-cuf-c Double pane,fixed sash,Metal no break East 51.06 51.95 c lc-cuf-c Double pane,fixed sash,Metal no break South 51.06 68.59 18.0 919 1,235 Windows d lo-cuf-c Double pane,fixed sash,Metal no break West 51.06 69.03 Glass e lc-cuf-c Double pane,fixed sash,Metal no break North 51.06 25.75 Doors f Store Front Glass Door,Metal No Break South 51.06 31.56 49.0 2,502 1,547 9 h ►Lookup a b Skylights c d e ►Lookup a Wood&Metal b Doors c ►Lookup a Steel Bldg Wall,R-30 Cavity,Metal Siding North 2.44 0.20 b Steel Bldg Wall,R-30 Cavity,Metal Siding East 2.44 0.63 c Steel Bldg Wall,R-30 Cavity,Metal Siding South 2.44 0.50 115 281 57 Above d Steel Bldg Wall,R-30 Cavity,Metal Siding West 2.44 0.50 Grade e Walls f 9 h Partition Walls p1 p2 ►Lookup a 17B-10w R-13 roof decking,dead air space,R-19 ceiling 1.63 0.38 Ceilings b c ►Lookup a b c Floors d e f 22B-10pm Slab on grade,2"Edge Insulation,Heavy Dry or Light Wet Soil 26.27 12 315 ► Lookup a Lighting Fixtures 328 b Occupants&Plants Internal c Office Equipment d Food Service Equipment and Investigated Loads e Blower Heat(Building Load) ► Lookup Infiltration 2.83 1.40 5,289 354 635 I.Lookup Supply Duct Load Return Duct Load ► Lookup Ventilation Loads CFM ► Lookup Blower Heat(Equipment Load) 176 Total Loads 9,306 3,696 635 0 15- 155 MAX 2019* .5 HEAT RECOVERY VENTILATOR .'' *2019 denotes Energy Star certification,not manufacture date. a LIFE RERTie . ENGINEERING DATANu THERMALLY CONDUCTIVE,PATENTED DEFROST ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams. It is easily removed for cleaning or service. CASE Twenty gauge prepainted galvanized steel for superior corrosion resistance. MOTORS AND BLOWERS Insulated to prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)OD. Each airstream has one centrifugal blower driven by a common PSC motor,with Balancing ports are located on door. multiple fan speed operations. INSTALLER SELECTABLE HIGH SPEED SETTINGS FILTERS Adjustable DIP switches are located on the circuit board,Hi3 is the factory setting. Washable MERV-6 air filters in exhaust and supply airstreams. Referto the installation manual forthe adjustment instructions. Upgrade to MERV-13 option available. ELECTRONICS MOUNTING The DXPLO2 control included with the unit can bewail mounted in a central location of Four threaded inserts at corners of the cabinet designed to accept the the home.3 wire 20 gauge(win.)100 ft length(max.). "S"hooks and hanging straps supplied with the unit. Men's Room 155 Max 2019 Women's Room 155 Max 2019 OPTIONAL ACCESSORIES: Dual Hood her Hood TechGrille 99-190 Terminator 99-18 99-EAG4 Fitting 99-194 99-186 - 99-EAGS 99-TM4 ‘_ !'1 99-187 99-EAG6 1�1 99-TMS10* LIFEBREATH CONTROL OPTIONS TIMER OPTIONS FEATURES 99-DXPLO2 99-8CO2 99-BCO3 99-8C04 99-DETO1-20/40/60 Minute Timer Initiates high speed ventilation for 20,40 or 60 minutes.3 wire 5 speed fan operation on each mode ✓ connection. 2 speed fan operation(Low/High) ✓ ✓ 99-DET02-20/40/60 Minute Timer Continuous low speed fan operation ✓ ✓ v ✓ Initiates high speed ventilation for 20,40 or 60 minutes.Wirelessly connects to main control for ease of installation.40 ft approximate Humidity control through adjustable Dehumid- ✓ V. ✓ range. istat Large digital LCD screen ✓ 99-RXO2-Wireless Repeater Extends range of 99-DET02 Wireless Timers.Plugs into 120V power LED status indicator lights ✓ V. ✓ outlet.Wirelessly connects to main control and 99-DET02.Install at halfway point between timer and main wall control if timer is out of Continuous Ventilation ✓ ✓ ✓ ✓ range. Continuous Recirculation* ✓ V INCLUDED WITH ALL MAX UNITS 200N/40OFF ✓ ✓ ✓ an IS ®r o� 10 0N/50 OFF V. ` ., 20 ON/40 Recirculation* ✓ ✓ V. x 1 f1' + i o 20/40/60 min.High speed override button ✓ 99-DXP1.02 99-DETO2 99 D ETO1 Compatible with 99-DET02 Wireless Timer ✓ ✓ ✓ ✓ - is® 3 wire connection ✓ ✓ ✓ ✓ L IFEB E Tit *Recirculation features not available an fan defrost models. N e Indoor Air Systems 69-155MAX 2019(0921) www.lifebreath.com * r3 0 F -. ' f 155MAX2019* , ,. ..,„ HEAT RECOVERY VENTILATOR . ,., *2019 denotes Energy Star certification,not manufacture date. PERFORMANCE (HVI CERTIFIED) LIFE®RER7- . r— N. (N W.G(PA) [ Fs (75) (100) I OS(125)a `ELECTRICALSPECIFICATIONS (U5)•I�FM(Vs) I CFM(Us)J CFM(Us) VAC.@ 60Hz 120 Net Supply Airflow 159(75) 148(10) 140(66) 125(59) Watts/Low Speed 66 Gross Supply Airflow 167(79) 159.(15) 146(69) 131(62) Watts/High Speed 118 Gross Exhaust Airflow. 172(81) 159(75) 133(63) 83(39) Amp Rating 1.4 Sensible Effectiveness(ASO 18o WEIGHT: @ 59 CFM(28 Us) 32°F(0°C) 84% 71 LBS(32 KG) • 160 Sensible Efficiency 327(0°C) 75% SHIPPING WEIGHT: @ 64 CFM(30 Us) E 140 73 LBS(33 KG) Sensible Efficiency(SRO 32°F(0°C) 72% 6.95 CFM(45 Us) :02o0Sensible Efficiency(SRE) -13°F(-25'C) 72% 0 NOTE: @ 68 CFM(32 Us) Front clearance of 25 in.(635 mm)is so recommended for servicing unit All ducts C� use 6 in.(152 mm)round collars.Balancing 66 ii��11 V V� ��® I 6o dampers are located in all air streams. �.-. S gaol ©-- p "'ILI" ew CERTIFIED et°¢mnt° r r i r t r r i 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 MERV 13 Upgrade:65-195-6R Static Pressure(in w.g.) This product earned the ENERGY STAR®by meeting strict energy efficiency guidelines set by Natural Resources Canada and the US EPA.It meets ENERGY STAR®requirements only when used in Canada. DIMENSIONS DOOR SIDE VIEW SIDE VIEW TOP VIEW PI • _ :,� . ,�� -�, o� ° Airflow: E ► /' `� _ Core � � Stale Air to Outside \ `__� • ° Fresh Air from Outside �'-I ` I I I. o '<=i 1 0 CI Ii Stale Air from Inside iii. 1ti!III ��I�I 1 • I r ♦ Fresh Air to Inside ���1_- 6In.(152 mm) `ialk Round Collars 33.63 In(854mm) 1 ® 14.75 in.(375 nun) , Recirculating Filters Motorized Defrost Damper Impellers Date: Contractor: WARRANTY Men's & Women' s Room Units carry a lifetime warranty Tag: on the}IRV•core and a 5year• Supplier: repfaeement parts warranty. 407 Big Bay Rd 2 Project: Ilty: quote#: All units conform to CSA and UL standards Engineer: Submitted By: �® Control: 9 9—DXPL02 Timer: Timer flty: LIFE RERTH ®/ Indoor Air Systems 59-155MAX 2019(0921) www.lifebreath.com o. 0 . 0 „ O 330 ERv . ENERGY RECOVERY VENTILATOR ENGINEERING DATA: I TOTAL RECOVERY CORE ELECTRONICS 10E4 f9ry The cross-flow energy recovery core transfers heat and water vapor between the two Integrated microprocessor circuit board. -- air streams.It is easily removed for cleaning or service. Built-in interlock contacts. Optional remote speed control. MOTORS Two PSC,3 speed single shafted,120 VAC,1.92 Amps each(3.8 total on high speed). FROST PREVENTION HP-1/6,1625 RPM.MCA:4.8 MOP:15 Watts-total on high speed-437. Temperature sensor activated,periodically shuts down supply motor.Drains not required. FILTERS OPTIONAL CONTROL 2 in.pleated MERV 8 filters in supply and exhaust air streams. 99-BC04 LIFEBREATH VENTILATION CONTROL BLOWERS •2 speed fan setting(Low/High) •2 modes of operation:Ventilation,20/40 Slide easily in/out of unit.Centrifugal type rated at 460 CFM(217 L/s)free air delivery. •Compatible with 99-DET02 Wireless Timers Each air stream has one single shafted motor driving a centrifugal blower. •3 wire connection;20 gauge wire(minimum) CONNECTION DUCT SIZES TIMERS 330 ERV-Four-8 in.x 8 in.