Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
RC-0296-2023
Office Use Onl,ir PRINCIPLII: STRUCTURE PERMIT jVIPLICATI ON Permit#: ' OZ� tQ — 2�L� - Permit Permit Fee: 'Awn of Qiic ens 6ury 742 Bay Road, Queensbury, NY 12804 *Rec Fee:$L�OD P: 518-761-8256 www.queensbury,net Invoice#: Flood Zone? 'i `N )Reviewed By: M F'roject Location: J c_m'' 'Tax Map #:, „J,'G - 6e ' J ,,,,,_Subdivision Narie: *TOWN BD.RESO'...I,ITION385-2020:$1000 recreation fee for n-Ebw dwelling,un is SJrig efamily,duplexes/two-family, multiple family, a i:rartments, condominiums,townhouses, and/or manufact:�red &R modular homes, 6u�not mobile homes.This is in;addition to the permit 'fee(s). I PROJECT INFORi!,+;'8TION: r S`. i Resid,-ntial ,.,,,_Commercial, Proposed Use: I � 3 ` i Single-Family: Two-Family Multi-Farnily(#of units: ) 1. )S:Cu!.,tom 2. _Moelular(REQUIRED:NYSi:,stamped engineered cll,awings of foundatior11 plans) Tc;;rkunhouse ,Garage (#of cars �) __,.._Business Office Retail _)-lotel/Motel Industrial Heated V,+arehouse/Storage Bi..lilding _ 1_Inheated Warehouse/Storage Building Amusement Ride (D-ther(describe: ......_ _ ) MAIN STRUCT!I,JIRE SQUARE FOC;IFAGE: GARAGE SQ!,JiARE FOOTAGE: � 11T floor: �J12 — 11T floor: 2nd floor: pp L 211 floor: 3"floor: _ Total square fret: Basement (habitable space): „r Total square feet; Principle Structure Packet Revised March 2022 ADDITIONAL PROJECT INFORM"VIATION: , 1. Estimated Cost:of Construction: $„ 0 oe) v „� 2. Proposed use of the building: 3. If Commercial cor Industrial, indicate,the name of the business: 4. Source of Heat: Gas Oil Propane �LSolar Other:„ Gil�-��4•�`��i�� (Fireplaces ni!ed a separate Fuel Ellll.lrning Appliances &; it:hiimney Applicatiorii,, one aeraaaliance) 5. Are there any structures not shown on the plot plan?_,.....YES�NO Explair-1,, if yes: 6. Are there any easements on the pi-aperty? YES >< NO 7. SITE INFORMATION: a. What is tht:�dimensions or acreiage of the parcel? b. Is this a corner lot? YES_ NO c. Will the grade be changed as a °r::!sult of the construction? YES '` h'1? d. What is the water source? I"LIBLIC PRIVATE WELL e. What type of wastewater systern is on the parcel?_.....__SEWER_„Z_PRIV,"iT'E SEPTIC DECLARATIC: N: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Ana,,changes to the apprc: ed plans prior to/during construction will require the submittal of airnended plans, additicnal reviews and re-approval 2. if,for any reason;the building permit application is withdrawn,, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initiz I application date, 100's;. of the fee is retained. 3. 1 certify that they application, plans a-id supporting materi,;als are a true and complete statement and/or description of tllex work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinant,,,es, and inconformanc:e with local zoning regulations. 4, 1 acknowledge that prior to occupying tlie facilities proposed I,or my agents,will obtain a certificate of occupancy. 5, 1 also understand that I/we are required)to provide an as-built Survey by a NYS licensed land surveyor ofall newly construct-�d facilities prior to issuance of certificate of occupancy. have read and agree to the abi:i ire: a PRINT NAME: _ _ IV—"04 If SIGNATURE: D/'3 TE: Principle Structure Packet Revised March 2022 CONTACT INFi:')BMATION: PLEA!aE_ PRINT LEGIBLY (";PR TYPE, PLEASE 1 hUCLUDE AN EMAIL • Applicant: Name(s): ___ Ciro 1 ir __. Mailing Address. C/S/Z: .�' a, Cell Phone: `-Iv — - Land Line: Email: c._... y. r�� Primary Qvvrier s : Name(s): Mailing Address; ,w/S/Z: 4 Cell Phone:�„ _ ) _ Land line: Email: El Check if;i:lll work will be pcc,, Formed by property owner only • Contractor.,,11 (List all additional contractors on the back of this fi::)r-m) Contractor Name(s): _U fc Contractor Trad+::! Mailing Addres! C/S/Z: Cell Phone: ��) LI-1-7t--7'7 --Land line: �_)_....._ Email: i �, F': C.C? -a ► "Workeirs' Comp docurn eantation must t&e submitted v;1rith this application" • Arc hitect(s),�lu Business Name:, r o n ,,w10, z�✓tc �L3 _,.,,,_ Contact Name(.sj: e _✓��� , _ Mailing Address, C/S/Z: .x� � ���� . 5 1 Cell Phone: Land line: Email: Contact Person for is:ompliance in rega rds to this project: �I0'41,11 r,.:ell Phone: ,*� -} -q- ._ t :Land Lir .: F.m a i I: b `- r A Li1'_-__L2_ P1' Principle Structure Packet Revised March 2022 CHECKLIST--SINGLE.FAMILY Project: Location:-----��--�'"' REQUIRED—MIETS 1. Building Perri:ii:application, complc-ted YES NO N/A 2. Energy Code inspector's report frorn ResCheck, completed &signed 3. Septic alteration application, if apl:flicable 4. Solid fuel burgling or gas insert apl:Aiance form(s), if applicable 5. Driveway permit, if applicable 6. Structural drawings (3 SETS), incll.;iding: a. Floor pla ns b. Foundation plans c. Cross sections d. Elevations e. Window 8c door schedule f. Natural light,ventilation &emergency egress 7. Plot plan: sh(:n)ping proposed strut to.,ire(s)with setback,,dimensions from all surveyed prc:gperty lines 8. Electrical inspieyction agency select+:!-d 9. Manual S &J 10. HRV or ERV 11. Kitchen Hoc:-c:l specs, if necessary CHECKLIST--MULTI•'I)WELLING/COMMEFCt,::lAL Project Location: ,••••_ REQUIRED- 2 SIE"T'S 1. Building Perrnii:application, completed YES NO N/A 2. Energy Code inspector's report frcyrn ComCheck, comp'Is ted &signed 3. Septic alteration application, if applicable 4. Solid fuel burning or gas insert apl::aIiance form(s), if applicable 5. Driveway pergnit, if applicable 6. Structural drawings, including: a. Floor plans b. Foundation plans c. Cross sections d. Elevations e. Design Icaeds including floor, snow &wind load f. Seismic design g. Plans su rged and sealed by registered architect or,engineer h. Window' & door schedule 7. Plot plan: shc:rlwing proposed structaure(s)with setback ci imensions from all surveyed prciperty lines 8. Electrical insl:iection agency selectedi 9. FINAL AS-BUILT PLANS SUBMITTEiI) ELECTRONICALLY Principle Structure Packet Revised March 2022 NATUR1kL. LIGHT, VENTIL.�4.TION & EIVIERG'ITNCY EGRESS CJkli,CULATION SHEET (please::' complete if detail.:., .are not provided (;:rn plans) 1L Project Locatirai r7: Primary Owner (s): Habitable Sq. Ft. Required Actual equired iNctual Sq. ft. Rooms of Light Light %fin.rntilation W!,ntilation opening Roc:Inn (8% of rm.) (sq. ft. 4IX, of room �lfs . ft. for Egress 'V 14Z' Jr Principle Structure Packet Revised March 2022 Office Use Only Permit#: Ibmi of CLucensbun Permit Fee:$ ,•,,,- 742 Bay Road,Queensbury,NY 12804 P:518-761-8256www.aueensbury.net Invoice#: Flood Zone? Y N1 Reviewed By: SEPTIC D1:3FPOSAL PERMIT APPLICATION Project Loa�Iltiion: --U � ` •, Tax Map #•,.,., 26 1 (a— � RESIDENCE INFOIllMATION: Year Built Gallons #of bedrooms: X gallons per =total daily flow per d,a�, kaedroom Garbage Grinder Yes _._ 1980 or older 150 Installed? (circle one) Spa or Hot Tub Yes No 1981-1991 130 Irisrtalled? (circle one) 1992-Present 110 PARCEL INFORMi,i!JION: Topography _ "",_Flat Rolling Steep Slope %Slope Soil Nature Sand ��Loam __Clay Other, explain: Groundwater At what clei th? Bedrock/Impervious At what clelpth? material gi Domestic Water Su1:;,1:ily ,�<Aunici:,:)al _Well _Lake (if well or lake,water supply front any septic system absorption is ft.) Percolation Test Rate: _,__per minute per inch (test to be completed by a licensed engineer/architect) PROPOSED SYSTEAVI INFORMATIOI@II: Tank size 114D I;:allons (min. size 1,0(:)0 gallons,add 250 gallons for each garballe cylinder or spa/hottub System Absorption field w/#2 stoney Total length `ZOO_ft.; Each Trench 5L,' ft. Seepage Pit w/#3 stone How many: Size: Altern:.itive System Bed or other type::._ Holding,Tank System Total required capacity? : tanksize #of tanks IMOTES: 1. Alarm system and associates electrical work mii.iist be inspected by a Town approved electrical inspection agency;.'