IM Inspection Worksheet_27-12-2023_15-09-00INSPECTION WORKSHEET (RPLUM-029593-2023)
CC-0750-2023Case Number:Case Module:Permit Management
12/27/2023 PassedInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:1424 State Rte 9
Lake George, NY 12845
288.16-1-1
Company Name NameContact Type
Applicant Southside Retail LLC
Architect Architectural Group International
Contractor Pinnacle Contruction Inc
Granted Permission Bath and Body Works
Primary Owner Lake George Northway LLC
Checklist Item CommentsPassed
Building Inspector Notes True 12/27/23 verified floor drain / slop sink / water pressure / 1 1/2"
drain line to main drain with heat tape / pressure for DWV
Pressure Test True existing water pressure
Pressure Test True
3" Vent Through Roof - 18" min False
Washing Machine Drain 2 inch minimum False
All Return Air Hard Duct Work False
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates False
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly False
Cleanout every 100 feet change of direction False
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes False
Washing Machine Trap: 18"-42" discharge False
Air Head False
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road True
December 27, 2023 Page 1 of 1