(200 mm x 200 mm). 99-DET02 LIFEBREATH WIRELESS 20/40/60 MINUTE TIMER MOUNTING •Initiates high speed Ventilation for 20,40 or 60 minutes Unit to be set on support brackets hung by threaded rod type apparatus(brackets and rods •Wirelessly connects to main control for ease of installation not provided). •40'approximate range CABINET 99-DETO1 LIFEBREATH 20/40/60 MINUTE TIMER • Unit has front and back access doors and electrical panel can be switched to either side Initiates high speed ventilation for 20,40 or 60 minutes.3 wire connection. giving installer flexibility in duct direction,20 gauge prepainted galvanized steel(G60)for 99-RX02 LIFEBREATH WIRELESS REPEATER superior corrosion resistance.Insulated with foil faced insulation where required to prevent •Used to extend range of 99-DET02 Wireless Timers exterior condensation. •Plugs into 120V power outlet and wirelessly connects to main control and 99-DET02 Airflows(Each Air Stream) Total Effectiveness WEIGHT: 450(212) _ 120 LBS(54 KG) 400 ne9) 80% SHIPPING WEIGHT: 'a 350(165) 70°/° ' .•-•. sensime 150 LBS(68 KG) 300(142) a 60°/0 .... LL C 7uta)Winter 250(lle) m - 2 50°/u .. 0 tr. (94) c 40°/° WARRANTY ( '¢ 150(71) w total Summer' 100(47) 30°% Units ca rry a 5 ye a r 20°/° warranty on the core 50(24) • anda2year 200 300 400 replacement parts 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 (94) (142) (189) (25) (50) (75) (100) (125) (150) (175) (200)(225)(250) warranty. Airflow CFM(L/s) External Static Pressure in.w.e.(Pa) ISO FRONT VIEW Discharge Side Inlet Side 9001 REGISTERED mrsiSUPPLY AIR • EXHAUST AIR o 91n. o FROM OUTSIDE III, TO OUTSIDE o :Ilzoomm), o (10 Imm) (2o01mm) Note:The 330ERV model Filters I •III 2 Motors E f 11u2nm1 . may easily be reversed in It 41n. Tln the field.Service clearance Removable Energy Ilr `■II I(102 mm) 30Recovery Core • 411111 (178 mm) is in.c e s mm)from SUPPLY AIR �, front access doors. EXHAUST AIR }�TO BUILDING N '(200mm)' file. FROM BUILDING-- I (200mm) AHRI 1060 Certified Core: IL � 5.5ia Contains one 68-280 I(140 mm) 3In. O6mm) rail" rn� j.CERTIFIED`' 34 in.864 mm I '18.75 in.(476 mm) I I 18.75 in.(476 mm) I ""'•`a"' Galt y.mpnCMla!,MWH 50 CATALOGUE-F E B-2021 I f lifl-e7 U hi 6 SUBMITTAL AC036MNTDCH/AA, AC036MXSCCC/AA Page 1 of 4 Samsung,Low Ambient Cooling,High-Wall Evaporator,Split System Job Name Brookfield Power Location 407 Big Bay Rd., Queensbury, NY, 12804 Purchaser Engineer Submitted to Reference n Approval 0 Construction n Unit Designation#3, 4, 5, 6, 7, 8, 9& 10 Schedule# sassuso ^3 _ Specifications t I 0 S '_ ,_.4- • Model Indoor Unit Model Number(US Code) AC036MNTDCH/AA(CNH36TDM) - u--•-•.- Outdoor Unit Model Number(US Code) AC036MXSCCC/AA(CXC36SCM) - _1 Nominal Capacity Bluth 36,000 _n •a- ' Performance Capacity Range Btu 10,000-38,OOD .Wall-mounted evaporator SEER/EER 18.0/8.10 AHRI Certification Number 10491547 •Low ambient cooling to-40° Voltage I o/V/Hz 1/208-230/60 Working Voltage Range(VAC) 176-254(max.3r deviation from each) •The outdoor unit shall supply power to indoor unit via 14 AWG X 3 power wire Power Operating Current min./std./max. 3.0/19.5/21.0 •Auto-restart after power loss Max.Breaker Amps 30 Min.Circuit Ampacity(A) 24.0 •The outdoor unit shall have a snow accumulation prevention option setting to prevent W X H X D Indoor Unit 50 3/8 x 13 9/16 x 9 15/16 snow drifting against an idle outdoor unit. (in.) Outdoor Unit 37 X 39 11/16 X 13 Dimensions Weight Indoor Unit 40.57 •The indoor unit shall have a removable EEPROM that stores system programming (lbs.) Outdoor Unit 159.61 information,unit name,and other data Heat Exchanger Indoor&Outdoor Unit Type Aluminum Fin/Copper Tube •The-outdoor unit shall have a night time quiet mode option to reduce operating sound Sound Pressure Indoor Unit dB(A) (Silent)/L/M/H 38/46/48/51 during the night. Level Outdoor Unit dB(A) High 54 Construction Operating Outdoor °F(°C) 23-115°F(-5-46°C) The outdoor unit shall be galvanized steel with a baked on powder coated finish for -40-115°F(46°C)w/wind baffle durability Temperatures Indoor °F(°C) 61--90°F(16-32°C) Indoor unit chassis shall be UL94 VO with a galvanized steel mounting plate Indoor&Outdoor High side(flare) 3/8" - Low side(flare) 5/8" The indoor unit shall have easy-access to wire,pipe,and drain connections via access Pipe Connections Maximum(ft.) 164 panel on front of unit for easier installation and service Maximum Vertical Separation(ft.) 98.4 Condensate Connection 11/16"OD Heat Exchanger Type R410A The indoor unit and outdoor unit heat exchangers shall be mechanically Control Method bonded aluminum fin to copper tube Electronic Expansion Valve Refrigerant Factory Charge Ioz. 84.64 Controls Charged for 25 ft Control signal shall be a DDC type signal Additional Refrigerant 0.32 oz/ft over 25 ft Manufacturer Samsung Advanced configuration options for high room temperature alerts using MIM-B14 Compressor Type Inverter Driven,BLOC,Rotary _ external contact control to enable a backup system and/or to notify a BMS(refer RLA (Amps 16.5 to technical documents available at www.samsungHVAC.com for full details). Type BLDC with Crossflow fan(1) Interconnect control wire between outdoor and indoor unit shall be 16AWG X 2 shielded Evaporator Fan Air Volume I CFM(L/M/H) 699/752/830 Output(W)/FLA(A) 58 W/0.90 A Wired controllers must be purchased separately Condenser Fan Motor BLDC With Axial Type Fan(1) FLA/W/CFM(max.) 1.51 A/164 W/2,754 CFM Wireless controller included Certifications I ETL(UL 1995) Controls shall integrate with a BMS system Safety Devices:PCB fuses,indoor unit terminal block thermal fuse,current transformer,over-voltage protection,crankcase heating,temperature limit protection logic,compressor overload sensing The system shall integrate with the Samsung NASA Controls Solution Certified in accordance with the AHRI Unitary Small Air-Conditioners(USAC)Certification Program which is based on the latest edition of AHRI Standard21orz40. No additional interface modules/adapters are required when connecting to Samsung Samsung HVAC maintains a policy of ongoing development,specifications are subject to change without notice.Refer to NASA DVM S central control options(MIM-DO1AUN,MIM-B17BUN,MIM-B18BUN, www.AHRldirectory.org for current reference numbers. MCM-A300UN). Notice:US Federal law requires that the above model to be installed in all U.S.states and territories except in AZ,CA, NM,and NV.Federal law prohibits installation of this unit in these states. Refrigerant System The refrigerant shall be R41 DA The compressor shall be hermetically sealed,inverter controlled,BLDC Rotary Refrigerant flow shall be controlled by an electronic expansion valve at outdoor unit Soft-start to reduce current demand during compressor start Warranty 7 Years compressor,5 years parts with registration • CERTIFIED. c us 62021 Samsung HVAC 888-699-6067 uNS�4a tme °°n° SHA-CAC-01132021 www.SamsungHVAC.com • •-y °'Oae,A' Intertek SIA.M S U N 0 SUBMITTAL AC036MNADCH/AA Page2of4 ■ Samsung,Low Ambient Cooling,High-Wall Evaporator,Split System AC036MNADCH/AA Accessories Optional Accessories Simplified Touch Controller n MWR-SH11 UN Wired Controller Advanced Wired Controller n MWR-WGOOUN Aspen Mini Orange n ASP-MO-UNIV 110-250 Condensate pump Blue Diamond n .BD-BLUE230 Wi-Fi Adapter n MIM-HO4UN External Temperature Sensor rl MRW-TA External Contact Control n MIM-B14 Wall Bracket(for outdoor unit) Q CKN-250 Front n WBF-2M-B Wind Baffles Back Q WBB-3M 25'-ILS-2510 Line Sets-insulated and flared,interconnect cables included r i 50'-ILS-5010 Thermostat Adaptor(for connection to a standard 24VAC thermostat) MIM-A6OUN • • 888-699-6067 www.SamsungHVAC.com S u G SUBMITTAL AC036MNTDCH/AA,AC036MXSCCC/AA Page 3of4 Samsung,Low Ambient Cooling,High-Wall Evaporator,Split System AC036MNTDCH/AA Dimensional Drawing 50 3/8" o. /yfi)— — - — Hi a '-4 — .. — _ - I I o \ la. -�., �� _ miiis 1 I _ 0, I(10" _ L. m �N_ . 