., We will no longer allow systems to be covered until such time as an as-built plan is received and apprc,k,,ed. The installed s,I/stem must match I;,he septic layout on file—no exceptions. 3. As- Liuilt drawings mull: be submitted prior to the inspection, if there has been a change to the submitted I:alans. Principle Structure Packet Revised March 2022 CONTACT INF(,)R_MATIONPLEA!;I::: PRINT LEGIBLY f.;M TYPE, PLEASE 11',I(:LODE AN EMAIL ❑ Check if ,;Ill work will be pi,,irformed by propj;nty owner only • Contractor: :ontact Name(s):_...� CGr/ 1C cd(/r� ;> w `"D (I _ i Contractor Trade: W Mailing Address,-C/.:.iZ: - (:ell Phone: _( �) �] L�l—�� _ Land Lune: _( ) (U pan ....._ _ "Workers' (::omP documenl::ation must be submitted with„i his application" • En ineer s 1"Jame(s): N11ailing Address, C/':,/Z: (*ell Phone: _( _) Land Lune: _( ) I.;rnail: (.ontact Person for Compliance in regards to this project: (:ell Phone: �_....) Land Line: I::rnail: �~ IDeclaration: Any pt-:1-mit or approval granted which is based upon or is granted in reliance upon any material representation orfaik.ire to make a material fact or circumstance known by or on be!half of an applicant, shall be �,+oid. I have read the regulations and agrer::!to abide by these and all requirements of-the Town of Queensbury Sanitary Sewage Dispc)sal Ordinance. PRINT NAME: / ✓rlPc �--- DATE: Principie Structure Packet Revised March 2022 ,�r7`7 n Of Qu nsbury David Duell Hi:;:Jimay Superintendent Highway 518-761-8212 Departn'Ient Mark De Mers '742 Bay Road—Quee:nsbury, NY '•" ._._-»- Deputy :£lghway Superintendent 12801 --��' Phone: (518) 76-1-8211 518-761-8210 Fax: (518) 745-1466 DRIVl:WAY PERMIT°' 14PPLICANT NAME: 1"E:LEPHONE NO.: 1,..� 7211 7L.._ k.DDRESS TO INSPE(::"f': i Lj e:sf Ct 1:2.ETURN ADDRESS 81. EMAIL: 4 .....1��7 It. � r:—j—_�C(�-�-' C�✓�� � � ,Applicant must show exact location and k,ddth of driveway(s)to connect to the hic11,-iway by I:afacing stakes at the ::specified location. '1"he Superintendent of Highways of the T(Wn of Queensbury I-as reviewed this application. The f'r:)llowing action taken: �.`)TEP 1: O Prcli:minary Approval I\IEED: O Sli,jht swale O De,+!p swale O Le,.,el with the road O Level with the top of th : paved wing ";ize culvert pipe to UaSe (if necessary) i;: ;► 12" O 15" 18" O 24" ( ;1 36" I:Ireliminary inspecticr,, completed by: ...... Date: ..,, Approval by Highway Supt: _..._ (or) Deputy Supt: _ IlJlpon completion, p1lease resubmit Otis approved permiit for a final approval. ':aTEP 2: O Firial Approval O Re.jected I)ate: I*)avid Duell, Highway Superintendent Mark De Mers, Deputy Highway Superintendent /21/2022 Revised Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) Two (2) full sets of plans Over 1,500 sq. ft. requires engineering stamp Design loads on plans: 115 Wind Floor Loads 40 psf �j (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf t Calculations Decks 40 psf Wind design for lake front properties Window schedule with glass size & main doors/Air leakage < .5 cfm for doors, < .3 cfm for windows/Tempered glass in bathrooms Door schedule/Main entrance 36" door Emergency Escape or Bedrooms & Habitable Space Above-grade: 5.7 sq. ft. Grade: 5.0 sq. ft. fj 24" (h) x 20" (w) minimum 44" maximum height above door \ Window control devices 24" or less 2nd story or 72" above grade Egress window from basement 5.0 sq. ft. Floor system sizing per table 502.3.1 -t1 Residential check ERI or Prescriptive method Driveway length: 300' or more-12' width required/500' or more,turnaround required Aj Foundation drainage on plans, if required -iS 6" drop in 10' exterior grade Framing cross section for each roof line, vertical fire stopping every 10' where required/joist spans pg. 127 t/ Ice & snow shield—24"from exterior wall Platforms at exterior doors Stairway headroom 6'8"; all stairs 36" width Stair run and rise Winder run and rise Spiral stairs meet requirements Smoke detectors—battery backup & proper location, interconnected Bathroom fixtures—proper clearance Hall width-36"width Handrails more than four risers on open sides Railing &guards >30"/basement stairs included/closed risers more than 4" in height Safety glazing notes for required areas Garage fire separation: %" gable end/5/8" under living space &Y2" on walls/20 min. door and closer Garage floor sloped Attic access: gasket seal & R-value equal to roof insulation kW Roof over 30"—22" x 30"/Crawl spaces 18" x 24" access Continued on back 4 4 Residential Plan Review Revised October 2021 XZ ----r—. -� "'" ='= 155MAX -=:�-- Z =W W W.L 1 F E B R E AT H.C O M HEAT RECOVERY VENTILATOR ENGINEERING DATA Performance (HVI certified) THERMALLY CONDUCTIVE,PATENTED ALUMINUM CORE Netsuppiy airflow in cfm(L/s)againstextemal static pressure The counter-flow heat recovery core transfers heat between the two airstreams.It is easily External Static Pressure Airflow removed for cleaning or service. MOTORS AND BLOWERS @ 0.1in(25 Pa) 184 cfm (87 L/s) Each airstream has one centrifugal blower driven by a common PSC motor,with multiple @ 0.2 in(50 Pa) 163 cfm (77 L/s) fanspeed operations. @ 0.3 in(75 Pa) 146 cfm (69 L/s) FILTERS @ 0.4 in(100 Pa) 132 cfm (62 L/s) Washable air filters in exhaust and supply airstreams.MOUNTING THE HRV @ 0.5 in(125 Pa) 115 dm (54 L/s) Threaded inserts at corners of the cabinet designed to accept the"S"hooks and hanging @ 0.6 in(150 Pa) 92 cfm (43 L/s) straps supplied with the unit. @ 0.7 in(175 Pa) 60 cfm (28 L/s) DEFROST Recirculating damper defrost system. Max.Temperature Recovery 86% CASE 20 gauge prepainted galvanized steel for superior corrosion resistance,insulated to prevent Sensible Effectiveness(ASE) exterior condensation.Drain connections:Two 1/2 in(12 mm)OD.Balancing ports are @ 59 cfm(28 L/s) 32-F(0-C) 84% located on unit. Sensible Efficiency (SRE) ELECTRONICS @ 64 dm(30 L/s) 32-F(0-C) 75% Control included with the unit can be wall mounted in a central location of the home.3 wire Sensible Efficiency(SRE) 20 gauge(min_)100 ft length(max.).CONTROL @ 64 din(30 L/s) 13'F(-25'C) 71%99-DXPL02 Lifebreath Digital Control VAC @ 60Hz 115 • 5 speed operation on each mode Watt/Low speed 66 • 5 user selectable operational modes:Continuous Ventilation,Continuous Watt /High speed 118 Recirculation,20 ON/40 OFF,10 ON/50 OFF,20 ON/40 Recirculation • Compatible with 99-DET02 Wireless Timers Amp rating 1.4 • Humidity control through adjustable Dehumidistat Sensible Efficiency:Thermal • 20/40/60 High speed override button • 3 wire connection Effectiveness:Based on temperature differential b tween the 2 airstreams TIMER OPTIONS Efficiency:Takes into account all power inputs 99-DETOI Lifebreath 20/40/60 Minute Timer-Initiates High speed Ventilation for 20,40 or 60 minutes.3 wire connection. 200 -- — --- 99-DET02 WIRELESS Lifebreath 20/40/60 Minute Timer-Initiates High speed Ventilation for 20, 180 5 40 or 60 minutes.Wirelessly connects to main control for ease of installation. 40' 16 approximate range. 3 99-RX02 WIRELESS Repeater-Used to extend range of 99-DET02 Wireless Timers. Plugs into 140 2 120V power outlet. Wirelessly connects to main control and 99 2.Install at 12 halfway point between timer and main wall control if timer is t of ran 1 0100 ACCESSORY OPTIONS a 80 99-163 Duct Heater w/Electronic SCR Thermostat-1 kW,6 in(1 mm). 0)0 60 99-186 Weatherhoods-Two 6 in(152 mm). 