Loading...
IM Inspection Worksheet_02-01-2024_11-21-44INSPECTION WORKSHEET (BINS-029653-2023) RC-0739-2020Case Number:Case Module:Permit Management 01/02/2024 Partial PassInspection Status:Inspection Date: Building InsulationInspection Type:Inspector:Mark Smith Job Address:Parcel Number:32 St James Pl Queensbury, NY 12804 309.10-1-97 Company Name NameContact Type Applicant HAYES & HAYES LLC Architect Rucinski Hall Architecture Contractor HAYES & HAYES LLC Granted Permission HAYES & HAYES LLC Primary Owner HAYES & HAYES LLC Checklist Item CommentsPassed Zip exterior sheathing, nailing & taping True Building Inspector Notes False 3/7/23 partial approval for insulation - R 30 insulation verified at second floor box beam at stair well, unit A and unit B. 1/2/24 partial approval for insulation. Thermal insulation approved at unit A & B and basement U Factors = .3 cfm for windows, .5 cfm for doors True .30 Insulation under bow & bay window(s)True Tub Shower R-20 with Vapor Barrier False Exterior wall outlets sealed True All Return Air Hard Duct Work False Duct work sealed properly / No duct tape False duct work not completed Duct Testing Outside Conditioned Space False House Wrap Taped at all Seams False Door / Window Sealed (No Insulation)True Air Seal Outside Penetrations True All Ductwork Sealed Return and Supply False Air Barrier behind Knee Walls False Blower Door Test False Duct Insulation - if required in unheated spaces False 15 min thermal barrier/intumescent paint applied False Tyvek or Similar Exterior Sealant False Combustion Air Supply for Furnace False Fresh air supply 3' from grade False Window Sealing True Duct Blaster Test for duct work, R-8, unhtd spaces False Permit Card Visible From Road False Proper Vent, Attic Vent True Insulation ResCheck ComCheck True R 21 in walls R 49 in ceilings. January 02, 2024 Page 1 of 1