1 , 1 CV Cst �I 2 I L � 1—J- , Knockout hold for left piping Knockout hole for right piping 1t====_____==_===== ._ __ ii I v v v I y 60 1/4" m U, N WWI !HEW ntiMIni IMF 6 6 g o 0 \ �p p� EN �o a� is �o o : 14 5/16" io 6 1/8" • e 0 029/16' e • o . o . 029/16" Oz.m I` _...8. • .i[. o •il:f 1`i. III029116 Wall hole for right rear piping 415/16' Wall hole for right rear piping No. Name . . ',Description"• _ 1 Liquid pipe connection 3/8" 2 Gas pipe connection 5/8" 3 Drain pipe connection 11/16"OD 4 Power supply&Communication wiring conduit 888-699-6067 www.SamsungHVAC.com S A'M-S U N G SUBMITTAL AC036MNTDCH/AA,AC036MXSCCC/AA Page 4of4 Samsung,Low Ambient Cooling,High-Wall Evaporator,Split System AC036MXSCCC/AA Dimensional Drawing 37" 11 5/16" IA��al� I. 'rill====:=:-_—. ===_••=1'....h.„,,,, m. ..—,i la 7.1:,:_.:,,._:;:: _ _ ;mi 'I•' : Cil ______.,___—___ __ ,._ __ _ . ._ IP=.7-_-.1--Fia'L-4:*.:-.7:-::-.F-.z.-=-5:7 .SSEE-- -ZiiY. 4%"1,gYi••=ii:E. !Ir41 ijill 7=7.:E.7-2=.--- _.77--m pl:-m _ !-2--2ff:P.-N-ff-4--=-=_-_---ME' ill .::::...: A4Uonul • © O 0 24 7/8" 4-0 15/32" ;r: I _ . 1 v Q. No. Name . Desc Description • 1Q Gas Pipe Connection 013/8"Flare l Liquid pipe Connection 0 5/8°Flare 0 Drain Hole - 888-699-6067 www.SamsungHVAC.com • ' B.rc okfield Power 407 Big Bay Rd. , Queensbury, NY, 12804 700706-YTG-H-0616 DESCRIPTION iv YOR I I ( These compact units employ induced combustion, reliable hot surface ignition and high heat transfer aluminized tubular heat ®' exchangers. The units are factory shipped for installation in upflow or horizontal applications and may be converted for downflow applications. These furnaces are designed for residential installation in a basement, closet, alcove, attic, recreation room or garage and are also ideal for commercial applications. All units are factory TECHNICAL GUIDE assembled, wired and tested to assure safe dependable and economical installation and operation. 96%AFUE TWO STAGE VARIABLE SPEED These units are Category IV, National Fuel Gas Code and may ECM RESIDENTIAL GAS FURNACES be vented either through side wall or roof applications using MULTI-POSITION approved plastic combustion air and vent piping.Approved plas- Units 1,2& 11 tic combustion air and vent piping include Polyflue(a polypropyl- MODELS: TM9V*C Model#TM9V100C2OMP11 C ene venting systems). NATURAL GAS Units 12&13 FEATURES 40-120 MBH INPUT Model#TM9V080C16MP11 C • Two stage heating operation includes two stage gas valve, two stage inducer operation and variable speed ECM as -t `�'"" blower operation. Adjustable delay timer allows two stage D ',{ , r operation with a single stage thermostat. i ,r f • Easily applied in upflow, horizontal left or right, or downflow ' It , 6e ., s ,$ installation with minimal conversion necessary. Compact,easy to install, ideal height 33"tall cabinet. ., ii z - -, • ECM variable speed drive for cooling SEER enhancement, f �t 5 SIEAR :sek improved comfort with optional airflow delay profiles, and .' . ' ?I COM.RT,E _ _ ��...� ASSU RAN CE continuous fan options for IAQ performance. P ° 6 r P •�� Easy access to controls to connect power/control wiring. t i•„ A • Built-in, high level self diagnostics with fault code display. l :� � } �\ • Low unit amp requirement for easy replacement application. • -. • All models are convertible to use propane(LP)gas. ` pOlyflue • Electronic Hot Surface Ignition saves fuel cost with ;'' t increased dependability and reliability. :" :11 • 100%shut off main gas valve for extra safety. ' ge • 24V, 40 VA control transformer and blower relay supplied _. - for add-on cooling. • Hi-tech tubular aluminized steel primary heat exchanger ."*"",..., ilini CERTIFIED. with stainless steel tube/aluminum fin secondary heat Good Housekeeping A..." exchanger for outstanding efficiency. * * * _% �'"°""° • Solid removable bottom panel allows easy conversion. ***'*** ) • Airflow leakage less than 1%of nominal airflow for duct per- AMERICAN formance testing conditions. QUALITY ' _ 'so -= -Y •oa No knockouts to deal with,making installation easier. 9p�O REGISGRf`� Movable duct connector flanges for application flexibility. DESIGNED.D INNNEESED I , ' • 9 Pp Y ASSEMBLED THE USA - ISO 9001 EA Certified Quality • Quiet inducer operation, burner, and blower operation. Management System • Inducer rotates for easy conversion of venting options. Due to continuous product improvement,specifications are • Fully supported blower assembly for easy access and subject to change without notice. removal of blower. Visit us on the web at www.york.com • External air filters"used for maximum flexibility in meeting Additional rating information can be found at customers IAQ needs. www.ahridirectory.ora • Insulated blower compartment for thermal and acoustic per- formance. WARRANTY SUMMARY • 1/4 turn knobs provided for easy independent door removal. A 20-year limited warranty on heat exchangers in residential • Internal condensate trap design (patent pending) provides applications. condensate management options and is self priming to pre- A 10-year warranty on the heat exchanger in commercial vent nuisance problems. applications. • Protection included from air intake,exhaust vent or conden- Standard 5-year limited Parts warranty. Extended lifetime heat exchanger and 10-year limited sate blockage. parts warranty when product is registered online within • Venting applications maybe installed as either 2 pipe sealed 90 days of purchase for replacement or closing for new combustion or single pipe vent using indoor combustion air. home construction. • These models may be connected as part of a communicat- See Limited Warranty certificate in Users Information Manual for details. ing control system using a 4-wire connection bus. FOR DISTRIBUTION USE ONLY-NOT TO BE USED AT POINT OF RETAIL SALE • 700706-YTG-H-0616 LEFT SIDE FRONT RIGHT SIDE Combustion Air Inlet Combustion Air Inlet _ A �{� • Condensate Drain Gas Pipe c l� ' • (Downflow) ��Entry Gas Pipe Condensate Drain Entry ���or(Downflow) Vent Outlet—fO Electrical p��Entry Electrical�Q Entry Vent Outlet Condensate o . o Drain • ® ®_ . 