20 WEIGHT 71 lbs(32 kg)SHIPPING WEIGHT 73 lbs(33 kg) 00 0.1 0.2 03 0.4 0.5 0.6 0.7 0.6 Static Pressure(in w.g.) DIMENSIONS 155MAX o sus v, ISO Fresh Air Stale Air 9001 From Outside From Inside =- -- CERTIFIED aerstean nrHf&.exr,n Recirculating dl Filter 4 14 3/4 In(375 mm Defrost Damper Note:Front WARRANTY • clearance of 25 in Removable _ _.' Blower as (635 mm)is Heat `+ recommended for Units cam/a lifetime warranty on the HRV core Recovery Motor a servicing unit All and a 5 year replacement parts warranty. Core ' ducts use 6 in(152 Stale r Fresh m mm)connections. Air To a - "--" 0 Air To 3 NOTE:All specifications are subject to change without notice. Outside Inside 0 All units conform CSA and UL standards 33 5/8 in(854 mm) Condensate Drain Front view Sideyjgyy 1�1t�11'�cJGYI Date: Contractor: Tag: Qty: Supplier: Project: Quote#• Engineer: Submi ed By: AOPNAVGenerated by REScheck-Web Software Ln ko M W n Co Compliance Certificate ° * � Ln � ( = � ;-n UAf c S. Project Cerrone Builders �� � v a, c� BILE C °' _ Energy Code; "; � Location: .,lens Falls, New York ia Construction Type: dingle-family A Project Type: New Construction ; o Conditioned Floor Area: 2,676 ft2 O Ln N Glazing Area 3.4% � -n �p O Climate Zone: 6 (7635 HDD) ` Permit Date: � N t O Permit Number: W Construction Site: gAgent: Designer/Contractor: 98 West Mountain Rd REVIEWED Daniel W. Ryan P.E. f?ueensbury, NY 12804 COMPLIANCE PO Box 1386 ENERGY CODE Nokomis, FL 34274 518-742-9559 dryan@dwrpe.com Compliance: 0.3% Better Than Code Maxin•u rn UA: 367 Your UA: 366 The%Better or Worse Than Co:ie Index reflects how close to ce,rpllance the house Is based on rode trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Gross Are' C c0int. 1 , . . Prop. -Factor U-Fa UA UA eter Ceiling: Raised or Energy Truss 1,434 49,0 0.0 0.0.20 0,026 29 37 FF Walls: Wood Frame, 16" o.c. 1,548 21.0 0.0 0,057' 0,045 74 58 Door 2: Solid Door(under 50%glazing) 18 0.140 0.300 3 5 Door 3: Solid Door(under 50%glazing) 18 0.240 0.300 4 5 Door 1: Glass Door(over 150%glazing) 34 0.240 0.300 8 10 Window:Vinyl Frame 186 0.290 0.300 54 56 5F Walls: Wood Frame, ii6" o.c. 1,504 23-0 0.0 0,057 0.045 76 60 Window:Vinyl Frame 163 0.29'I 0.300 47 49 Bonus Rim Floor:All-Wood Joist/Truss 340 38.0 0.0 0.026 0.033 9 11 Basement Wall Unfin: Solid Concrete or Masonry Wall height: grade: 6.r.•i' Depth below grade: 1,342 0.0 19.0 0.040 0,050 52 65 Insulation depth: 7.8' Window 1: Vinyl Frame 3 0.400 0.300 1 1 Window:Vinyl Frame 32 0.290 0.300 9 10 Project Title: Cerrone Btjilders Report date: 05/30/23 Data filename: Page 1 of 10 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requ ements listed in the RE:Scheck Inspection Checklist. Daniel W. Ryan P.E. � !�/'�<�"7/ 5/30/23 Name-Title Signature Date ENGINEERS STAMP: OF N/�Ij/kp V. w or s s; Project Title: Cerrone Builders _ Report date: 05/30/23 Data filename: Page 2 of10 REScheck Software Version : REScheck-Web AV Ino.!Na,pection Checkli ;t Energy Code: 2018 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed, Where compliance is itemized in a separate table, a reference to that table is provided. section — F�ilans Verified Field Verified # Pre-Inspection/Plan Review Value Vxilue Complies? Comments/Assumptions St Req•iD --� - __ .. 103.1, 'Construction drawings and i ❑Complies :1.03,2 'documentation demonstrate i❑Does Not [F'R1]1 ;energy code compliance for the ❑Not Observable � building envelope.Thermal envelope represented on i❑Not Applicable _ construction documents. 103.1, ,Construction drawings and ❑Complies 103.2, documentaticm demonstrate ❑Does Not 403.7 energy code compliance for [F'R3]1 lighting and mechanical systems. ` ❑Not Observable ;Systems ser rig multiple :❑Not Applicacde ;dwelling units must demonstrate ;compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ;❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA G7aling: j Cooling: Manual j or ot!rner methods Btulhr ; Btu/hr ❑Not Observable by the code official. ❑Not Applicable r . Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact:(Tier 3) Project Title: Cerrone Builders - Report date: 05/30/23 Data filename: Page 3 of10 Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions r Req.ID 402.1.1 'Conditioned !basement wall R _ R- ;❑Complies See the Envelope Assemblies [F04]1 insulation R-value.Where Interior' R.� R_ ❑Does Not table forvalues. Insulation is used,verification may need to occur during ❑Not Observable Insulation Inspection. Not ;❑Not Applica';ae required in warm-humid locations; I in Climate Zone 3. 303.2 Conditioned ::easement wall _ ❑Complies [FOS]1 insulation installed per ❑Does Not manufacturer's instructions. ❑Not Observable ;❑Not Applicable 402.2,9 Conditioned'basement wall ft ftV ;❑Complies See the Envelope Assemblies [FOG]' insulation depth of burial or ❑Does Not table for values. distance from top of wall. []Not Observable ❑Not Applicable 303.21 A protective covering is installed `~ ❑Complies [FO11]2 to protect exposed exterior ❑Does Not insulation and extends a ❑Not Observable minimum of 6 in, below grade. _ ❑Not Applicable 403,9 1Snow-and 4ce-melting system ❑Complies [F012]2 controls installed. ;DDoes Not I ❑Not Observable _ -- w- ❑Not Applicable .014ditional Comments/Assumptions: High Impact(Tier 1) 2 Medium Impact Cl ier 2) 3 Low impact(Tier 3) Project Title: Cerrone Builders _ Report date: 05/30/23 Data filename: Page 4 of10 !3ection � Plans Verified Field V�arified # Framing /Rough-in Inspection Complie Comments/Assumptions �5� Req.iD Value Value 402.1.1, Door U-factor. U- U- '❑Complies jSee the Envelope Assemblies 402.3.4 -� ❑Does Not 'table for values. [FR111 j ;❑Not Observable s __ ! ;Mot Applicable 402.1.11 Glazing U-far-tor(area-weighted U U- ❑Complies T�See the Envelope Assemblies 402.31, average), i lDoes Not 'table for values. 402.3.3, i 402.5 i ;❑Not Observable [FR2]1 i ;❑Not Applica%le 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance '❑Does Not with the NFRC test procedure or taken from the default table. ❑Not Observable _ ❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier � ❑Complies [FR23]1 installed per rn.anufacturer's ❑Does Not Instructions. !❑Not Observable ❑Not Applicable ' 402.4.3 Fenestration that is not site built y ❑Complies [FR2011 'is listed and aibeled as meeting ❑Does Not ;AAMA/WDMA/CSA101/I.S.2/A440, i or has infiltration rates per NFRC ❑Not Observable i400.that do riot exceed code ❑Not Applica'cJe limits. 402.4.5 IC-rated recessed lighting fixtures _ 'OComplies [FR16]2 sealed at ho:.ising/interior finish ❑Does Not and labeled to indicate z2.0 cfm leakage at 75 Pa. `.❑Not Observable ::[]Not Applica'Ole 403,3.1 Supply and return ducts in attics ;� ❑Complies [FR1211 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= 1 R-6 where< 3 inches. Supply and ;❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for ' diameter>= :3 inches and R-4.2 , for<3 inches in diameter. ,1103.3.2 Ducts, air handlers and filter ❑Complies [.FR13]1 boxes are sealed with '❑Does Not Joints/seams compliant with International Mechanical Code or ❑Not Observable International Residential Code, as ❑Not Applica:ale applicable. 403.3.5 Building cavities are not used as '❑Complies [FR15]3 ducts or plenums. ❑Does Not ' i❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact('tier 2) 3 Low Imparcl:(Tier 3) Project Title: Cerrone Builders Report date: 05/30/23 Data filename: Page 5 of10 Section Ftllans Vered Field Verified # Framing /Rough-In Inspection W Value Value Complies? Comments/Assumptions Se Req.ID 403.3.7 Ducts declare' to be within the !