Loading...
IM Inspection Worksheet_27-12-2023_15-09-00INSPECTION WORKSHEET (RPLUM-029593-2023) CC-0750-2023Case Number:Case Module:Permit Management 12/27/2023 PassedInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:1424 State Rte 9 Lake George, NY 12845 288.16-1-1 Company Name NameContact Type Applicant Southside Retail LLC Architect Architectural Group International Contractor Pinnacle Contruction Inc Granted Permission Bath and Body Works Primary Owner Lake George Northway LLC Checklist Item CommentsPassed Building Inspector Notes True 12/27/23 verified floor drain / slop sink / water pressure / 1 1/2" drain line to main drain with heat tape / pressure for DWV Pressure Test True existing water pressure Pressure Test True 3" Vent Through Roof - 18" min False Washing Machine Drain 2 inch minimum False All Return Air Hard Duct Work False 5 psi or 10 ft. above highest conn. for 15 minutes True Rough Plumbing / Nail Plates False Duct Testing Outside Conditioned Space False Shower liner test (2" of water)False Water Supply Piping True Duct Insulation - if required in unheated spaces False Duct work sealed properly False Cleanout every 100 feet change of direction False Plumbing Vent Vents in Place True Air Test Gas Piping 10 psi for 10 Minutes False Washing Machine Trap: 18"-42" discharge False Air Head False Air Head True 50 P.S.I for 15 minutes True 1 ½ inch minimum Drain Size True Drain Vent True Permit Card Visible From Road True December 27, 2023 Page 1 of 1