33 Condensate ' I 23" > r a a 1 o�` ® ® Drain o r-a , I Thermostat o � Wiring Thermostat Wiring Optional Ret rnlllAir Cutout" (Eithler side) 1iii" 4° I L a J c Lri . FN J u 1 28.5" ."1 A— 1.5-$ 29.5" 56 � 23.8" 3" Units 1,2& 11 TI...__ 6 ILoutlet Model#TM9V100C20MP11C t -0.' "T B Combustion Units 12&13 B Air Inlet 40 c Model#TM9V080C16MP11C ., ,i 56 ► 56° 20" 1424.25' SUPPLY END RETURN END Cabinet&Duct Dimensions Cabinet Dimensions(Inches) Approximate Model Nominal Cabinet Operating Weights CFM(m3/min) Size A B C Lbs TM9V040A1OMP11C - 1- 000 A 14-1/2 13-3/8 11-3/4 113 TM9V060612MP11C 1- 200 B 17-1/2 16-3/8 13-1/4 122 TM9V080612MP11C 1- 200 B - 17-1/2 16-3/8 13-1/4 126 TM9V080C16MP11C. 1600 C .21 .;19-7/8 _ 16-1/2 _136 TM9V100C16MP11C 1- 600 C 21 19-7/8 18-1/4 142 TM9V100020MP11C ,2000 C - ,21 19-7/8 . 18-1/4 145 TM9V120D2OMP11C - 2- 000 D 24-1/2 23-3/8 21-3/4 156 Ratings&Physical/Electrical Data Input Output Total AFUE High Fire Low Fire Model High/Low High/Low Unit Air Temp.Rise Air Temp.Rise MBH MBH Amps % °F °F TM9V040A1OMP11C 40/26 38/25 - 9 96 30-60 20-50 TM9V060B12MP11 C 60/39 58/37 9 96 35-65 35-65 TM9V080B12MP11 C 80/52 77/50 9 96 40-70 35-65 ,1M9V080C16MP11C 80/52 77/50 112 96 35-65 ;35-65 TM9V100C16MP11C 100/65 96/62 12 96 35-65 30-65 M9V100020MP11C 100/65 96/62 - T .14 96 35-.65 35-65 TM9V120D2OMP11C 120/78 115/75 14 96 35-65 35-65 Max.Outlet Blower Blower Size Max. Min.Wire Size Model Air Temp. Over-current (awg)@ 75 ft. °F HP Amps In. Protect One Way TM9V040A1OMP11C 190 1/2 7 11 X 8 15 14 TM9V060B12MP11C 190 1/2 7 11x8 15 14 TM9V080612MP11C 190 1/2 7 11x8 15 14 TM9V080C16MP11C 190 2.3/4 1,10.2 11x 10 .15 14 TM9V100C16MP11C 190 3/4 10.2 11 x 10 15 14 ,TM9V100C20MP11C 190 1, 12.7 .11x 11 20. 1? TM9V120D2OMP11C 190 1 12.7 11 x 11 20 12 Annual Fuel Utilization Efficiency(AFUE)numbers are determined in accordance with DOE Test procedures. Wire size and over current protection must comply with the National Electrical Code(NFPA-70-latest edition)and all local codes. The furnace shall be installed so that the electrical components are protected from water. 2 Johnson Controls Unitary Products - .. 700706-YTG H 0616 FILTER PERFORMANCE Concentric Vent Termination- For use through rooftop, side- The airflow capacity data published in the "Blower Perfor- wall.Allows combustion air to enter and exhaust to exit through mance"table shown represents blower performance WITHOUT single common hole. Eliminates unsightly elbows for a cleaner filters. installation. All applications of these furnaces require the use of field Si 1CT0302(2")&S1 1CT0302-636(2") installed air filters. All filter media and mounting hardware or S1 1 CT0303(3")&S1 1 CT0303 636(3") provisions must be field installed external to the furnace cabi- Sidewall Vent Termination Kit- For use on sidewall,two-pipe net. DO NOT attempt to install any filters inside the furnace. installations only.Provide a more attractive termination for loca- tions where the terminal is visible on the side of the home. NOTICE Si 1HT0901 (3") S1-1 HT0902(2") Single side return above 1800 CFM is approved as long as the filter velocity does not exceed filter manufacturer's rec- ommendation and a transition is used to allow use on a plastic tube fittings for installation in the drain line.Calcium car- 20x25 filter. bonate refill media is available from the Source 1 Parts (P/N • 026-30228-000). Recommended Filter Sizes(High velocity 600 FPM) - S1 1 NK0301 Side Return Filter Racks - The S1-1SR0200 Kit accommo- Cabinet Side Bottom CFM Size (in) (in) dates a 1",2"or 4"filter.The S1-1 SR0402 Kit accommodates a 1"filter only. 1000 A 16x25 14x25 1200 B 16 x 25 16 x 25 S1-1 SR0200-All Models 1600 C 16 x 25 20 x 25. S1-1 SR0402-All Models 2000 C (2)16.x25 20 x 25. Bottom Return Filter Racks -The S1-1 BR05*series are gal- 2000 D ' (2)16 x 25 22 x 25 vanized steel filter racks.The S1-1 BRO6*series are pre-painted steel filter racks to match the appearance of the furnace cabi- 1. Air velocity through throwaway type filters may not exceed 300 feet per min- net. The S1-1 BRO5*and S1-1 BRO6* series filter racks accom- ute(91.4 m/min).All velocities over this require the use of high velocity fil- ters. modate a 1", 2"or 4"filter. 2. Do not exceed 1800 CFM using a single side return and a 16x25 filter.For S1-1 BR0514 or S1-1 BR0614-For 14-1/2"cabinets CFM greater than 1800,you may use two side returns or one side and the bottom or one return with a transition to allow use of a 20x25 filter. S1-1 BR0517 or S1-1 BR0617-For 17-1/2"cabinets S1-1 BR0521 or S1-1 BR0621 -For 21"cabinets Unit Clearances to Combustibles S1-1 BR0524 or S1-1 BR0624-For 24-1/2"cabinets Application Upflow Downflow Horizontal Combustible Floor Base Kit- These kits are required to pre- Top 1" 0" 0" vent potential overheating situations when the furnaces are Vent 0" 0" 0" . installed in downflow applications directly onto combustible Rear 0" 0" 0" flooring material. These kits are also required in any applica- Side 0" 0" 1" tions where the furnace is installed in a downflow configuration Front* 0" 0" 0" without an indoor coil and where the combustible floor base kit Floor Combustible Combustibles Combustible provides access for combustible airflow. Closet Yes Yes Yes S1-1CB0514-For 14-1/2"cabinets Line Contact . No No Yes S1-1CB0517-For 17-1/2"cabinets S1-1CB0521 -For 21"cabinets 1. For combustible floors only when used with special sub-base. S1-1 CB0524-For 24-1/2"cabinets • -24"clearance in front and 18"on side recommended for service access. High Altitude Pressure Switches - For installation where the All furnaces approved for alcove and attic installation. altitude is less than 5,000 feet, it is not required that the pres- ACCESSORIES sure switch be changed.For altitudes above 5,000 feet,see kits Propane (LP) Conversion Kit-This accessory conversion kit below. may be used to convert natural gas units for LP operation. S1-1 PS3306-060 S1-1 NP0347-All Models S1-1 PS3307 040, 080 S1-1 PS3302-100, 120 LP Stainless Steel Burner Kit-This accessory conversion kit Thermostats - Compatible thermostat controls are available may be used to convert existing burners to stainless steel burn- through accessory sourcing. For optimum performance, these ers for LP use only. outdoor units are fully compatible with our York touch screen S1-32926889000-All LP Models thermostat with proprietary(patent-pending)hexagon interface. Natural (NAT) Gas Stainless Steel Burner Kit- This acces- For more information,see the thermostat section of the Product sory kit may be used to replace existing burners with stainless Equipment Catalog. steel burners for NAT gas use only. S1-THXU280-All Models S1-32924441000-All NAT gas Models Johnson Controls Unitary Products 3 Air Flow Data HIGH/LOW SPEED COOLING AND HEAT PUMP CFM 040A10 060B12 080B12 Jumper Settings High Low High Low High Low COOL Tap ADJ Tap 1073 704 1320 858 1320 858 A B 957 622 1100 715 1100 715 B B 975 640 1200 780 1200 780 A A 870 565 1000 650 1000 650 B A 878 576 1080 702 1080 702 A C 770 501 880 572 880 572 C B 783 509 900 _ 585 900 585 B C 649 440 660 440 660 440 D B 700 455 800 520 800 520 C A • 590 400 600 400 600 400 D A 630 410 720 468 720 468 C C 531 400 540 400 540 400 D C 080C16 100C16 100C20 Jumper Settings High Low High Low High Low COOL Tap ADJ Tap 1760 1144 1760 1144 2200 1430 A B 1540 1001 1540 1001 1760 1144 B B 1600 1040 1600 1040 2000 1300 A A 1400 910 1400 910 1600 1040 B A 1440 936 1440 936 1800 1170 A C 1320 858 1320 858 1540 1001 C B 1260 819 1260 819 1440 936 B C 1100 715 1100 715 1320 858 D B 1200 780 1200 780 1400 910 C A 1000 650 1000 650 1200 780 D A 1080 702 1080 702 1260 819 C C 900 585 900 585 1080 702 D C 120D20 Jumper Settings High Low COOL Tap ADJ Tap . • 2200 1430 A B • 1760 1144 B B 2000 1300 A A 1600 1040 B A . 