❑Complies rFR2813 conditioned slpace are either 1) ❑Does Not \ completely within the continuous ' air barrier and within the building i❑Not Observable :thermal envelope, 2) buried <DNotApplicable ;within ceiling insulation in i ;accordance with Section R403.3,6 and the air handler is located completely within the continuous air barrier and within ;the building thermal envelope and the duct leakage is <= 1.5 cfm/100 square feet of conditioned floor area served by j the duct system, or 3) the ceiling 'Insulation R-value installed Against and above the insulated duct >=to the proposed ceiling ;insulation R-value, less the R- value of the insulation on the _ 403.4 „HVAC piping conveying fluids R- _ R- ❑Complies r.F R17]2 above 105 4F or chilled fluids _ ❑Does Not L j below 55 4F are insulated to z-R- 3. I []Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC _ ❑Complies rFR2411 piping. ❑Does Not ❑Not Observable ❑Not Applicable 403,.5.3 Hot water pipes are insulated to R- R- ;❑Complies [FR18]2 :❑Does Not ❑Not Observable _ _ ^ Thot Applicable 403.6 Automatic or gravity dampers are ❑Complies rFR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. '❑Not Observable ❑Not Applicable .additional Comments/Assumptions: �t i 1 High Impact(Tier 1) Medium Impact(Tier 2) 31Low Imp��ci:(Tier 3) Project Title: Cerrone Guilders Report date: 05/30/23 Data filename: Page 6 of10 Section _ F�ia ns Verified Field Verified # Insulation Inspection Com lies"� Cts/Assum tions 5c Reg.ID p Value Val ommen ue p -� p 303.1 �AII installed insulation Is labeled ❑Complies EIN1312 -orthe installedj! R-values ❑Does Not provided. '❑Not Observable _ ❑Not Applicable 402.1.1, Floor insulation R-value. R- _ R- ❑Complies ;See the Envelope Assemblies -402.2.6 ❑ Wood `❑ Wood ;❑Does Not table for values. rlN111 ❑ Steel ;❑ Steel ![:]Not Observable ;❑Not Appllca')le 303.2, Floor insulation installed per ❑Complies 402.2.8 manufacturer's instructions and ❑Does Not CIN211 ;In substantial contact with the underside of the subfloor,or floor ❑Not Observable framing cavity insulation is in ❑Not Appiicacle contact with ti^ne top side of ;sheathing, or continuous insulation is installed on the underside of floor framing and I extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulationR-value. If this is a R- R. ;❑Complies See the Envelope Assemblies 402.2.5, mass wall wilt at least'/z of the ❑-Wood ❑ Woo, �❑Does Not table for values. 402.2.6 wall insulation,on the wall ❑ Mass ❑ Mass [IN3]1 exterior,the exterior insulation ❑Not Observable f !requirement applies (FR10}, ❑ Steel ❑ Steel ❑Not Applicaide 303.2 ;Wall insulation is installed per �� ❑Complies [IN4]1 manufacturer's instructions. !❑Does Not 1 ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low impact(Tier 3) Project Title: Cerrone Builders Report date: 05/30/23 Data filename: Page 7 of10 Sec, Plans Verified Field Verified ' # Final Inspection Provisions Value ValueComplies? Comments/Assumptions & Re .ID 402.1.1, 'Ceiling insulation R-value, i R- R- ❑Complies ;See the Envelope Assemblies 402.2.1, [� UVood ❑ wood ❑Does Not table for values. 402.2.E ❑ Steel j Steel ❑Not Observable (Fill' '. ;❑Not Applicable 303.1.1.1,'Ceiling insulation installed per ;❑Complies 303.2 •manufacturer's instructions. ❑Does Not [FI211 iBlown insulation marked every 300 ft2. '❑Not Observable i❑Not Applicable 402.2.3 'Vented attics with air permeable ❑Complies [F12212 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. �❑Not Observable ❑Not Applicable Att 462.2.4 ; ic access hatch and door R- R- _ ❑Complies �V [F-13]1 insulation aR••value of the ❑Does Not adjacent assembly. ❑Not Observable ;❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 ❑Complies [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable _ I❑Not Applicable 403.3.3 Ducts are pressure tested to _ _cfm/100 rFm/100 ❑Complies [FI271' determine air leakage with ft2 ft2 ;❑Does Not either: Rough-In test:Total 'leakage measured with a []Not Observable pressure differential of 0.1 inch 1❑Not Appiicahale �w.g, across the system including 'the manufacturer's air handler enclosure if installed at time of I ;test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch Iw.g. across the entire system including the manufacturer's air handler enclosure. 403.3.4 'Duct tightness test result of<=4 cfm/100 cfrn/100 ❑Complies (FI4]1 cfm/100 ft2 across the system or ft' ft2 ElDoes Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests, verification may need to :❑Not Applicable occur during Framing Inspection. 403.3.2.1 Air handler leakage designated ❑Complies [F124]1 'by manufacturer at<=2%of ❑Does Not design air flare. ❑Not Observable ❑Not Applicable 403.1.1 'Programmable thermostats ❑Complies [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to !❑Not Observable code specifications. i❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10]2 I on heat pumps. ❑Does Not Mot Observable ;ONot Applicable 403.5.1 'Circulating service hot water ❑Complies .Fill]2 ;systems have: automatic or :❑Does Not accessible manual controls. r❑Not Observable ❑Not Applica'rle 1 High Impact(Tier 1) _ 2 Medium Impact(1 ier 2) 3 'Low Impart:(Tier 3) Project Title: Cerrone Builders Report date: 05/30/23 C)ata filename: Page 8 of10 section - - -- Vlans Verified Field Verified Final Inspection Provisions Complies? Comments/Assumptions tions do Req.ID Value Value p 403.6.1 `All mechanical ventilation system' ❑Complies [F12512 fans not part of tested and listed ;❑Does Not HVAC equipment meet efficacy and air flow limits per Table ❑Not Observable R403.6.1. ❑Not Applicable 403,2 Hot water boilers supplying heat '�- ❑Complies [F126]2 ;through one-or two-pipe heating ' j❑Does Not i systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature.._ 403.5.1.1 Heated water circulation systems - ❑Complies [F12812 j have a circulation pump.The ❑Does Not ?system return pipe is a dedicated return pipe or a cold water supply' i❑Not Observable pipe. Gravity and thermos- ❑Not Applica'::le syphon circulation systems are not present. Controls for :circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water�s in circulation loop is at set-point temperature and no demand for hot water exists. 403.5 1.2 °Electric heat trace systems :❑Complies [FI20 comply with IEEE 515.1 or UL ;❑Does Not 515. Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the 1, '❑Not Applicable desired water temperature in the piping .103.5.2 Demand recirculation water '❑Complies [F130]2 systems have controls that I ❑Does Not manage operation of the pump and limit the temperature of the t❑Not Observable water entering the cold water ❑Not Applicable piping to <= L044F. 403.5.4 Drain water heat recovery units - `❑Complies [FI31]2 tested in accordance with CSA 'E]Does Not 1355.1. Potable water-side pressure loss of drain water heat ❑Not Observable recovery units < 3 psi for ❑Not Applicable individual ur.i s connected to one or two showers. Potable water- ,side pressure loss of drain water ' heat recovery units< 2 psi for Individual units connected to three or more showers. 404.1 ;90%or more of permanent - '•,❑Complies [FI611 Mixtures have high efficacy lamps. :]Does Not ❑Not Observable ❑Not Applicable 404.1.1 Fuel gas lighk:!ng systems have ;❑Complies [F12313 no continuous pilot light. `❑Does Not ;❑Not Observable ❑Not Applicable 401.3 Compliance certificate posted. ❑Complies [F1 7]2 ❑Does Not '❑Not Observable _ - ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Cerrone builders _ Report date: 05/30/23 Data filename: Page 9 of10 erection .._ plans Verified Field Verified # Final Inspection Provisions � Complies? Comments/Assumptions 4S Re .ID Value Value 303.3 `Manufacturer manuals for OComplies EF-11813 mechanical and water heating Opoes Not j systems have been provided. ONot Observable ONot Applicable ,Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact:(Tier 3) Project Title: Cerrone Builders � Report date: 05/30/23 Data filename: Page 10 of10 2018 IECC Energy ficie cy Certificate Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 38.00 Ceiling /Roof 49.