RC-0686-2022 Office Use Only
ADDITION/ALTERATION PERMIT permit#: eC•'0 'Le 2 2—
APPLICATION
Town ofQueensbury • Permit Fee:$ 22-0
• 742 Bay Road,Queensbury,NY 12804
P:518-761-8256 www.queensbury.net Invoice#: �5g� •
Flood Zone? Y Reviewed By:e.
P10
Project Location: 6 Antler Drive
Tax Map ID #: 240.9-1-3 Subdivision Name: n/a
PROJECT INFORMATION:
TYPE: I* Residential ❑ Commercial, Proposed Use:
*l Single-Family ❑ Two-Family ❑ Multi-Family(#of units_)• ❑ Townhouse
n Business Office ❑ Retail ❑ Industrial/Warehouse 0 Garage (#of cars )
El Other(describe • • •
ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
1st floor: 27.5 sqft 1st floor: •
2nd floor: none 2nd floor: •
•
3rd floor: none • 3rd floor:
Basement(habitable space): none Basement(habitable space):
Total sq ft: 27.5 sqft . • Total sq ft:
Expansion of first floor laundry room additional 5'-6".Modify roof to overhang new addition.
Scope of work to be done:
•
•
I; r� • - - -
•
•
Addition/Alteration Application Revised June 2022
ADDITIONAL PROJECT INFORMATION:
200
1. Estimated Cost of Construction:$
,000
2. Source of Heat (circle one): X(/
Gas ❑ Oil faPropane IIISolar ❑ Other:
Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application
3. Are there any structures not shown on the plot plan? El YES ® NO Explain:
4. Are there any easements on the property? ❑ YES ® NO
SITE INFORMATION:
• Is this a corner lot? ❑ YES ® NO
• Will the grade be changed as a result of the construction? ❑ YES 8 NO
• What is the water source? XPLJBLIC a PRIVATE WELL
• What type of wastewater system is on the parcel? SEWER 0 PRIVATE SEPTIC
DECLARATION:
1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be
completed within a 12 month period.Any changes to the approved plans prior to/during construction will require
the submittal of amended plans, additional reviews and re-approval.
2. If,for any reason;the building permit application is withdrawn, 30%of the fee is retained by the Town of
Queensbury.After 1 year from the initial application date, 100%of the fee is retained.
3. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees
and department approval.
4. I certify that the application, plans and supporting materials are a true and a complete statement and/or description
of the work proposed,that all work will'be performed in accordance with the NYS Building Codes, local building laws
and ordinances, and in conformance with local zoning regulations.
5. I acknowledge that prior to occupying the facilities proposed I, or my agents, will'obtain a certificate of
occupancy.
6. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: Sarah Green -
SIGNATURE:
DATE: 11/10/22
Revised June 2022
Addition/Alteration Application
CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL
• Applicant:
Name(s): Sarah Green, Prime Construction Saratoga
Mailing Address, C/S/Z: 77 Railroad Place .
Cell Phone: ( )(518)226-2877 Land Line: ( )(518)414-3265
Email:Sarah.Green@PCSaratoga.com
• Primary Owner(s):
Name(s); Elizabeth Abkin
Mailing Address, C/S/Z: 6 Antler Drive,Queensbury, NY 12804
Cell Phone: I )(973)410-9700 Land Line; ( )
Email:beth@alsnj.com
❑ Check if all work will be performed by property owner only
• Contractor(s): (List all additional contractors on the back of this form)
Contact Name(s): Prime Construction Services, LLC,d/b/a Prime Construction Saratoga
Contractor Trade: General Contractor
Mailing Address, C/S/Z: 77 Railroad Place,Saratoga Springs, NY 12866
Cell Phone: ( )(518)226-2877 Land Line: ( )(518)414-3265
.
Email:Sarah.green@PCSaratoga.com, Paul.young@PCSaratoga.com
**Workers' Comp documentation must be submitted with this application**
• Architect(s)/Engineer(s):
Business Name: Harding Engineering ,
Contact Name(s): John Harding, P.E.
Mailing Address, C/S/Z: PO Box 765, Saratoga Springs, NY 12866 ,
Cell Phone: ( ) Land Line: ( )(518)583-6420
Email:John@Harding-Engineering.com
Contact Person for Compliance in regards to this project: Sarah Green
Cell Phone: ( )(518)226-2877 Land Line: ( )(518)414-3265
Email:Sarah.Green@PCSaratoga.com.