1800 1170 A C 1540 1001 C B 1440 936 B C 1320 858 D B 1400 910 C A - 1200 780 D A . , _ 1260 819 C C - 1080 702 D C HIGH/LOW HEAT CFM 040A10 060B12 080B12 Jumper Settings High Low High Low High Low HEAT Tap ADJ Tap 890 770 1200 870 1366 1156 A Any 790 660 1070 770 1293 1022 B Any 711 578 970 693 1185 924 C Any 646 514 890 630 1094 840 D Any 080C16 100C16 100C20 Jumper Settings High Low High Low High Low HEAT Tap ADJ Tap 1580 1156 1975 1444 1975 1284 A Any 1422 1027 1778 1284 1778 1156 B Any 1293 924 1616 1156 1616 1050 C Any 1185 840 1481 1050 1481 963 D Any 120D20 Jumper Settings • ' • High Low HEAT Tap ADJ Tap 2250 1539 A Any 2133 1385 B Any 1939 1259 - C Any 1778 1154 D Any All CFM's are shown at 0.5"w.c.external static pressure.These units have variable speed motors that automatically adjust to provide constant CFM from 0.0"to 0.6" w.c.static pressure.From 0.6"to 1.0"static pressure,CFM is reduced by 2%per 0.1"increase in static.Operation on duct systems with greater than 1.0"w.c.external static pressure is not recommended. NOTE:At some settings,LOW COOL and/or LOW HEAT airflow may be lower that what is required to operate an airflow switch on certain models of electronic air cleaners.Consult the instructions for the electronic air cleaner for further details. The ADJ"D"tap should not be used. Subject to change without notice.Published in U.S.A. 700706-YTG-H-0616 Copyright©2016 by Johnson Controls,Inc.All rights reserved. Supersedes:700706-YTG-G-0615 York International Corp. 5005 York Drive Norman,OK 73069 s Brookfield Power 407 Big Bay Rd. ,Queensbury, NY, 12804 TABULAR DATA SHEET YORK® AFFINITYTM SERIES SPLIT SYSTEM AIR CONDITIONERS 19 SEER, 2-STAGE - R-410A- 1 PHASE - 2 THRU 5 NOMINAL TO S MODELS: YXT24 THRU 60 Units Units PHYSICAL AND ELECTRICAL DATA 12& 13 1,2&11 MODEL YXT24BS21S YXT36B21S YXT48B21S YXT60B21S Unit Supply Voltage 208-230V,14),60Hz Normal Voltage Range 1 187 to 252 Minimum CircuitAmpacity 15.3 21.4 28.2 31.4 Max.Overcurrent Device Amps 2 25 35 45 50 Min.Overcurrent Device Amps 3 20 25 30 35 Type Scroll Scroll Scroll Scroll Compressor Rated Load 10.0 14.8 20.4 22.9 Locked Rotor 62.9 84.2 122.1 147.2 Crankcase Heater No No No No Factory External Discharge Muffler No No No No HS Kit Required with TXV No No No No HS Kit Part Number(S1-2SA067*****)4 10106 10106 10106 10106 Fan Diameter Inches 26 26 26 26 Rated HP 1/3 1/3 1/3 1/3 Fan Motor Rated Load Amps 2.80 2.80 2.80 2.80 Nominal RPM 574 689 800 777 Nominal CFM 2650 3350 3925 3900 Face Area Sq.Ft. 26.40 31.20 31.20 31.20 Coil Rows Deep 1 2 2 2 Fins/Inch 25 22 22 22 Liquid Line Set OD(Field Installed) 3/8 3/8 3/8 3/8 Vapor Line Set OD(Field Installed)5 3/4 3/4 7/8 1-1/8$ Unit Charge(Lbs.-Oz.)6 8-8 13-6 15-1 16-11 Charge Per Foot,Oz. 0.62 0.62 0.67 0.75 Operating Weight Lbs. 195 265 295 295 1. Rated in accordance with AHRI Standard 110-2012,utilization range"A". 2. Dual element fuses or HACK circuit breaker.Maximum allowable overcurrent protection. 3. Dual element fuses or HACR circuit breaker.Minimum recommended overcurrent protection. 4. Use S1-2SA067*****series kit.See Hard Start Kit Accessory Installation Manual. 5. For applications with non-standard vapor line sizes,see the"Applications&Accessories"section of this Technical Guide. 6. The Unit Charge is correct for the outdoor unit,smallest matched indoor unit,and 15 feet of refrigerant tubing.For tubing lengths other than 15 feet,add or sub- tract the amount of refrigerant,using the difference in actual lineset length(not the equivalent length)multiplied by the per foot value. $ Adapter fitting must be field installed for the required 1-1/8"line set. ..----AC--________ DIMENSIONS -.ic r _� Dimensions Refrigerant Connection /� �f \` Unit (Inches) Service Valve Size /Y' `c T � Model �``/.I �a A B C Liquid Vapor z� r�� I�IIGporyNE YXT24B21S 40-1/4 38-1/4 34-1/2 i:x �o�.iir 3/4 YXT36B21S 46-1/2 38-1/4 34-1/2 YXT48B21S• 46-1/2 38-1/4 34-1/2 3-!8 .7/8 Ata�� , 5,rYXT60B21S 46-1/2 38-1/4 34-1/2, 7/8$ $Adapterfitting must be field installed for the required 1-1/8"line set. All dimensions are in inches and are sub ect to chan a without notice. Overall height is from bottom of base pan to top of fan guard. a `a ��ZGcO ,p° Overall length and width include screw heads. �,O: esCpm .'r✓ r.. 141111111.111.01111 A1066-001 Johnson Controls Ducted Systems 5390977-YTD-C-0420 I . c SYSTEM CHARGE FOR VARIOUS MATCHED SYSTEMS Outdoor Unit YXT24BS21 YXT36B21S YXT48B21S YXT60B21S Required TXV 1'2 BH1 BA1 BC1 BC1 Indoor Unit3'4'5 Additional Charge,oz AE24B 0 — — — AE30B 2 — — — AE36(B,C) 4 0 — — AE42C — 6 — — AE48(C,D) — 6 0 — AE60C 8 8 5 0 AE6OD — 36 8 0 AVC24B 0 — — — AVC3OB 2 — — — AVC36(B,C) 4 0 — — AVC42C 6 6 — — AVC48(C,D) 7 6 0 — AVC60C 8 8 5 0 AVC6OD — 36 8 0 CF/CM/CU24(A,B,C) 0 — — — CF/CM/CU30(A,B,C,D) 2 — — — CF/CM/CU36(A,B,C,D) 4 0 — — CF/CM/CU42(B,C,D) 6 3 — — CF/CM/CU48(C,D) 7 6 0 — CF/CM/CU60(C,D) 8 8 5 0 CF/CM64D — 36 8 0 All of the combinations shown in the above System Charge table require Advanced Main Air Circulating Fan indoor product."Coil Only"matches are not available for these systems. FOOTNOTES: 1. For applications requiring a TXV,use S1-1TVM"'series kit. 2. A TXV kit must be used with these indoor units to obtain system performance. 3. Systems matched with furnaces or air handlers not equipped with blower-off delays may require blower Time Delay Kit S1-2FD06700224. 4. CF coils cannot be used in horizontal applications. 5. Charge adders shown above do not indicate that coils are rated for every application. Refer to Performance Data Tables for actual performance for specified sys- tem matches.Obtain certified system ratings from www.ahridirectory.orq. CHARGING PROCEDURES: 1. Check the Factory Unit Charge listed on the unit nameplate to verify the refrigerant charge for the outdoor unit,the smallest matched indoor unit,and the 15 feet of interconnecting lineset. 2. Verify the indoor metering device and additional charge required for the specific matched indoor unit in the system using the above table. 3. Add additional charge for the amount of interconnecting lineset tubing greater than 15 feet at the rate specified in Physical and Electrical Data Table. 4. For installations requiring additional charge,weigh in refrigerant for the specific matching indoor unit and actual lineset length. 