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.24 IN Heating System: Cooling System:__ Water Heater• Name: Date• Comments Manual S Compliance Report Job: 98 west mntrd Date: Jun 07,2023 Entire House By: Plan: 1822 Project Information r: cerrone builders Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 38104 Btuh Entering coil DB: 75AOF Outdoor design WB: 71.0°F Latent gain: 6040 Btuh Entering coil WB: 62.7°F Indoor design DB: ' 75.0°F Total gain: 44144 Btuh Indoor RH: 50% Estimated airflow: 2038 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: York Model: YCJD42S43S4+CX420B(6,9)35+T*(8,L)V*C16 Actual airflow: 1260 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 119839 Btuh Entering coil DB: 65.2°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9T100C16MP11 Actual airflow: 1260 cfm Output capacity: 96000 Btuh 80% of load Temp. rise: 50 OF Meets are all requirements of ACCA Manual S. 2023-Jun-07 10:07:22 wrightSOW Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACC% ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Residential � - Review- Form ��^A • - • RIPER 1 ACCK. (Loads, 15 Mar 09 ro-c ,gamamrsaa� queensbury ny Header Information Contractor: REQUIRED ATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes iJ No Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes 0 No OEM performance data(heating,cooling,blower): Yes M No Building plan#: 1822 Manual D Friction Rate Worksheet: Yes No ❑ Duct distribution sketch: Yes ❑ No ❑ Home address(Street or Lot#,Block,Subdivision): Entire House HVAC LOAD CALCULATION Design Conditions Building Construction Information Winter Design Conditions Building Outdoor temperature: -4 °F Orientation: Front Door faces North Indoor temperature: 68 'F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 119839 Btuh Number of bedrooms: 3 Conditioned floor area: 6171 ft2 Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 *F Indoor temperature: 75 °F Windows Root Grains difference: 27 gr/lb C O% RH Eave overhang depth: 0 ft Sensible heat gain: 42337 Btuh Internal shade: none Latent heat gai : 6712 Btuh Blinds,drapes,etc. Depth Window Total heat gain: 49049 Btuh Number of skylights: 0 EQUIPMENT • 40 Heating Equipment Data Cooling Equipment Data Blower Data E7uipment type: Gas furnace E(Vigment type: SplitAC Heating cfm: 1260 umace,Hea pump,Boiler,etc. Ir onditio%p Heat pump,etc. Cooling cfm: 1260 Model: York Model: York Static pressure: 0 in H2O TM9T100C16MP11 YCJD42S43S4 Fan'a rated external static pressure for design airflow Heating output capacity: 96900 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity atwinterdesignoudoorconditions Sensible cooling capacity: 0 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh DISTRIBUTIONHVAC DUCT •1 Design airflow: 1260 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure(ASP): 0 in H2O Friction rate: ((t� in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TELx 10�5) I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved *Home qualifies for MJ1AE Form based on Abridged Edition Checklist �- wrightSOW Right-Suite®Universal 2017 17.0.16 RSU25116 mntrd Project SummaryJob: Jun 07,2023 Date: Jun 07,2023 Entire House By: Plan: 1822 Prooect Information For: cerrone builders Notes: Desian Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 OF Outside db 85 OF Inside db 68 OF Inside db 75 OF Design TD 72 OF Design TD 10 OF Daily range M Relative humidity 50 % Moisture difference 27 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 113056 Btuh Structure 36289 Btuh Ducts 6783 Btuh Ducts 1814 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 119839 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 34293 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 6040 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Heatin Cooling (none) Area(ftz 6171 6171 Equipment latent load 6040 Btuh Volume(ft') 49368 49368 Air changes/hour 0.70 0.40 Equipment total load 40334 Btuh Equiv.AVF (cfm) 576 329 Req. total capacity at 0.70 SHR 4.1 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade ADP Model TM9T100C16MP11 Cond YCJD42S43S4 AHRI ref 2008690 Coil CX420B(6,9)35+T*(8,L)V*C16 AHRI ref 6496304 Efficiency 96AFUE Efficiency 11.0 EER, 14 SEER Heating input 100000 Btuh Sensible cooling 26460 Btuh Heating output 96000 Btuh Latent cooling 11340 Btuh Temperature rise 69 OF Total cooling 37800 Btuh Actual air flow 1260 cfm Actual air flow 1260 cfm Air flow factor 0.011 cfm/Btuh Air flow factor 0.033 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.86 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri htsoft' 2023-Jun-07 10:age I g Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCP. ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 98 west mnt rd Entire House Date: Jun 07,2023 El Plan: 1822 MANUAL J:7th Ed. 1 Name of room Entire House Room1 Room2 Room3 2 Length of exposed wall 835.0 ft 172.0 ft 172.0 ft 10.0 ft 3 Room dimensions 1.0 x 1284 ft 1.0 x 1284 ft 3.0 x 7.0 ft 4 Ceilings Condit. Option 8.0 ftj d 8.0 ft heat/cool 8.0 fti heat/cool 8.0 ft 1 heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg I Cig (ftz) Htg I Clg (ft� Htg Clg (ft2) Htg Clg (ft) Htg Clg 5 Gross a 12E3 5.4 1.0 6680 **`* *`*« 1376 ""`" `"*' 1376 80 Exposed b 0 0 1!!!!I '••• •*<" Mill ••«« ,«< III!!I •«** •*" 1(!I!! •,•* *`** walls and c 0 0 1!M •••• "••< !!!!II •••• *••• It!!!! •,<. ..<. !!1!!! «.** ..< partitions d 0 0 Mill «•»* ••«* I!!!!! *•« *»•• MIII <.«. *«. tI(M e 0 0 !!Mill «••< *••• !!!!!! **** "" Mill •••• <••• MITI f 0 0 111!!! •«,• »„* Mill ««*" ..<. (!il!1 . .««. ..«« I!!!!! •••, •«*« 6 Windows and a 3AO 39.7 *' 608 24121 **" 88 3491 '*** 40 1587 *`*` 8 317 *«** glass doors b 0 "` 0 0 """ 0 0 "" 0 0 **** 0 0 Heating c 0 ** 0 0 `""* 0 0 **«* 0 0 ***' 0 0 *«* d 0 ** 0 0 ""** 0 0 **** 0 0 ""* 0 0 e 0 `* 0 0 **** 0 0 "** 0 0 """ 0 0 **** 7 Windows and North 19.0 232 *"` 4408 24 **«« 456 40 **** 760 8 `*`* 152 glass doors NE/NW 0 0 **`" 0 0 *T,* 0 0 «... 0 0 ';** 0 Cooling E/W 68.0 176 "`* 11968 64 " 4352 0 * 0 0 '*"" 0 SE/SW 0 0 '"" 0 0 **" 0 0 *""* 0 0 " 0 South 34.0 200 *•`* 6800 .0 <••" 0 0 ••<• 0 0 •••• 0 Horz 0 0 "** 0 0 *"'" 0 0 *"' 0 0 `"`" 0 8 Other doors a 11 FO 12.2 2.3 63 771 146 0 0 0 42 514 97 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 01 i 0 c 0 0 0 0 0 0 0 0 0 0 01 0 0 0 9 Net a 12E3 5.4 1.0 6009 32449 6129 1288 6955 1314 1294 6988 1320 72 389 73 exposed b 0 0 !!I!1! 0 0 1IM! 0 0 !!!M 0 0 !!!!!1 0 0 walls and c 0 0 !IIM 0 0 !!!!!1 0 0 !1 M 0 0 1!!!I1 0 0 partitions d 0 0 !I!!!! 0 0 !!!!!! 0 0 Mill 0 0 !!!!!! 0 0 e 0 0 !MI! 0 0 !!!!!! .0 0 !!!!!! 0 0 !!!!1! 0 .0 f 0 0 !1!M 0 0 1!!!!1 0 0 Mill 0 0 M!1! 0 0 10 Ceilings a 16GO 2.4 1.1 2868 6814 3218 0 0 0 98 233 110 21 50 24 b 0 0 !111!! 0 0 !11!1! 0 0 !!!!1! 0 0 !!M 0 0 c 0 0 1!M1 0 0 IMI1 0 0 Mill 0 0 Mill 0 0 d 0 0 !!!!!! 0 0 !!M 0 0 1!!!!1 0 0 !!M 0 0 e 0 0 Mill 0 0 !!!II! 0 0 Mill 0 0 1M!1 0 0 f 0 0 !!Mill 0 0 !!!!!! 0 0 II!!t! 0 0 !!!!!1 0 0 11 Floors a 1910 1.7 0 1284 2219 0 1284 2219 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 617 1066 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 !!!!11 0 0 !!!11! 0 0 !!!!I! 0 0 !!!!!! 0 0 is displ. d 0 0 !!!!!! 0 0 !!!!!! 0 0 !!!!!! 0 0 1:1! 0 0 for slab e 0 0 !!!!!! 0 0 !!!II! 0 0 !!!!!! 0 0 Il11! 0 0 floors) f 0 0 !!!!!1 0 0 I!M 0 0 II!!!! 0. 0 Mill 0 0 12 Infiltration a 68.0 5.4 671 45616 3620 88 5982 475 82 5575 442 8 544 43 Ventilation 0 0 01 0 10 0 0 0 13 Subtotal loss=6+8..+11+12 ***' 113056 "" **`* 18648 *«** ""` 14896 "*" ""*" 1300 **** Less external heating •*** 0 ••<" .««. 0 ««., <.,* 0 .... .«.. 0 .«. Less transfer «•<• O •••• ••«. 0 0 ,... •••* 0 •*"• Heating redistribution «••* 0 •••• «**• 0 *••* *•-` 0 ..« «».* 0 <«.. 14 Duct loss 6% 6783 "" 60/0 1119 «*"* 6% 894 "*' 6% 78 *"** 15 Total loss=13+14 **" 119839 *'"* `""* 19766 "" *`** 15790 "*"" '"'" 1378 **** 16 Int.gains: People @ 300 0 `**« 0 0 0 0 0 0 0 Appl. @ 1200 0 ""` 0 0 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 **** "*" 36289 **"` '"" 6597 '"'* "*** 2729 '*** *"*' 292 Less external cooling ••*• ••*< 0 ..