IM Inspection Worksheet_18-01-2024_11-18-16INSPECTION WORKSHEET (FDTN-000266-2024)
RC-0619-2023Case Number:Case Module:Permit Management
01/18/2024 Partial PassInspection Status:Inspection Date:
Building FoundationInspection Type:Inspector:Charles Dyer
Job Address:Parcel Number:1611 Bay Rd
Lake George, NY 12845
265.-1-43
Company Name NameContact Type
Applicant Cerrone Builders Inc
Contractor Cerrone Builders Inc
Engineer Daniel Ryan
Granted Permission Cerrone Builders Inc
Primary Owner Sarah Palladino
Sean Palladino
Checklist Item CommentsPassed
Building Inspector Notes False
Footing Drain Stone - 12 inch width False not installed at time of inspection
PVC/Cast/Copper/Pex tubing False
Pressure Test False
Foundation / Wallpour True approved 1/11/24
5 psi or 10 ft. above highest conn. for 15 minutes False
Air or head test False
Footing Drain Stone - 6 inches above footing False
Foundation Dampproofing True
Plumbing Under Slab False
Foundation Waterproofing False
Footing Drain Daylight or Sump False
Footings True
Footing Drain stone - 6 mil poly False
Piers True
Backfill Approval False
Rough Grade 6 inch drop within 10 ft.False
Foundation Insulation Interior / Exterior False
Reinforcement in Place True with 2 rows #4 continuous
Reinforcement in Place True with 3 rows #4 horizontally
Permit Card Visible From Road True
Poly Under Slab False
Footing Dowels or Keyway in place True #4 dowels 3-4' oc
January 18, 2024 Page 1 of 1