5. Once the charge adders for matched indoor unit and for lineset have been weighed in,verify the system operation against the temperatures and pressures in the Charging Chart for the outdoor unit.Locate Charging Charts on the outdoor unit and also in the Service Data Application Guide on www.uognet.con1.Follow the Subcool or Superheat charging procedure in the Installation Manual according to the type of indoor metering device in the system,and allow ten minutes after each charge adjustment for the system operation to stabilize.Record the charge adjustment made to match the Charging Chart. 6. Permanently stamp the unit nameplate with the TOTAL SYSTEM CHARGE defined as follows:TOTAL SYSTEM CHARGE=Base Charge(as shipped)+ charge adder for matched indoor unit+charge adder for actual lineset length+charge adjustments to match the Charging Chart. Subject to change without notice.Published in U.S.A. 5390977-YTD-C-0420 Copyright©2020 by Johnson Controls.All rights reserved. Supersedes:5390977-YTD-B-0418 York International Corp. 5005 York Drive Norman,OK 73069 Aib 1 7 155 MAX , HEAT RECOVERY VENTILATOR FILE COPY -tr ENGINEERING DATA LIFEBRERTH THERMALLY CONDUCTIVE,PATENTED DEFROST -- ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams.It is easily removed for cleaning or service. CASE Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to MOTORS AND BLOWERS prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)OD.Balancing ports Each airstream has one centrifugal blower driven by a common PSC motor,with multiple are located on door. fan speed operations. ELECTRONICS FILTERS • The DXPLO2 control included with the unit can be wall mounted in a central location of Washable air filters in exhaust and supply air streams, the home.3 wire 20 gauge(min.)100 ft length(max.). MOUNTING Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and WARRANTY hanging straps supplied with the unit. Units carry a lifetime warranty on the HRV core and a 5 year replacement parts warranty. •OPTIONAL ACCESSORIES: Weather Hood 9-EAG4 9 Terminator Wireless 20/40/60 99-18S g EAG Fitting Min Timer 99-EAGS 99-186 AG 6 99-TM4 99-D ET0 Z 99-187 r/ 99 99-E-EAGB 99-TMS k,, 99 TM6 \ ,y ...._..! IleSi'' LIFEBREATH CONTROL OPTIONS TIMER OPTIONS FEATURES 99-DXPLO2 99-BCO2 99-BC03 99-BC04 99-OETO1-Lifebreath 20/40/60 Minute Timer Initiates high speed Ventilation for 20,40 or 60 5 speed fan operation on each mode ✓ minutes.3 wire connection. 99-DET02 2 speed fan operation(Low/High) ✓ ✓ Wireless Lifebreath 20/40/60 Minute Timer Continuous low speed fan operation ✓ Initiates high speed Ventilation for 20,40 or 60 minutes.Wirelessly connects to main control for Humidity control through adjustable Dehumidistat ✓ ✓ ✓ ease of installation.40'approximate range. Excusive to Lifebreath. Large digital LCD screen ✓ 99-RX02-Wireless Lifebreath Repeater LED status indicator lights ✓ ✓ ✓ Extends range of 99-DET02 Wireless Timers.Plugs into 120V power outlet.Wirelessly connects to Continuous Ventilation ✓ ✓ main control and 99-DEr02.Install at halfway ✓ ✓ point between timer and main wall control if timer Continuous Recirculation is out of range. 20 0N/40 OFF if '' -0N/50 OFF ✓ .,..,�EP x�, a \-:,.. 20 ON/40 Recirculation ✓ ✓ ✓ - ` -. - 20/40/60 min.High speed override button ✓ 99-DXPLO2 99-DET02 Compatible with 99-DET02 Wireless Timer ✓ ✓ V ✓ -I 3 wire connection 1 ✓ ✓ ✓ L IFEBREFI THA No Indoor Air Systems 155MAX(01-01-19) www.lifebreath.com n +.b A. I, 155 MAX ,I. HEAT RECOVERY VENTILATOR i' I fail II PERFORMANCE (HVI CERTIFIED) LIFEeif BREATH ______L____ 0.1(25) 0.2(50) 0.3(75) 0.4(100) 0.5(125) 0.6(150) 0.7(175) ELECTRICAL SPECIFICATIONS IN.W.G.(PA) CFM(Vs) CFM(Vs) CFM(Vs) CFM(Vs) CFM(L/s) CFM(Vs) CFM(Vs)' VAC @ 60Hz 115 Net Supply Airflow 184(81) 163(11) 146(69) 132(62) 115(54) 92(43) 60(28) Watts/Low Speed 66 Gross Supply Airflow 188(81) 166(78) 149(10) 134(63) 117(55) 94(44) 61(29) Watts/High Speed 118 Gross Exhaust Airflow 239(113) 228(101) 212(100) 193(91) 112(81) 150(11) 126(60) Amp Rating 1.4 Sensible Effectiveness(ASE) WEIGHT: @ 59 CFM(28 Us) 32°F(0°C) 84% 1e0 71 LBS(32 KG) Sensible Efficiency(SRE) 160 SHIPPING WEIGHT: @ 59 CFM(28 Us) 32°F(0°C) 15% E 140 73 LBS(33 KG) Sensible Efficiency(SRE) 32°F(0°C) 15% .11 @ 64 CFM(30 Us) 3 120 Sensible Efficiency(SRE) 13°F(25°C) 129° 10o NOTE: @ 64 CFM(30 Us) a Front clearance of 25 in.(635 mm)is eo recommended for servicing unit.All ducts n SAuse 6 in.(152 mm)round collars.Balancing P V; ISO %Grim 660 dampers are located in all air streams. wucrsnu UPS 9001 O ... CERTIFIED mcaie m IIIIIIII 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Static Pressure(in w.g.) DIMENSIONS FRONT VIEW �L., TOP VIEW Filter r/ ' 143/4 in.(315 mm), I Recirculating ()� I� I I Defrost �� r� Camper •illi Removable r.,....,1, � lilt Blower Heat II; g Stale air to outside Recovery _ Blowe eCare �. 5, *Fresh air from outside �i — � z Stale air from inside .r ® ♦ Fresh air to inside I O 6R Ill id In.(152Cella mmrs) I, — 33 5/8 in.(854 mm) I •ca v pate: WARRANTY Contractor: Units carry a lifetime warranty Tag: on the HRV core and a 5 year replacement parts warranty. Project' Qty: Supplier. Engineer. Quote#: ALL units conform to CSA and UL standards I i Control: Submitted By: LIFEBREFI TH I® Indoor Air Systems Timer: Timer Qty: 155MAX(01-01-18) www.lifebreath.com Home I Aquatica True Oruro Duo Freestanding Stone Japanese Soaking Bathtub ��,, Aquatica True Ofuro Duo Freestanding Stone Japanese Soaking Bathtub x****4Reviews 0 Customer photos f, • Color: • na ' Material: 1ti„� = 'r Du•ateX` Lecnoi0 Size: • 1.5x 3625 x337Sin �-� 61,Sx 49.25x 37.25 in • ,, Min * PRODUCT MODIFICATIONS - Therapy Systems o 360 View L�3D Body Position 0 Product Video 1Q�Documentation 0 None.(derault) PRODUCT DETAILS General parameters Exterior dimensions(in) 61.5 L x 49.25 W x 37.25 H Depth to overflow drain(in) 27.75 Product weight(lb) 287 Water capacity(gallons) 155 Shape Unique Product material _ DurateXTM Installation type Freestanding Warranty 25 Year Limited Warranty Other parameters Collection name True Ofuro Country where manufactured EU Product color White Surface finish I Matte Drain placement Center Assembly required No Interior parameters Interior depth(in) 30.25 Interior length bottom(in) 42.25 Interior length top(in) 54.25 Interior width bottom(in) 36 Interior width top(in) 42.25 Project Job Ref. Tekla®Tedds Gross Electric-16'Eave Metal Building 21-84 Section Sheet no./rev. MRH Engineering, P.C. 20 Bayberry Drive Design Calculations 1 Queensbury,New York Calc.by Date Chk'd by Date App'd by Date 12804 MRH 9/15/21 MRH 9/15/21 MRH 5/22/21 Fourdation Design Code Load Combineations (ASD) 1. Dead+Coll+Live FILE COPY \ 2. Dead+Coll+Snow BUI�pIN QUF�ivsbuY 3. Dead+Coll+.75Snow+.45Wind Based o G DEPARTSIVI IT with our n our limited examinati°n r, 4. Dead+Coll+.75Snow-.45Wind comments )c rl Iiance 5. Dead+Coll+.75Snow+.53EQ hilld tcomg the Plans a ndl °f'he CUnstrued - New Y Pliance with the n7dinati oodese of in 6. Dead+Coll+.75Snow-.53EQ Ork State. 