IM Inspection Worksheet_19-01-2024_15-04-52INSPECTION WORKSHEET (RPLUM-000277-2024)
RC-0355-2023Case Number:Case Module:Permit Management
01/19/2024 PassedInspection Status:Inspection Date:
Rough PlumbingInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:39 Top Of The World
Lake George, NY 12845
252.48-1-25
Company Name NameContact Type
Applicant AJA Architecture & Planning
Contractor Lakeside Builders
Granted Permission Maureen Parker
Primary Owner Maureen Parker
Checklist Item CommentsPassed
Building Inspector Notes False
Pressure Test True
Pressure Test True
3" Vent Through Roof - 18" min True
Washing Machine Drain 2 inch minimum True
All Return Air Hard Duct Work True
5 psi or 10 ft. above highest conn. for 15 minutes True
Rough Plumbing / Nail Plates True
Duct Testing Outside Conditioned Space False
Shower liner test (2" of water)False
Water Supply Piping True
Duct Insulation - if required in unheated spaces False
Duct work sealed properly True
Plumbing Vent Vents in Place True
Air Test Gas Piping 10 psi for 10 Minutes True
Washing Machine Trap: 18"-42" discharge True
Air Head True
Air Head True
50 P.S.I for 15 minutes True
1 ½ inch minimum Drain Size True
Drain Vent True
Permit Card Visible From Road False
January 19, 2024 Page 1 of 1