Loading...
IM Inspection Worksheet_19-01-2024_15-04-52INSPECTION WORKSHEET (RPLUM-000277-2024) RC-0355-2023Case Number:Case Module:Permit Management 01/19/2024 PassedInspection Status:Inspection Date: Rough PlumbingInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:39 Top Of The World Lake George, NY 12845 252.48-1-25 Company Name NameContact Type Applicant AJA Architecture & Planning Contractor Lakeside Builders Granted Permission Maureen Parker Primary Owner Maureen Parker Checklist Item CommentsPassed Building Inspector Notes False Pressure Test True Pressure Test True 3" Vent Through Roof - 18" min True Washing Machine Drain 2 inch minimum True All Return Air Hard Duct Work True 5 psi or 10 ft. above highest conn. for 15 minutes True Rough Plumbing / Nail Plates True Duct Testing Outside Conditioned Space False Shower liner test (2" of water)False Water Supply Piping True Duct Insulation - if required in unheated spaces False Duct work sealed properly True Plumbing Vent Vents in Place True Air Test Gas Piping 10 psi for 10 Minutes True Washing Machine Trap: 18"-42" discharge True Air Head True Air Head True 50 P.S.I for 15 minutes True 1 ½ inch minimum Drain Size True Drain Vent True Permit Card Visible From Road False January 19, 2024 Page 1 of 1