7. .6Dead+Coll+.6Wind 8. .6Dead+Coll-.6Wind 9. .6Dead+Coll+.7EQ 10 .6Dead+Coll-.7EQ Foundation A/Al /A2/A2A Design (See Nucor foundation load printout at Col Line A/1,A/9, E/1 and E/2 and foundation plan drawing) 1. Dead+Coll+Live=; 1 +1 +7=5.000; kips 2. Dead+Coll+Snow=; 1 +1 +5=7.000; kips 3. Dead+Coll+.75Snow+.45Wind=; 1 + 1 +.75*5+.45*-4 =3.950;kips 4. Dead+Coll+.75Snow-.45Wind=; 1 + 1 +.75*5-.45*-4 =7.550; kips Governs 5. Dead+Coll+.75Snow+.53EQ=; 1 + 1 +.75*5+.53* 1 =6.280; kips 6. Dead+Coll+.75Snow-.53EQ=; 1 + 1 +.75*5-.53*1 =5.220; kips liVECIEll �r 7. .6(Dead+Coll)+.6Wind=; .6*(1 + 1)+.6*-4 =-1.200; kips 8. .6(Dead+Coll)-.6Wind=; .6*(1 + 1)-.6*-4 =3.600; kips 1111 DEC 2 1 2021 9. .6(Dead+Coll)+.7EQ=; .6*(1 + 1)+.7*1 =1.900; kips 10 .6(Dead+Coll)-.7EQ=; .6*(1 + 1)-.7* 1 =0.500; kips TOWN OF QUEENSBURY BUILDING &CODES d Th Load 7 has a net uplift.The weight of the footer, pier and soil over the footer will be use o res a -lift:- e-total-teeter eeter-a.d soil weight is=footer weight+pier weight+soil weight =;3.33*3.5* 1.0*.15+ 1.17* 1.25*3.5*.15+(3.33*3.50-1.17* 1.25)*3.5*.110=6.440; kips> 1.200kips OK Foundation B/B1 Design (See Nucor foundation load printout at Col Line 1 /B-D and 9/B-D and foundation plan drawing) 1. Dead+Coll+Live=;2+2+9=13.000;kips 2. Dead+Coll+Snow=; 2+2+ 11 =15.000; kips - 3. Dead+Coll+.75Snow+.45Wind=; 2+2+.75*9+.45*-11 =5.800; kips Qgoeessro,4^ 4. Dead+Coll+.75Snow-.45Wind=;2+2+.75*9-.45*-11 =15.700; kips Governs �� �a NtTse'�ycy, 5. Dead+Coll+.75Snow+.53EQ=; 3+2+.75*9+.53* 1 =12.280; kips ° ffr=i q-�Rn 6. Dead+ Snow- 75* 0.4 . 6(DeadC+oColl)75.6Wind=; 6* =;+2)+.6*-119=-4 200;Ikips 11.220; kips min n ri 8. .6(Dead+Coll)-.6Wind=; .6*(2+2)-.6*-11 =9.000; kips 9. .6(Dead+Coll)+.7EQ=; .6*(2+2)+.7*1 =3.100; kips Project Job Ref. •� Tekla©Tedds Gross Electric-16' Eave Metal Building 21-84 MRH Engineering, P.C. Section Sheet no./rev. 20 Bayberry Drive Design Calculations 2 Queensbury,New York Calc.by Date Chk'd by Date App'd by Date 12804 MRH 9/15/21 MRH 9/15/21 MRH 5/22/21 10 .6(Dead+Coll)-.7EQ=; .6*(2+2)-.7*1 =1.700; kips Load 7 has a net uplift.The weight of the footer, pier and soil over the footer will be used to resist the uplift. The total footer and soil weight is=footer weight+pier weight+soil weight =; 3.50*3.50*1.0*.15+ 1.42* 1.17*3.5*.15+(3.5*3.50-1.42* 1.17)*3.5*.110=6.786; kips>4.20 kips OK Foundation C/C1 Design (See Nucor foundation load printout at Col Line 9/01 and 04 and foundation plan drawing) 1. Roof Dead+Coll+Live=;6+6+ 14=26.000; kips 2. Roof Dead+Coll+Snow=;6+6+36=48.000; kips 3. Dead+Coll+.75Snow+.45Wind=; 6+6+.75*36+.45*-21 =29.550; kips 4. Dead+Coll+.75Snow -.45Wind=;6+6+.75*36 -.45*-21 =48.450; kips Governs 5. Dead+Coll+.75Snow+.53EQ=; 6+6+.75*36+.53*1 =39.530; kips 6. Dead+Coll+.75Snow- .53EQ=; 6+6+.75*36+.53*-1 =38.470; kips 7. .6(Dead+Coll)+.6Wind =; .6*(6+6)+.6*-21 =-5.400; kips 8. .6(Dead+Coll)-.6Wind=; .6*(6+6)-.6*-21 =19.800; kips 9. .6(Dead+Coll)+.7EQ=; .6*(6+6)+.7* 1 =7.900; kips 10. .6(Dead+Coll)-.7EQ=; .6*(6+6)-.7* 1 =6.500; kips Load 7 has a net uplift.The weight of the footer, pier and soil over the footer will be used to resist the uplift.The total footer and soil weight is=footer weight+pier weight+soil weight =;6.00*6.00* 1.0*.15+ 1.33* 1.17*3.5*.15+(6.0*6.0-1.33* 1.17)*3.5*.110=19.478; kips>5.40 kips OK Horizontal load= Dead+Coll+Snow=;4+4+23=31.000; kips Governs Horizontal load= Dead+Coll+Snow=;4+4+.75*23+.45*-16=18.050; kips Use 1"dia. hairpins. Hairpin tension load ;31 /(2*.707)=21.924; kips Allowable#8 hairpin tension load=; .79*24 =18.960; kips<21.924 kips No Good Net building lateral load to be resisted by footer friction and grade wall passive restraint=; 31 -18.96*2*.707=4.191; lbs Footer friction(Use.50 friction coefficient)=footer weight+soil=; 19.478*.5=9.739; kips>4.191 kips OK Additional passive grade wall restraint=; .110*4.5*4.5*.5*(3-.33)*6 =17.842;kips Page 1/2 Concrete Footing Design Job: Gross Electric 16'Eave Designed By: MRH Description: Fdn A/A1 Checked By: Time: 4:21 PM 12/17/2021 Program: Spread Footing Design v3.2 Code:ACI 2008 SOIL DATA CONCRETE DATA COLUMN DATA Max. Vert Press. = 3.000 K /Ft ^2 F'c = 3.000 K /In ^2 F'c = 3.000 K /In ^2 Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 14.000 In Density = 100.000 Lb/Ft ^3 Fy = 60.000 K /In "2 Z Dim. = - 15.000 In Phi Angle = 30.000 Deg X Offset = 0.000 Ft Coeff. of Friction = 0.330 Z Offset = 0.000 Ft Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA Ftg. Depth = 4.000 Ft +X,+Z Quadrant = 0.000 K /Ft ^2 FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In COLUMN LOAD DESCRIPTIONS COLUMN LOAD DESCRIPTION 1 Dead + Snow LOAD COMBINATIONS LOAD COMBINATION DESCRIPTION 1 1.4D 2 1.2D + 1.6L + 0.5R 3 1.2D + L + 1.6R 4 1.2D + 0.8W + 1.6R 5 1.2D + L + 1.6W + 0.5R 6 1.2D + L + 1.4E + 0.2R 7 0.9D + 1.6W 8 0.9D + 1.4E 9 1.2D - 0.8W + 1.6R 10 1.2D + L - 1.6W + 0.5R 11 1.2D + L - 1.4E + 0.2R 12 0.9D - 1.6W 13 0.9D - 1.4E UNFACTORED LOADS INPUT COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD Vertical = -2.000 K 0.000 K 0.000 K 0.000 K -5.000 K Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Horizontal X = 0.000 K Z = 0.000 K FOOTING OUTPUT FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY) X Dimension = 3.330 Ft +X Area = 0.003 K /In ^2 +X Area = 0.010 K /In ^2 Z Dimension = 3.500 Ft -X Area = 0.003 K /In ^2 -X Area = 0.010 K /In ^2 Thickness = 12.000 In +Z Area = 0.005 K /In ^2 +Z Area = 0.010 K /In ^2 Max. Press. = 0.651 K /Ft ^2 -Z Area = 0.005 K /In ^2 -Z Area = 0.010 K /In ^2 Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2 Max. Pressure Governing Column = 1, Combination = 2 Footing is Adequate BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis) Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum Moment (+X Area) = 1.827 Ft-K Moment (+Z Area) = 1.880 Ft-K (-X Area) = 1.827 Ft-K (-Z Area) = 1.880 Ft-K Steel Required = 0.907 In^2 (Min) Steel Required = 0.863 In^2 (Min) C:21ElectricA 12/17/2021 Page 2/2 Dist. to Centroid = 3.500 In Dist. to Centroid = 4.500 In Typical Spacings Typical Spacings 9 #3 Bars at 4.500 In. Centers 8 #3 Bars at 4.851 In. Centers 5 #4 Bars at 9.000 In. Centers (Anchor) 5 #4 Bars at 8.490 In. Centers 3 #5 Bars at 18.000 In. Centers (Anchor) 3 #5 Bars at 16.980 In. Centers (Anchor) Steel Distribution in the Short Dim. is Governed by ACI 15.4.4.2 and Spacings Should be Modified Accordingly. QUANTITIES : 17.547 Lbs of Steel and 11.655 Ft^3 of Concrete. C:21ElectricA 12/17/2021 Page 1/2 Concrete Footing Design Job: Gross Electric 16'Eave Designed By: MRH Description: Fdn A2/A2A Checked By: Time: 4:34 PM 12/17/2021 Program: Spread Footing Design v3.2 Code:ACI 2008 SOIL DATA CONCRETE DATA COLUMN DATA Max. Vert Press. = 3.000 K /Ft ^2 F'c = 3.000 K /In ^2 F'c = 3.000 K /In ^2 Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 18.000 In Density = 100.