«« .<.. 0 .... .««« 0 ..«. ..<. 0 Less transfer *•** *,•, 0 •••* •*•* 0 *<,. _.«. 0 <,«« *<.. 0 Coding redistribution ••<• *•,• 0 ,••« •••• 0 <•*• •••• 0 ••_• <••< 0 18 Duct gain 5% *`*' 1814 5% *"** 330 5% """ 136 5% ""*' 15 19 Total RSH gain=(17+18)*PLF 1.00 "*'" 38104 1.00 " * 6926 1.00 *"* 2866 1.00 **'" 307 20 Air required(cfm) 12601 260 1260 *"208 229 166 95 14 10 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri htsOft' 2023-Jun-0710:07:22 g Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 /��A ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Right-M Worksheet Job: 9ewestmntrd Entire House Date: Jun 07,2023 Byy: Pr* 1822 MANUAL J:7th Ed. 1 Name of room Room4 Room5 Room6 Room? 2 Length of exposed wall 8.0 ft 4.0 ft 5.0 ft 25.0 ft 3 Room dimensions 3.0 x 5.0 ft 6.0 x 4.0 ft 5.0 x 2.0 ft 13.0 x 12.0 ft 4 Ceilings Condit. Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 fti heaticool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg I Clg (ft2) Htg Cig (ft9 Htg I Clg 5 Gross a 12E3 5.4 1.0 64 <,•• •,•, 32 «««« ..«. 40 ««». .<«« 200 •«,. ,«<« Exposed b 0 0 !!!!!! ««.« ..«< 111111 •««« •••• 1M!I ••«. «««« PIII! ••«« «««« walls and c 0 0 11lm «««« ..«. MIM ...« «««« !!!!!! ...« «««« !!!III partitions d 0 0 I!M «.«. ..«« I!!!!I ..<« «««« !!M <«.« «... IM11 f 0 0 !!!!!! .«.« <..« !!Ill! .,»« .... !!!!il .... «««« 11 M 6 Windows and a 3A0 39.7 " 0 0 """ 0 0 '"" 0 0 **** 40 1587 ***' glass doors b 0 `* 0 0 *«* 0 0 ***' 0 0 '*** 0 0 :R�k Heating c 0 0 0 0 0 0 0 '**` 0 0 *... d0 ** 0 0 *"* 0 0 0 0 '*** 0 0 e 0 0 0 "`*" 0 0 *`** 0 0 `*" 0 0 f 0 " 0 0 *"*< 0 0 *'*' 0 0 "'" 0 0 ' 7 Windows and North 19.0 0 **** 0 0 ""` 0 0 "" 0 0 '"" 0 glass doors NE/NW 0 0 *"" 0 0 *`** 0 0 **k# 0 0 *;+* 0 Cooling E/W 68.0 0 0 0 * 0 0 0 0 ' " 0 SE/SW 0 0 ""'* 0 0 *"** 0 0 "*" 0 0 ". 0 South 34.0 0 ***` 0 0 **"" 0 0 '""' 0 40 *"`* 1360 Horz 0 0 «"«. 0 0 ..*« 0 0 ..«« 0 0 «««« 0 8 Other doors a 11FO 12.2 2.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 01 0 9 Net a 12E3 5.4 1.0 64 346 65 32 173 33 40 216 41 160 864 163 exposed b 0 0 Mill 0 0 !!!111 0 0 !!!!!1 0 0 MIMI 0 0 walls and c 0 0 !I!!!! 0 0 1M1! 0 0 !!!!11 0 0 !1 M 0 0 partitions d 0 0 I!M! 0 0 Mill 0 0 Mill! 0 0 !IIM 0 0 e 0 0 1!!!!! 0 0 !1111! 0 0 !!!IL 0 0 !!!!!! 0 0 fl 1 0 0 1!1!1! 0 0 IMI! 0 0 1!IM 0 0 !!i!!! 0 0 10 Ceilings a 16GO 2.4 1.1 0 0 0 0 0 0 10 24 11 0 0 0 b 0 0 !I M 0 0 !!!!!! 0 0 !Mll 0 0 IIW! 0 0 c 0 0 !!!!!! 0 0 !111!! 0 0 Mll! 0 0 IMM 0 0 d 0 0 !!M 0 0 I!M 0 0 !!!!!! 0 0 Mill 0 0 e 0 0 !!!M 0 0 IM!1 0 0 !!!!!! 0 0 I'll! 0 0 f 0 0 !!!!�i 0 0 !!(!!! 0 0 I!!!!! 0 0 M!!!1 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 perimeter c 0 0 1M1! 0 0 11MI 0 0 !!!!!1 0 0 1!I!1! 0 0 is displ. d 0 0 !MI! 0 0 1!1M 0 0 !!!!!! 0 0 !!!!!1 0 0 for slab e 0 0 1!!!!1 0 0 1M1! 0 0 !!M 0 0 IMI! 0 0 floors) f 0 0 !!111! 0 0 1!1!1! 0 0 BMI 0 0 IMI! 0 0 12 Infiltration a 68.0 5.4 0 0 0 0 0 0 0 0 0 40 2719 216 Ventilation 0 0 01 0 0 0 0 01. 13 Subtotal loss=6+8..+11+12 '*" 346 "'* "'" 173 '*** **" 240 **" *`** 5170 "** Less external heating •••• 0 ...< «.«« 0 «««« .«<. 0 <«.. «««« 0 *«»« Less transfer <»•, 0 0 0 0 «««» Heating redistribution •,« 0 .... «««« 0 «.«« «.«» 0 ,.». .««« 0 «««« 14 Duct loss 6% 21 *"' 6% 10 **"* 60/0 14 **'* 6% 310 *'** 15 Total loss=13+14 '*"* 366 "" '**" 183 '*** '"" 254 *`"' "** 5480 *"* 16 Int.gains: People @ 300 0 *'** 0 0 ..*` 0 0 *.�. 0 0 ,��. 0 Appl. @ 1200 0 0 0 "< 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 «*" '**' 65 "" `*" 33 <`<" `*** 52 `*** *"* 1739 Less external cooling 0 0 0 ««.« ",«« 0 Less transfer •«•, •,•• 0 «««« ..,. 0 «».« «««« 0 .<.« »«„ 0 Cooling redistribution .««« .,.. 0 ,««« «».« 0 ««,. ««.« 0 ..«« «««« 0 18 Duct gain 5% "" 3 5% *:'* 2 5% "" 3 5% '**' 87 19 Total RSH gain=(17+18)*PLF 1.00 ***' 69 1.00 34 1.00 **'" 55 1.00 *<" 1826 20 Air required(cfm) 4 2 2 1 3 2 58 60 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2023-Jun-07 10:07:22 -Fp wrightscft- Right-Sufte®Universal 2017 17.0.16 RSU25116 Page 2 ACP. ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 98 west mnt rd Entire House Date: Jun 07,2023 By: Plan: 1822 MANUAL J:7th Ed. 1 Name of room RoomS Room9 Room10 Room11 2 Length of exposed wall 25.0 ft 12.0 ft 38.0 ft 188.0 ft 3 Room dimensions 13.0 x 12.0 ft 10.0 x 13.0 ft 22.0 x 16.0 ft 1.0 x 1512 ft 4 Ceilings Condit. Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ftj heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg I Clg (ftj Htg Clg (ft) Htg I Clg M Htg Clg (ft') Htg I Clg 5 Gross a 12E3 5.4 1.0 200 **** "" 96 ""' **** 304 "*' **** 1504 Exposed b 0 0 IMII '"'• "" IM11 •«•' •*" !!III! ••" *'•• Mll! '*"* "'• walls and c 0 0 Ill!!! .... .*.. 111111 *... .,.. iillii partitions d 0 0 !!M ••", **•• !!M ••*• ,••* It!l�� ••*• •••" MI!I .... .... e 0 0 !!111! .... .*.. 1!MI f 0 0 !!!!!! .... .... !!I!!! .... .... Ill!!! .... .... !1!lil .... .... 6 Windows and a 3A0 39.7 ** 48 1904 "'* 0 0 ***" 136 5395 **** 24 952 **** glass doors b 0 ** 0 0 '*** 0 0 **** 0 0 ***` 0 0 �... Heating c 0 "` 0 0 **** 0 0 "*"" 0 0 '"" 0 0 ** d 0 " 0 0 **** 0 0 "'"' 0 0 """ 0 0 ' e 0 •• 0 0 ••<• 0 0 •••• 0 0 •••" 0 0 •••* f 1 0 '* 0 0 ""` 0 0 "" 0 0 **** 0 0 7 Windows and North 19.0 0 "" 0 0 '*** 0 88 *"`* 1672 0 "" 0 glass doors NE/NW 0 0 '*;* 0 0 *�*� 0 0 `�*« 0 0 '�** 0 Cooling E/W 68.0 0 * 0 0 0 48 ` 3264 0 '*"* 0 SE/SW 0 0 **'" 0 0 0 0 0 0 0 South 34.0 48 "" 1632 0 **** 0 0 *'*< 0 24 **" 816 Horz 0 0 "** 0 0 *""' 0 0 "" 0 0 "" 0 8 Other doors a 11F0 12.2 2.3 0 0 0 21 257 49 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 152 821 155 75 405 77 168 907 171 1480 7992 1510 exposed b 0 0 IIIM 0 0 1!M1 0 0 !II!!! 0 0 IIIM 0 0 walls and c 0 0 !!!!11 0 0 1!II1I 0 0 !I!!!! 0 0 Mill 0 0 partitions d 0 0 M!II 0 0 III!!! 0 0 1!1M 0 0 111111 0 0 e 0 0 !Mll 0 0 !I!!!! 0 0 !!M 0 0 11... 0 0 f 0 0 !!!!!I 0 0 MMI 0 0 !!1M 0 0 !II!!! 0 0 10 Ceilings a 16GO 2.4 1.1 0 0 0 0 0 0 0 0 0 1512 3593 1696 b 0 0 1!!!!! 0 0 !!!!11 0 0 !fill! 0 0 !!!!1! 0 0 c 0 0 11!!!! 0 0 Mill 0 0 !!!I!1 0 0 Mill 0 0 d 0 0 1!M! 0 0 !IMI 0 0 Mill 0 0 !IMI 0 0 e 0 0 11IM 0 0 !!Ill! 0 0 Mill 0 0 IIMI 0 0 If 0 0 Mill 0 0 Mll! 0 0 !!!!!! 0 0 IMI! 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 326 563 0 perimeter c 0 0 M!!! 0 0 !!!!!1 0 0 !fill! 0 0 !!!!!! 0 0 is displ. d 0 0 1!IP! 0 0 !!I!!! 0 0 I1!M 0 0 !!fill 0 0 for slab e 0 0 IlIM 0 0 11MI 0 0 !!!11! 0 0 Mil! 0 0 floors) f 1 0 0 !!M 0 0 11MI 0 0 !!!!1! 0 0 !!m 0 0 12 Infiltration a 68.0 5.4 48 3263 259 21 1428 113 136 9246 734 24 1632 129 Ventilation 0 0 0 0 0 01 0 0 13 Subtotal loss=6+8..+11+12 "" 5988 '""" "'" 2090 "< 15548 *""" '"" 14732 Less external heating ,••• 0 •••• "'* 0 `** *••' 0 •*•` •"* 0 '••• Less transfer •«•• 0 •«•• *••• 0 " •••• •«•* 0 ,••• •••• 0 •••• Heating redistribution ••'• 0 •••• ***• 0 ***• •««• 0 ""' •••• 0 *••• 14 Duct loss 6% 359 '""` 6% 125 **"* 6% 933 *"** 6% 884 "** 15 Total loss=13+14 "" 6347 "" **** 2215 **** `"" 16481 *`*` "** 15615 16 Int.gains: People @ 300 0 '"" 0 0 *"** 0 0 *�. 0 0 0 Appl. @ 1200 0 0 0 ** 0 0 0 0 0 17 Subtot RSH gain=7+8..+12+16 "" **" 2046 """ *"' 238 '""' *"" 5841 **** *<" 4152 Less extern!cooling •••• "`" 0 *"* ••`• 0 •••• ••'* 0 „*• •*•• 0 Less transfer '•'• ,•'* 0 "" •••* 0 *••• "•• 0 •••` '*"* 0 Cooling redistribution "'* ,••, 0 ,•'* "*' 0 "** •••• 0 `••• •*** 0 18 Duct gain 5% *"*` 102 5% "<'* 12 5% **"* 292 5% "`" 208 19 Total RSH gain=(17+18)'PLF 1.00 '*** 2148 1.00 "*** 250 1.00 **** 6133 1.00 **"" 4359 20 Air required(cfm) 67 71 23 8 173 203 164 144 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. -Fp- wrightsoft- 2023-Jun-0710:07:22 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 3 ACZA ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Right-JO Worksheet Job:. 