Loading...
IM Inspection Worksheet_18-01-2024_11-18-16INSPECTION WORKSHEET (FDTN-000266-2024) RC-0619-2023Case Number:Case Module:Permit Management 01/18/2024 Partial PassInspection Status:Inspection Date: Building FoundationInspection Type:Inspector:Charles Dyer Job Address:Parcel Number:1611 Bay Rd Lake George, NY 12845 265.-1-43 Company Name NameContact Type Applicant Cerrone Builders Inc Contractor Cerrone Builders Inc Engineer Daniel Ryan Granted Permission Cerrone Builders Inc Primary Owner Sarah Palladino Sean Palladino Checklist Item CommentsPassed Building Inspector Notes False Footing Drain Stone - 12 inch width False not installed at time of inspection PVC/Cast/Copper/Pex tubing False Pressure Test False Foundation / Wallpour True approved 1/11/24 5 psi or 10 ft. above highest conn. for 15 minutes False Air or head test False Footing Drain Stone - 6 inches above footing False Foundation Dampproofing True Plumbing Under Slab False Foundation Waterproofing False Footing Drain Daylight or Sump False Footings True Footing Drain stone - 6 mil poly False Piers True Backfill Approval False Rough Grade 6 inch drop within 10 ft.False Foundation Insulation Interior / Exterior False Reinforcement in Place True with 2 rows #4 continuous Reinforcement in Place True with 3 rows #4 horizontally Permit Card Visible From Road True Poly Under Slab False Footing Dowels or Keyway in place True #4 dowels 3-4' oc January 18, 2024 Page 1 of 1