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 15.000 In Phi Angle = 30.000 Deg X Offset = 0.000 Ft Coeff. of Friction = 0.330 Z Offset = 0.000 Ft Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA Ftg. Depth = 4.000 Ft +X,+Z Quadrant = 0.000 K /Ft ^2 FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In COLUMN LOAD DESCRIPTIONS COLUMN LOAD DESCRIPTION 1 Dead + Snow LOAD COMBINATIONS LOAD COMBINATION DESCRIPTION 1 1.4D 2 1.2D + 1.6L + 0.5R 3 1.2D + L + 1.6R 4 1.2D + 0.8W + 1.6R 5 1.2D + L + 1.6W + 0.5R 6 1.2D + L + 1.4E + 0.2R 7 0.9D + 1.6W 8 0.9D + 1.4E 9 1.2D - 0.8W + 1.6R 10 1.2D + L - 1.6W + 0.5R 11 1.2D + L - 1.4E + 0.2R 12 0.9D - 1.6W 13 0.9D - 1.4E UNFACTORED LOADS INPUT COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD Vertical = -2.000 K 0.000 K 0.000 K 0.000 K -5.000 K Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Horizontal X = 0.000 K Z = 0.000 K FOOTING OUTPUT FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY) X Dimension = 3.330 Ft +X Area = 0.002 K /In ^2 +X Area = 0.009 K /In ^2 Z Dimension = 3.500 Ft -X Area = 0.002 K /In ^2 -X Area = 0.009 K /In ^2 Thickness = 12.000 In +Z Area = 0.005 K /In ^2 +Z Area = 0.009 K /In ^2 Max. Press. = 0.651 K /Ft ^2 -Z Area = 0.005 K /In ^2 -Z Area = 0.009 K /In ^2 Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2 Max. Pressure Governing Column = 1, Combination = 2 Footing is Adequate BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis) Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum Moment (+X Area) = 1.307 Ft-K Moment (+Z Area) = 1.880 Ft-K (-X Area) = 1.307 Ft-K (-Z Area) = 1.880 Ft-K Steel Required = 0.907 In^2 (Min) Steel Required = 0.863 In^2 (Min) C:21E1ectricA2 12/17/2021 Page 2/2 Dist. to Centroid = 3.500 In Dist. to Centroid = 4.500 In Typical Spacings Typical Spacings 9 #3 Bars at 4.500 In. Centers (Anchor) 8 #3 Bars at 4.851 In. Centers 5 #4 Bars at 9.000 In. Centers (Anchor) 5 #4 Bars at 8.490 In. Centers 3 #5 Bars at 18.000 In. Centers (Anchor) 3 #5 Bars at 16.980 In. Centers (Anchor) Steel Distribution in the Short Dim. is Governed by ACI 15.4.4.2 and Spacings Should be Modified Accordingly. QUANTITIES : 17.547 Lbs of Steel and 11.655 Ft^3 of Concrete. C:21ElectricA2 12/17/2021 Page 1/2 Concrete Footing Design Job: Gross Electric 16'Eave Designed By: MRH Description: Fdn B Checked By: Time: 12:26 PM 12/19/2021 Program: Spread Footing Design v3.2 Code:ACI 2008 SOIL DATA CONCRETE DATA COLUMN DATA Max. Vert Press. = 3.000 K /Ft ^2 F'c = 3.000 K /In ^2 F'c = 3.000 K /In ^2 Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 17.000 In Density = 100.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 14.000 In Phi Angle = 30.000 Deg X Offset = 0.000 Ft Coeff. of Friction = 0.330 Z Offset = 0.000 Ft Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA Ftg. Depth = 4.000 Ft +X,+Z Quadrant = 0.000 K /Ft ^2 FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In COLUMN LOAD DESCRIPTIONS COLUMN LOAD DESCRIPTION 1 Dead + Snow LOAD COMBINATIONS LOAD COMBINATION DESCRIPTION 1 1.4D 2 1.2D + 1.6L + 0.5R 3 1.2D + L + 1.6R 4 1.2D + 0.8W + 1.6R 5 1.2D + L + 1.6W + 0.5R 6 1.2D + L + 1.4E + 0.2R 7 0.9D + 1.6W 8 0.9D + 1.4E 9 1.2D - 0.8W + 1.6R 10 1.2D + L - 1.6W + 0.5R 11 1.2D + L - 1.4E + 0.2R 12 0.9D - 1.6W 13 0.9D - 1.4E UNFACTORED LOADS INPUT COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD Vertical = -4.000 K 0.000 K 0.000 K 0.000 K -11.000 K Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Horizontal X = 0.000 K Z = 0.000 K FOOTING OUTPUT FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY) X Dimension = 3.500 Ft +X Area = 0.006 K /In ^2 +X Area = 0.021 K /In ^2 Z Dimension = 3.500 Ft -X Area = 0.006 K /In ^2 -X Area = 0.021 K /In ^2 Thickness = 12.000 In +Z Area = 0.011 K /In ^2 +Z Area = 0.021 K /In ^2 Max. Press. = 1.274 K /Ft ^2 -Z Area = 0.011 K /In ^2 -Z Area = 0.021 K /In ^2 Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2 Max. Pressure Governing Column = 1, Combination = 2 Footing is Adequate BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis) Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum Moment (+X Area) = 3.472 Ft-K Moment (+Z Area) = 4.356 Ft-K (-X Area) = 3.472 Ft-K (-Z Area) = 4.356 Ft-K Steel Required = 0.907 In^2 (Min) Steel Required = 0.907 In^2 (Min) C:21ElectricB 12/19/2021 Page 2/2 Dist. to Centroid = 3.500 In Dist. to Centroid = 4.500 In Typical Spacings Typical Spacings 9 #3 Bars at 4.500 In. Centers 9 #3 Bars at 4.500 In. Centers 5 #4 Bars at 9.000 In. Centers (Anchor) 5 #4 Bars at 9.000 In. Centers 3 #5 Bars at 18.000 In. Centers (Anchor) 3 #5 Bars at 18.000 In. Centers (Anchor) QUANTITIES : 18.522 Lbs of Steel and 12.250 Ft^3 of Concrete. C:21E1ectricB 12/19/2021 Page 1/2 Concrete Footing Design Job: Gross Electric 16'Eave Designed By: MRH Description: Fdn C Checked By: Time: 2:26 PM 12/19/2021 Program: Spread Footing Design v3.2 Code:ACI 2008 SOIL DATA CONCRETE DATA COLUMN DATA Max. Vert Press. = 3.000 K /Ft ^2 F'c = 3.000 K /In ^2 F'c = 3.000 K /In ^2 Max. Flexural Press. = 3.000 K /Ft ^2 Density = 150.000 Lb/Ft ^3 X Dim. = 14.000 In Density = 100.000 Lb/Ft ^3 Fy = 60.000 K /In ^2 Z Dim. = 16.000 In Phi Angle = 30.000 Deg X Offset = 0.000 Ft Coeff. of Friction = 0.330 Z Offset = 0.000 Ft Cohesion = 0.000 Lb/Ft ^2 SURCHARGE DATA Ftg. Depth = 4.000 Ft +X,+Z Quadrant = 0.000 K /Ft ^2 FS Uplift = 1.500 +X,-Z Quadrant = 0.000 K /Ft ^2 BASE PLATE DATA FS Overturning = 1.500 -X,-Z Quadrant = 0.000 K /Ft ^2 X Dim. = 0.000 In FS Sliding = 1.500 -X,+Z Quadrant = 0.000 K /Ft ^2 Z Dim. = 0.000 In COLUMN LOAD DESCRIPTIONS COLUMN LOAD DESCRIPTION 1 Dead + Snow LOAD COMBINATIONS LOAD COMBINATION DESCRIPTION 1 1.4D 2 1.2D + 1.6L + 0.5R 3 1.2D + L + 1.6R 4 1.2D + 0.8W + 1.6R 5 1.2D + L + 1.6W + 0.5R 6 1.2D + L + 1.4E + 0.2R 7 0.9D + 1.6W 8 0.9D + 1.4E 9 1.2D - 0.8W + 1.6R 10 1.2D + L - 1.6W + 0.5R 11 1.2D + L - 1.4E + 0.2R 12 0.9D - 1.6W 13 0.9D - 1.4E UNFACTORED LOADS INPUT COLUMN LOAD No. 1 DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOF LOAD Vertical = -12.000 K 0.000 K 0.000 K 0.000 K -36.000 K Moment X = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Moment Z = 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K 0.000 Ft-K Horizontal X = 0.000 K Z = 0.000 K FOOTING OUTPUT FOOTING CHECK SHEAR STRESSES (ONE WAY) SHEAR STRESSES (TWO WAY) X Dimension = 6.000 Ft +X Area = 0.033 K /In ^2 +X Area = 0.088 K /In ^2 Z Dimension = 6.000 Ft -X Area = 0.033 K /In ^2 -x Area = 0.088 K /In ^2 Thickness = 12.000 In +Z Area = 0.038 K /In ^2 +Z Area = 0.088 K /In ^2 Max. Press. = 1.383 K /Ft ^2 -Z Area = 0.038 K /In ^2 -Z Area = 0.088 K /In ^2 Allow. = 0.082 K /In ^2 Allow. = 0.164 K /In ^2 Max. Pressure Governing Column = 1, Combination = 2 Footing is Adequate BOTTOM STEEL DESIGN (Parallel to X Axis) BOTTOM STEEL DESIGN (Parallel to Z Axis) Governing Column = Temp/Shrink Minimum Governing Column = Temp/Shrink Minimum Moment (+X Area) = 35.042 Ft-K Moment (+Z Area) = 32.667 Ft-K (-X Area) = 35.042 Ft-K (-Z Area) = 32.667 Ft-K Steel Required = 1.555 In^2 (Min) Steel Required = 1.555 In^2 (Min) C:21ElectricC 12/19/2021 Page 2/2 Dist. to Centroid = 3.500 In Dist. to Centroid = 4.500 In Typical Spacings Typical Spacings 15 #3 Bars at 4.714 In. Centers 15 #3 Bars at 4.714 In. Centers 8 #4 Bars at 9.429 In. Centers 8 #4 Bars at 9.429 In. Centers 6 #5 Bars at 13.200 In. Centers 6 #5 Bars at 13.200 In. Centers 5 #6 Bars at 16.500 In. Centers 5 #6 Bars at 16.500 In. Centers QUANTITIES : 58.212 Lbs of Steel and 36.000 Ft^3 of Concrete. C:21E1ectricC 12/19/2021