98westmntrd Entire House Date: Jun 07,2023 Pfan: 1822 MANUAL J:7th Ed. 1 Name of room Room12 Room13 Room14 Room15 exposed wall 2 Length of 48.0 ft 7.0 ft 7.0 ft 23.0 ft 3 Room dimensions 15.0 x 18.0 ft 7.0 x 5.0 ft 7.0 x 8.0 It 13.0 x 14.0 ft 4 Ceilings Condit.Option 8.0 ft heat/cool 8.0 ft heat/cool 8.0 ftl heat/cool 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (W) Htg Clg (ft� Htg I Cig (ft2) Htg Cig (ft� Htg Clg 5 Gross a 12E3 5.4 1.0 384 =•__ «««« 56 _,._ «««. 56 .___ _... 184 Exposed b 0 0 1!M „__ •••• dill( =___ •••« 111111 «••_ •_«_ !dill •««• .__« walls and c 0 0 !!M ••,_ _«_• I!!I!1 ___• •__« IM!! _,_, «___ !i!!!! •••_ partitions d 0 0 !!M! ..__ .«_= it M _.,_ _•__ M M __•• _... !I!!!! 6 Windows and a 3A0 39.7 40 15B7 **"" 0 0 ***' 0 0 '«`" 40 1587 glass doors b 0 " 0 0 "" 0 0 "'* 0 0 .... 0 0 .."" Heating c 0 0 0 0 0 0 0 =... 0 0 7 Windows and North 19.0 0 *'** 0 0 **** 0 0 **" 0 0 •`"* 0 glass doors NE/NW 0 0 ""• 0 0 `*�� 0 0 *�R* 0 0 '�« 0 Cooling E/W 68.0 40 '*"* 2720 0 ' 0 0 ' 0 0 '_•• 0 SE/SW 0 0 0 0 '""" 0 0 0 0 0 South 34.0 0 """' 0 0 *`*' 0 0 *`** 0 40 "'"* 1360 8 Other doors a 11FO 12.2 2.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 344 1858 351 56 302 57 56 302 57 144 778 147 exposed b 0 0 1M!1 0 0 !!!!!! 0 0 !!!!!I 0 0 !!M1 0 0 walls and c 0 0 !!!!!! 0 0 Mfl! 0 0 Mill 0 0 !!M 0 0 partitions d 0 0 !!I!!! 0 0 !!!!!! 0 0 !!!!!! 0 M 0 !! 0 0 0 0 i!M 0 0 !!!!l! 0 0 !!!!!! 0 0 !!!!!! 0 0 f 0 0 !!!!!! 0 0 !!!!!l 0 0 !!!!!! 0 0 Mil! 0 0 e 10 Ceilings a 16GO 2.4 1.1 270 642 303 35 83 39 56 133 63 182 432 204 b 0 0 !!!!!1 0 0 !!!!!! 0 0 !1111! 0 0 11M! 0 0 c 0 0 !! M 0 0 !!!!!! 0 0 Mill 0 0 Mll! 0 0 d 0 0 M!!! 0 0 !!!!!1 0 0 !!!I!! 0 0 Mill 0 0 e 0 0 1!1!1! 0 0 Mill 0 0 Mil! 0 0 Mill 0 0 f 0 01 !!M 1 0 0 Mill 0 0 il!M 0 0 !!!!!! 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 235 406 0 35 60 0 21 36 0 0 0 0 perimeter c 0 0 111111 0 0 Mill 0 0 !flit! 0 0 !!!1!1 0 0 is displ. d 0 0 Mill 0 0 !!!!1! 0 0 !!!!1! 0 0 !!!!1! 0 0 for slab e 0 0 !I M 0 0 Mll! 0 0 !!!!!! 0 0 !I!!!! 0 0 floors) f 0 0 Mill 0 0 I!!!!! 0 0 Bill! 0 0 !!!Ill 0 0 12 Infiltration 5.4 40 2719 216 0 0 0 0 0 0 40 2719 216 arm Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 *"` 7211 "`* "`*" 446 `*** ""' 412 ***` **" 5516 «"' Less external heating =•_= 0 •••« •_•= 0 •«_• •__• 0 =•_• __•, 0 =.., Less transfer ••_« 0 •••_ •,•• 0 •«__ «.«= 0 „«. ...« 0 Heating redistribution ••_« 0 ,•«• •••= 0 =««_ ••_= 0 •••« _••• 0 «_ 14 Duct loss 6% 433 "" 6% 27 *"* 6% 28 `*"' 6% 331 15 Total loss=13+14 '*'* 7644 '•" '•" 473 *`*« ""*" 500 **`" *"' 5847 *'"* 16 Int.gains: People @ 300 0 '*** 0 0 **`* 0 0 •�•" 015% **** 0 Appl. @ 1200 0 =«•« 0 0 «_*= 0 0 00 17 Subtot RSH gain=7+8..+12+16 *'** ""* 3590 **** """* 96 "" *"' 120 1927 Less external cooling =••• _•_• 0 «••« •••• 0 =,•, ___, 0 0 Less transfer «••• •«„ 0 ..«« _..= 0 =«,_ .__= 0 0 Cooling redistribution •••_ *__= 0 •«•_ _••• 0 •___ «___ 0 0 18 Duct gain 5°/u '**' 179 5% *'*` 5 5% "** 619 Total RSH gain=(17+18)*PLF 1.00 **"* 3769 1.00 **** 101 1.00 '*** 126 2023 20 Air required(cfm) 80 125 5 3 5 461 67 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. 2023-Jun-07 10:07:22 - - wrigFttsoft' Right-Suite®Universal 2017 17.0.16 RSU25116 Page 4 ACZA ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N Right-M Worksheet Job: 98 west mnt rd Entire House Date: Jun 07,2023 Byy: Pfan: 1822 MANUAL J:7th Ed. 1 Name of room Room20 2 Length of exposed wall 31.0 ft 3 Room dimensions 15.0 x 18.0 ft 4 Ceilings Condit. Option 8.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Area Area EXPOSURE NO. Htg Cig (ft� Htg Clg Htg Clg Htg Clg Htg Clg 5 Gross a 12E3 5.4 1.0 248 "`" "'" _,__ ____ `••• •••' •_•_ _••• Exposed b 0 0 Mill •_•• ••_« _,._ .«„ «._. .... <... _«.. walls and c 0 0 liml partitions d 0 0 Ill1!! ••,• ,•,, __«_ _«__ ._.. «,_. «.,. .... e 0 0 1!1!!! 6 Windows and a 3A0 39.7 ** 72 2856 glass doors b 0 ** 0 0 Heating c 0 0 0 7 Windows and North 19.0 0 ***` 0 glass doors NE/NW 0 0 *"` 0 =`"* **"* "• Cooling E/W 6&0 24 *"" 1632 SE/SW 0 0 "_.. 0 South 34.0 48 ""` 1632 8 Other doors a 11FO 12.2 2.3 0 0 0 b 0 0 0 0 0 C 0 0 0 0 0 9 Net a 12E3 5.4 1.0 176 950 180 exposed b 0 0 !!!!!! 0 0 walls and C 0 0 !!!!1! 0 0 partitions d 0 0 !i!!!1 0 0 e 0 0 1!!!!! 0 0 f 0 0 !!!!!! 0 0 10 Ceilings a 16GO 2.4 1.1 270 642 303 b 0 0 !llll! 0 0 C 0 0 !!!!!! 0 0 d 0 0 1!M! 0 0 e 0 0 !!M 0 0 f 0 0 !!!!!!1 0 0 11 Floors a 1910 1.7 0 0 0 0 (Note:room b 1910 1.7 0 0 0 0 perimeter C 0 0 !111!! 0 0 is displ. d 0 0 Mill 0 0 for slab e 0 0 Mill 0 0 floors) f 0 0 11!!!! 0 0 12 Infiltration a 68.0 5.4 72 4895 388 Ventilation 0 0 13 Subtotal loss=6+8..+11+12 =••• 9343 =_•_ •««_ ..._ .«._ .«_« _«.. .«__ Less external heating ,»_= 0 Less transfer =__= p •__< ...< «,.« .... «.<. __.« _.«« Heating redistribution *_«« 0 14 Duct loss 6% 561 15 Total loss=13+14 =_•= 9904 ••«. ._«_ «_«. ,«,« ._«. «««_ _.__ 16 Int.gains: People@ 300 0 ***< 0 Appl. @ 1200 0 ,_•• 0 •_«_ •___ `••• 17 Subtot RSH gain=7+8..+12+16 *`** "" 4135 ••«« _.«_ _... .<__ .,_« .«_« Less external cooling Less transfer •••• •_•= 0 Cooling redistribution ,••< .... 0 18 Duct gain 5% "" 207 19 Total RSH gain=(17+18)*PLF 1.00 '*<" 4342 20 Air required(cfm) 104 144 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri htsoft' 2023-Jun-0710:07:22 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 6 /C�!A ...rthy\Documents\York\Template\98 west mnt rd.rup Calc=MJ7 Front Door faces: N i�.. A erltdatron Needs {ifI p .41 �-�kU'�,"9 ttl.l6c;�'h Pr'4.a:,�'I i111t ��k:0'�+F.i•ty COa:i�!�l"� Good stir quality Is based In part an the capacity al ttto hunws ventilation systctn. ually,the unrifs capacity is measured In GFtvt(Cubic reet per Minute)or Us(Liters free second)of fresh air be it distribatted in the ilv(np r Spam Use ilia ASHRAE 612 Vontilation Standard, the Roorn Count CLIluulallon!49 Ciya�d,or the Air Change For Hour(ACN)Method to deteymme your vealliailon neads. { ASHIRAE 62.2 CFM Sizing chart Number of Bedrooms!CFM I„* Floor Area{ft) 0.1 -3 4-5 6 7 >7 .: 1600 30 46 60 7�i '1501 -3000 45 60 75 90. � 105 3001 -4500 60 75 90 105 120 45O1 -600t1 15 go 1015 120 6001 -7500 90 105 120 135 150 1 ;,.7500 iC5 120 135 - 150 i' 1 f 5 ,A6U�I:ASFlRA4<fP'ANDARD Q'el,.;?-'?Q710•Ventilation Air Etta ►ntG:v3ttt0s to � F i The ahovp chart outlines the minimum rogaktrernents for continums yr nttlanon,CFM f � O 1 j i I i11 315.6-1-18 RC-0296-2023 . Cerrone Builders 98 West Mountain Rd SFD 2676 s.f., Garage 550 s.f. ToWO OF 0 tJlltINr�DEP on 'ImPR n CMFN� liance used w _ ano ,camp IaIi5 and ���ucl�lntip ods UL �r Silali nU e Ot,�, Wlttl out Gt7f111�1�in��' full ccm,)to o thto• 1 e 222 ell— � � 1 i 4 V _ i �J Vv i ---i h o Z TOWN. F QUEENS UIL r e Gate. I g � CR c co a PIZ - sw o� This home has been professionally insulated with Owens Corning' PROPINK'L77 Loosefill Insulation (Job Site Address) Name Address 98 West Mountain Rd city Queensbury State Zip Owens Corning. PROPINK' L77 Loosefill Insulation Owens Corning will accept no responsibility when the product is not installed in accordance with the product label.Stated R-value is provided by installing the required number of bags at a thickness not less than the labeled minimum thickness.Installation of the required number of bags may yield more than the specified minimum thickness.Failure by the installer to provide both the required bags and at least the minimum thickness will result in lower insulation R-value. Specification for Open Blow Attics Coverage charts are based on a nominal net bag weight of 32 lbs. Attics ,,,, J�trfrraUrr�tr��laf��a((k���������Mrntm�r��e�fled �fa�rrr�u�U�riverag� ,Mrntttzurr���gs„, �ffnJrr�}�m1N�aght ,„ New Construction ® Retrofit ❑ �ai�e rrrkne�stesy,, rtt�ne&sttmesi,,,�� eeBag( �r�} eltiousyft 