Loading...
IM Inspection Worksheet_02-01-2024_11-04-23INSPECTION WORKSHEET (FRM-029648-2023) CC-0013-2023Case Number:Case Module:Permit Management 01/02/2024 Partial PassInspection Status:Inspection Date: Building FramingInspection Type:Inspector:Mark Smith Job Address:Parcel Number:80 Main St Queensbury, NY 12804 309.10-1-25 Company Name NameContact Type Applicant FOOTHILLS BUILDERS, LLC Architect Rucinski Hall Architecture Contractor FOOTHILLS BUILDERS, LLC Granted Permission FOOTHILLS BUILDERS, LLC Primary Owner 78-80 Main Street LLC Checklist Item CommentsPassed Building Inspector Notes False 10/5/23 partial approval for framing. - uplift screws at mansard trusses verified. - smoke barrier at mansard trusses verified 10/25/23 partial approval for framing. - framing at second and third floor only approved. - draft stopping at floor trusses not completed. - sheer walls not completed -install access to dead space at roof area as discussed on site. -install missing blocking for point loads at second floor. 1/2/24 partial approval for framing. - draft stopping at floor trusses verified. - blocking at point loads verified. provide updated plans for the changes at the sheer walls. Air Seal all Plates and Sills False Joist hangers True Exterior wall outlets sealed False 20 in. (W)True Draft stopping 1,000 sq. ft. floor trusses False 5.0 sf grade True Design Professional Sign-off, if required False 24 in. (H)False Air Seal All Registers at Floor False <4:12 pitch double layer of ice/snow underlayment False Anchor Bolts 6 ft. or less on center True Ice and water shield 24 inches from wall True Bath fans connected to exterior vent False 12 O.C.False Air Sealing all Joints Before Insulation False Notches Holes Bearing Walls False 5.7 sf above below grade True >1000 s.f. then firestop must be installed False Truss Specification Provided True January 02, 2024 Page 1 of 2 INSPECTION WORKSHEET (FRM-029648-2023) Checklist Item CommentsPassed Windows Habitable Space Bedrooms True Metal Strapping for Notches Top Plate False Bracing Bridging True Deck (post beam connections hex head bolts)False Jack Studs Headers True Jack Posts Main Beams True Attic Access 22 x 30 minimum False Soffits-Insulation Baffel False Exterior sheeting nailed properly True sheer walls verified at exterior only, second and third floor only Hurricane Clips/Uplift Screws/Nail Holes Filled True 10/5/23 partial approval for framing. - uplift screws at mansard trusses verified. Permit Card Visible From Road True Framing True partial approval for second and third floor only Headroom 6 ft. 8 in.False January 02, 2024 Page 2 of 2