Revised June 2022
Addition/Alteration Application
Residential Plan Review: 1- and 2- Family Dwellings
Y/N/NA (1 of 2)
"it-Ei Two (2)full sets of plans
4,06-- Over 1,500 sq.ft. requires engineering stamp
is- Design loads on plans: 115 Wind Floor Loads 40 psf
(North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas &Attics 30 psf
Calculations Decks 40 psf
Wind design for lake front properties
iturr Window schedule with glass size &main doors/Air leakage< .5 cfm for doors,< .3 cfm for
I windows/Tempered glass in bathrooms
l ' Door schedule/Main entrance 36" door
Emergency Escape or Bedrooms& Habitable Space
Above-grade: 5.7 sq.ft.
Grade: 5.0 sq.p‘fiwk 24" (h)x20" (w) minimum
44" maximum height above door
Window control devices 24" or less 2nd story or 72" above grade
Egress window from basement 5.0 sq.ft.
`16 Floor system sizing per table,502.3
1 Residential check ERI or 5 rescriptive ethod
to Driveway length: 300' or m• --12' width required/500'or more,turnaround required _
lki As Foundation drainage on plans, if required
7 6" drop in 10' exterior grade
y Framing cross section for each roof line,vertical fire stopping every 10'where
ll required/joist spans pg. 127 kIce &snow shield-24"from exterior wall
Platforms at exterior doors
Stairway headroom 6'8"; all stairs 36" width j4- Stair run and rise
►�x Winder run and rise
,� Spiral stairs meet requirements
Smoke detectors—battery backup & proper location, interconnected , \50-
N' Bathroom fixtures—proper clearance
rtij Hall width-36"width
14 Handrails more than four risers on open sides
pd i\ Railing&guards >30"/basement stairs included/closed risers more than 4" in height
R Safety glazing notes for required areas
i f Garage fire separation:%" gable end/5/8" under living space &'/:" on walls/20 min. door
rl and closer
i b}- Garage floor sloped
.�j Attic access:gasket seal& R-value equal to roof insulation
��� Roof over 30"-22"x 30"/Crawl spaces 18"x 24" access
Continued on back-> 4
Residential Plan Review Revised October 2021
Residential Plan Review: 1- and 2- Family Dwellings
Y/N/NA (2 of 2)
tz Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected
within 15'of sleeping area11 �
ASoil test results, if required
A Septic to well or water line separation
1�^5 All paperwork signed
i Note on plans energy saving light bulbs 90%
4 Blower door test agency paperwork
At, Floodplain Permit required—ck map: 2 feet above flood elevation
Hurricane clips requiredallP
Ai R- Floors less than 2 x 10 covere• by%"gypsum 5 " panel
Yp or /8 wood
lU A--Manuals S &J required for heating system. Cold air return hard piped
4 Separate room for draft HVAC or hot water heater with fresh air
HRV shown and calculations
114 Baffles at eaves for insulations and knee walls
kJ Makeup air for range hood >400 cfm
A Continuous header for garage doors to end wall
✓Chimney rain cap shown for fireplaces
Nc Deck hold down shown not less than 4 lags and bolts per table 507.2
•
Residential Plan Review Revised October 2021
o>
z-a
v i+ �+
+ 03
to
��qq Ned �b�b� =�p1 v 1p?z p o
a� 7o1'�1 A IWO
a P.of rn
O$ C� c fZA t�
gg yzo r, NC Ary p -�{
C \]J/ }QD Y� p`� { PA�+r<+� YY 1 C� N N N AD p
8 zy $o � pp1N°BnvvvN `.� , 0rn
7 3zd
O'N
N
% ��, � 2z O•
01
Ro
tp
x
O CON
toO
C1� �
R� 8alc
as >n
lie,
$ DCCK
MICK
® 20.51'
F�1 2 STORY
WOOD FRSM
G O HOUSE
-
N 20.51' IORLN
m m —7co
N m
m p N it
m
1
y N m
I+CA
1 w 2I.19
o � /
o n 0 to Y I
m�
A (A w
V r H 30'
c I
x � �
b � I a
" I A
� CrI
A PJ
.P
N fD
rnF+ s� —
o �p -- _
C .
20'wDE RJG17-OF-WAY `� CR4vfL — — — —
o o ert cr
o � 1 Is,
y 0 r*1 Z C
mV O rr'-
Z m Z Z -� 100.00,
O O S00'55'20'W
n N
O h
N
Y
N -. F mric A8 AM MAP MFXMXCXt��
Z
O -0
O
W�
o '
cz.
�e
F