13 4.75 4.75 154.6 5.4 0.173 19 7.00 7.00 125.0 8.0 0.256 22 5.00 5.00 106.3 9.4 0.301 Number of bags 28 26 9.25 9.25 89.6 11.2 0.357 used 30 10.50 10.50 77.0 13.0 0.416 38 13.25 13.25 59.9 16.7 0.534 44 15.00 15.00 50.7 19.7 0.631 491 16.75 16.75 45.0 22.2 0.711 Estimated R-value 60 20.00 20.00 35.8 28.0 0.895 of previous N/A insulation Walls IIed 7 Yr k es� fastall €7Ens iy (N�imam f a�� Word4w lghf 14 2x4 3.5 1.25 S7.S 11.4 0.364 Area of coverage 15 2x4 3.5 1.45 75.7 13.2 0.423 g 1250 16 2x4 3.5 2.20 49.9 20.1 0.642 (sq.ft.) 22 2x6 5.5 1.25 55.9 17.9 0.573 23 2x6 5.5 1.35 51.7 19.3 0.619 24 2x6 5.5 1.75 40.0 25.0 0.802 Other type(s)of N/A Floors Insulation In attic alua..,,,"' parrying" Ml mU tir����������Cn�fa112d�EnSiY �%��£� GfXQ� M41 wafizgSPpY Ml t �gh4 Thfaknass{X a arr ft P r fag ,,,ffiaa�y .,,, VI*41 30 2x8 7.25 1.35 39.2 25.5 0.816 38 2x10 9.25 1.35 30.5 32.2 1.041 46 2x12 11.25 1.35 25.3 39.6 1.266 Thickness of 16.75 insulation Cathedral Ceiling y iviiiiiiiiillletlpnnSfi �Nl�%In£nrrE Col�k� �4JIffillrt3 cgs Pp�Y Ml�f ��nlght iiatalli ,,,,������Thinktl�ssX�fiks`f,Ro,Iti peY P ,,,,, ,,,f4Gpsf 30 2x8 7.25 1.35 39.2 25.5 0.816 Depth of previous N/A 38 2x10 9.25 1.35 30.8 32.5 1.041 insulation 49 2x12 11.25 1.55 15.5 54.2 1.734 Loosefill insulations vary in thermal performance due to factors such as aging,mean temperature,settlement,convection,moisture absorption and installation variation. Convection in glass loosefill insulation installed in open attics can reduce its thermal performance in extreme winter temperatures during the heating season. Contractor Thermally Yours Date 11/16/2Ailder Cerrone Builders Date Company /I///LYY( 44Y e& Company (Signa(Ire) (Signature) Address 149 Plant Rd., Haftoon NY 12065 Address Phone 518-312-0859 Phone OWENS CORNING INSULATING SYSTEMS,LLC ONE OWENS CORNING PARKWAY TOLEDO,OHIO,USA43659 Pub.No.10012954-B.Printed inU.S.A.October 2016.The color PINK isaregistered ® 1-800-GET-PINK" trademarkof Owens Corning.Cc2016 Owens Corning Insulating Systems,LLC.AII www.owenscorning.com Rights Reserved. Envelope Leakage Test Testing Company: Technician: Name: LoCascio Energy Solutions Name: Anthony LoCascio Address: 20 Ogden Rd. Credentials: HERS Rater#4242961 Queensbury ,, NEW YORK 12804 Phone: 5188573144 Email: tony@locascioenergysolutions.com www.locascioenergysolutions.com Building Information: Customer Information: Project ID: 98 West Mountain Name: Cerrone Construction Address: 98 West Mountain Rd Address: Queensbury ,, NY 12804 Geo-Tag Data: Latitude: 43.287391 Longitude: -73.723304 Tim estam p: 2024-01-09 12:12:39 Measured Leakage: 1,232.2 CFM50 Test ID: 98 Purpose of Test: RESNET Multi-Pt Env. Leakage Measured ACH50: 2.21 (+/- 2.4%) Effective Leakage Area: 61.1 in Building Volume: 33,454.0 ft3 Enclosure Surface Area: 3,944.0 ft2 Coefficient (C): 82.5 (+/- 10.6%) Exponent (n): 0.691 (+/- 0.031) Correlation Coefficient: 0.99971 Test Standard: RESNET 380 Multi-Point Test Mode: Depressurize Test Characteristics: Indoor Temp: 62 °F Outdoor Temp: 24 °F Altitude: 427.0 ft Time Average Period: 10 seconds Test Date and Time: 2024-01-09 12:13:00 2000 Depressuirize 1888 800 700 600 cn 500 400 300 200 4 5 6 7 8 910 20 30 40 50 6070 Building Pressure(Pa) Envelope Leakage Test Test Readings: Target (Pa) Bldg_(Pa) Adj Bldg (Pa) Fan (Pa) Flow (cfm) Config Baseline -2.1 -60.0 -62.5 -60.5 -69.0 1,498.1 Ring A -48.0 -49.3 -47.2 -50.2 1,283.2 Ring A -35.0 -36.7 -34.7 -32.9 1,044.1 Ring A -23.0 -24.0 -21.9 -164.7 760.8 Ring B -10.0 -13.0 -10.9 -59.6 459.9 Ring B Test Equipment: Flow Device: Model 3 110V Fan Serial #: 3173 Custom Calibration Date: 2023-02-28 Pressure Gauge: DG1000 Serial #: 3172 Calibration Date: 2023-11-20 Deviations from Standard: • None Comments: None Report by TEC Auto Test 1.9.1 (8), ©2023 The Energy Conservatory, Inc. Page 2 of 2 z 0 Map References vo zo J 1 z CL o U Map of lot No. 117 Section Five Q w Bedford Close z Dated: May 22, 1989LL- p 2 Map of lot No. 116 in 3/4° IPP r7 Section 5 of Bedford Close, Owned by Richard & Katherine P. Rozell o Dated: December 08, 1989 Lot I I G o By: Coulter McCormack Bedford CIo5e Section Five Lands Now or Formerly of 3 James D. Baldauf Map of a survey made for Book:5584 Page:214 Roland A. Lafond, Jr. and 3 1 5.G-I-1 7 Rachelle A. Lafond Dated: December 01, 1998 z By: Van Dusen & Steves 6 Q Land Surveyors s. � � m o 4 N Map of a survey made for o o ►� Alan E. & Doris W. Redeker z c Dated: March 22, 2000 c ►�. �; By: Van Dusen & Steves 4-4 Land Surveyors u.P.N 8 O o o m � � 5 > p Map of a survey made for E-1 2 Thomas J. & Christina Cloran �, � c� Dated: September 10, 2002 S 82018'03" E By: Van Dusen & Steves 361,46 Land Surveyors cIRP w Deed References Jess J. Gentry and Lot 1 17 4w Amanda M. Gentry Bedford CIo5e Section Five O To W I — James D. Baldauf and = � Lorraine Baldauf, c I Lands Now or Formerlyof F Tenants by the entirety I z I _ c N Dated: June 30, 2017 a I cc ^ Marianne B. Reifenheiser Recorded on: July 03, 2017 c R ,y M I Book:1420 Page:175 Book:5584 Page:214 Z I z c I CO + 308. 18-1-1 5 c Area (0 0 W 52570 Sq. Feet Mary Ann Hubert 91.01, 1.21 Acres To Maureen V. Lehet, James A. Hubert and Jason M. Hubert, cIRP as Trustees of the Proposed Sept I Mary Ann Hubert Family Trust 3 Dated: November 14, 2016 o Recorded on: April 02, 2019 WV _ u.P.N �.5 Book:5909 Pag e:222 _ Jeffery Godnick CV To Vt co Brian Little 351,36' c Dated: April 14, 2022 82�18'03" dy y Recorded on: April 22, 2022 Book:6607 Page:264 I"Aluminum Pipe c1PIS ': Garage Batting Cage Lot 147 p ►fJ Bedford CIo5e Section Six co co ...i O 1f) Lands Now or Formerly of Grossman Family Trust ry0 z Lands Now or Formerly of Book:6637 Page:27 Mary Ann Hubert Family Trust 315.E-1-35 O a Book:5909 Page:222 z 315.E-I-19 Cr CIRF NOTES: 3/4" IPF I .) THIS MAP WAS PREPARED WITHOUT THE BENEFIT OF AN ABSTRACT OF TITLE OR AN UP TO DATE TITLE REPORT AND 15 THEREFORE SUBJECT TO o ANY STATEMENT OF FACTS SHOWN THEREON. HEREBY CERTIFY THAT THIS MAP WAS PREPARED 2.) 1114 PARCEL 15 SUBJECT TO ANY EASEMENTS OF RECORD. FROM AN ACTUAL FIELD SURVEY. r- 3.) THIS MAP WAS PREPARED FROM AN ACTUAL FIELD SURVEY MADE IN THIS CERTIFICATION SHALL RUN ONLY TO THE PERSONS 'd 1114 ACCORDANCE WITH THE EXISTING CODE OF PRACTICE ADOPTED BY THE FOR WHOM THE SURVEY WAS PREPARED, AND ON THEIR NEW YORK STATE A550CIATION OF PROFESSIONAL LAND SURVEYORS. CIRF BEHALF TO THE TITLE COMPANY, GOVERNMENTAL AGENCY �� N AND LENDING INSTITUTION LISTED HEREON. > O 4.) THIS MAP IS COPYRIGHT© 2023 VAN DUSEN STEVES LAND CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL SURVEYORS. UNAUTHORIZED ALTERATION OR ADDITION TO THIS INSTITUTIONS OR SUBSEQUENT OWNERS. p DOCUMENT 15 VIOLATION OF SECTION 7209, SUBDIVISION 2, OF NEW O .� YORK STATE EDUCATION LAW. CERTIFIED TO: SETH TERBEEK 5.) DIMENSIONS BETWEEN PROPERTY LINES AND STRUCTURES ARE TO THE MICHELLE TERBEEK NEAREST HALF FOOT AND ARE FOR THE SOLE PURP05E OF NBT BANK, Date: May 26, 2023 INTERPRETING THEIR CONFORMANCE WITH ZONING AND NOT INTENDED ITS SUCCESSORS AND/OR ASSIGNS TO AID IN THE ESTABLISHMENT OR RETRACEMENT OF PROPERTY LINES. Legend CHICAGO TITLE INSURANCE COMPANY Scale 1"=30' G.) UNDERGROUND UTILITIES, IF ANY, ARE NOT SHOWN HEREON. 7.) THE SURVEYED PARCEL 15 SUBJECT TO WHATEVER RIGHTS, TITLE OR CIRF = Capped Iron Rod Found INTEREST THE TOWN OF QUEEN513URY, THE COUNTY OF WARREN, AND IPF = Iron Pipe Found THE PEOPLE OF THE STATE OF NEW YORK MAY HAVE TO MAINTAIN THE U.P. = Utility Pole S— 1 ROADS, AND TO WHATEVER RIGHTS, TITLE OR INTEREST THE TRAVELING = Overhead Utility Wire PUBLIC MAY HAVE TO THE BED OF THE ROADS. A`' = Water Valve ceRT1F1eD BY: SHEET 1 OF 1 MATTHEW C. STEVES, LLS NYS 501 35 DATED: AUGUST 18, 2023 CERRONE D3196 DWG. NO. 23-1 17 315.G-I-18