IM Inspection Worksheet_02-01-2024_11-29-15INSPECTION WORKSHEET (RPLUM-029670-2024)
CC-0013-2023Case Number:Case Module:Permit Management
01/02/2024 Partial PassInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:80 Main St
Queensbury, NY 12804
309.10-1-25
Company Name NameContact Type
Applicant FOOTHILLS BUILDERS, LLC
Architect Rucinski Hall Architecture
Contractor FOOTHILLS BUILDERS, LLC
Granted Permission FOOTHILLS BUILDERS, LLC
Primary Owner 78-80 Main Street LLC
Checklist Item CommentsPassed
Building Inspector Notes False 11/15/23 partial approval for rough plumbing.
- 5 roof drains at the east side of building pressure tested and
approved.
11/16/23 partial approval for rough plumbing:
- Remaining 5 roof drains pressure tested and approved.
12/11/23 partial approval for rough plumbing.
- sanitary drains and vents approved for rooms 308 thru 312
half of rooms 306 & 307 are included.
12/20/23 partial approval for rough plumbing.
- remaining plumbing for sanitary drain and vents at the 3rd floor
approved.
- Domestic water supply at 3rd floor approved.
- Main water line supplying 3rd floor approved.
1/2/24 partial approval for rough plumbing.
- plumbing for domestic water supply at second floor approved.
- main supply plumbing from first floor to second floor verified.
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True third floor only
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True third floor only
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction False
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge False
January 02, 2024 Page 1 of 2
INSPECTION WORKSHEET (RPLUM-029670-2024)
Checklist Item CommentsPassed
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road False
January 02, 2024 Page 2 of 2