Loading...
IM Inspection Worksheet_02-01-2024_14-29-48 (2)INSPECTION WORKSHEET (FDTN-029636-2023) CC-0596-2023Case Number:Case Module:Permit Management 01/02/2024 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:John O'Brien Job Address:Parcel Number:1471 State Rte 9 Lake George, NY 12845 288.-1-58 Company Name NameContact Type Applicant Russell Faden Engineer Dreamscapes Unlimited Granted Permission 1471 St Rt 9 LLC Primary Owner 1471 St Rt 9 LLC Checklist Item CommentsPassed Building Inspector Notes False 12/21/23 partial approval for foundation. - Footings approved. 1/2/24 Building Foundation Inspection Partial Approval - North & West Frost Walls Footing Drain Stone - 12 inch width False PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True 1/2/24 Building Foundation Inspection Partial Approval - North & West Frost Walls 5 psi or 10 ft. above highest conn. for 15 minutes False Masonry Wall False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing False Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Monolithic Slab False Footings True 12/21/23 partial approval for foundation. - Footings approved. Footing Drain stone - 6 mil poly False Piers False Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True 1/2/24 Building Foundation Inspection Partial Approval - North & West Frost Walls Reinforcement in Place True 12/21/23 partial approval for foundation. - Footings approved. Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place False January 02, 2024 Page 1 of 1