IM Inspection Worksheet_02-01-2024_11-04-23INSPECTION WORKSHEET (FRM-029648-2023)
CC-0013-2023Case Number:Case Module:Permit Management
01/02/2024 Partial PassInspection Status:Inspection Date:
Building FramingInspection Type:Inspector:Mark Smith
Job Address:Parcel Number:80 Main St
Queensbury, NY 12804
309.10-1-25
Company Name NameContact Type
Applicant FOOTHILLS BUILDERS, LLC
Architect Rucinski Hall Architecture
Contractor FOOTHILLS BUILDERS, LLC
Granted Permission FOOTHILLS BUILDERS, LLC
Primary Owner 78-80 Main Street LLC
Checklist Item CommentsPassed
Building Inspector Notes False 10/5/23 partial approval for framing.
- uplift screws at mansard trusses verified.
- smoke barrier at mansard trusses verified
10/25/23 partial approval for framing.
- framing at second and third floor only approved.
- draft stopping at floor trusses not completed.
- sheer walls not completed
-install access to dead space at roof area as discussed on site.
-install missing blocking for point loads at second floor.
1/2/24 partial approval for framing.
- draft stopping at floor trusses verified.
- blocking at point loads verified.
provide updated plans for the changes at the sheer walls.
Air Seal all Plates and Sills False
Joist hangers True
Exterior wall outlets sealed False
20 in. (W)True
Draft stopping 1,000 sq. ft. floor trusses False
5.0 sf grade True
Design Professional Sign-off, if required False
24 in. (H)False
Air Seal All Registers at Floor False
<4:12 pitch double layer of ice/snow underlayment False
Anchor Bolts 6 ft. or less on center True
Ice and water shield 24 inches from wall True
Bath fans connected to exterior vent False
12 O.C.False
Air Sealing all Joints Before Insulation False
Notches Holes Bearing Walls False
5.7 sf above below grade True
>1000 s.f. then firestop must be installed False
Truss Specification Provided True
January 02, 2024 Page 1 of 2
INSPECTION WORKSHEET (FRM-029648-2023)
Checklist Item CommentsPassed
Windows Habitable Space Bedrooms True
Metal Strapping for Notches Top Plate False
Bracing Bridging True
Deck (post beam connections hex head bolts)False
Jack Studs Headers True
Jack Posts Main Beams True
Attic Access 22 x 30 minimum False
Soffits-Insulation Baffel False
Exterior sheeting nailed properly True sheer walls verified at exterior only, second and third floor only
Hurricane Clips/Uplift Screws/Nail Holes Filled True 10/5/23 partial approval for framing.
- uplift screws at mansard trusses verified.
Permit Card Visible From Road True
Framing True partial approval for second and third floor only
Headroom 6 ft. 8 in.False
January 02, 2024 Page 2 of 2