Loading...
Mixed Use Building 70-80 Main Street Queensbury concrete test report 7_7 Days4 William Street, Ballston Lake, New York 12019 Phone: (518) 399-1848 Email: constructiontech@live.com CLIENT: REPORT NUMBER: : PAGE #: 1 INSPECTION DATE: OUR FILE NUMBER:14 INSPECTOR & TEST SET: PAUL SANTIAGO #14 ATT'N: AMBIENT WEATHER: MIXED USE BUILDING: 70-80 MAIN STREET, QUEENSBURY, NEW YORK FILE LOCATION: 1 : PLACEMENT LOCATION OF LOAD # 2 : 0 0 0 1 2 0 0 4525 / 859121 4908 / 859122 0 0 0 7.50 / 7.50 4 7.50 / 15.00 5 0.00 0 0.00 0 2.50 / 3.00 0 ##3.25 / 3.35 0 0.00 0 0.00 0 3.20 / 4.08 # 3 4.10 / 4.45 ## 0.00 0 0.00 0.00 MAX: 2.00 )2 1.30 0 3 1.33 0 0 0.00 0 0.50 5.50 4 0.25 5.25 4 0.00 0.00 0 WATER ADDED ONSITE (GALLONS):0.00 0 0.00 0 0.00 0 WATER ADDED AT DISCRETION OF:0.00 # 0.00 ##0.00 0.00 0.00 0.00 0.00 PLACEMENT SLUMP (INCH) (SPEC: - 6.00 ) 5.50 0 5.25 0 0.00 0 ENTRAINED AIR ( % VOL) (SPEC: - 7.50 ) 7.50 0 0.00 0 0.00 0382000 UNIT WEIGHT (PCF) (SPEC:-0.00 ) 144.69 0 0.00 0 0.00 0 - 90 ) 74 0 72 0 0 0 NUMBER OF TEST SPECIMEN CAST:6 0 0 0 0 229665 - 229670 0 0 0 0 0 0 0 CONCRETE SUPPLIER:CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM: C39 P.S.I. @ 28 DAYS :UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: CEMENT:LBS.CYLINDER TEST UNIT CEMENT:LBS. NUMBER DATE P.S.I. GAL. COARSE AGGREGATE #1: LBS.229665 05/23/23 7 3800 X COARSE AGGREGATE #2: LBS.229666 05/23/23 7 3760 X COARSE AGGREGATE #3: LBS.229667 06/13/23 28 0 X FINE AGGREGATE: LBS.229668 06/13/23 28 0 X ADMIXTURE #1: OZS.229669 06/13/23 28 0 X ADMIXTURE #2: OZS.229670 01/00/00 SPARE 0 X ADMIXTURE #3: OZS. AIR ENTRAINING AGENT: OZS.0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X REPORT DISTRIBUTION:0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X 0 0 0 01/00/00 0 0 X RESPECTFULLY SUBMITTED,0 0 0 0 01/00/00 0 0 X CONSTRUCTION TECHNOLOGY 0 0 0 0 01/00/00 0 0 X 0 0 0 0 01/00/00 0 0 X ROBERT BEHAN (NICET)0 0 0 0 01/00/00 0 0 X MANAGER TECHNICAL SVCS.0 0 0 0 01/00/00 0 0 X C O N C R E T E F I E L D I N S P E C T I O N & C O M P R E S S I O N T E S T R E S U L T S 4.00 TEST AGE 4500 TIME CONC. BATCHED / ARRIVED: DELIVERED LOAD NUMBER: TRUCK NUMBER / TICKET NUMBER: YARDAGE DELIVERED / SUBTOTAL: CONCRETE TEMP. (F) (SPEC: SLUMP OF CONCRETE INTO PUMP: TIME PLACEMENT BEGAN / ENDED: CONCRETE AGE ( HOURS ) (SPEC: SLUMP ON ARRIVAL (INCHES): FOUNDATION WALL: D/2.3 - D/5 FOUNDATION WALL: D/5 - E/5; PIER COLUMN: D/5.4 PLACEMENT LOCATION OF LOAD # 0 0 0 JOINTA-GALUSHA CONCRETE COMPANY CONCRETE SLUMP IS AFTER PLASTICIZER ADDITION. ULTIMATE 05/17/23 4.50 IF APPLICABLE: 0.00 45 PROPER HOT OR COLD WEATHER CURING PROTECTION FOR AMBIENT CONDITIONS IS AVAILABLE ONSITE. PER DRAWING: S-202, DETAIL: 5 GENERAL CONSTRUCTION PRACTICE: CONCRETE PROPERLY CONSOLIDATED. NO VISUAL EVIDENCE OF SEGREGATION OR COLD JOINTS. PLACEMENT AREA REINFORCEMENT: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4: 0.0 5: 6: 7: 8: 1: FILE 2: SUPPLIER 3: 0 0.0 0 DISCREPANCIES & REMARKS: 0.0 LAB CYLINDER CONTROL NUMBERS: WATER: 0 DESIGN STRENGTH & FORMULA: 0 47,200 PLACEMENT AREA FORMWORK: ACCEPTABLE FOR ALIGNMENT & CLEANLINESS. FREE OF DEBRIS & STANDING WATER/ICE/SNOW. CLEANLINESS & COVER ACCEPTABLE. PROPERLY SIZED & LOCATED. PLACEMENT WEATHER PROTECTION: Robert BehanRobert BehanRobert BehanRobert Behan APPLIED LOAD 7 05/16/23 100.319 229665 70's: CLEAR PROJECT: CONSTRUCTION TECHNOLOGY MR. JOE LEUCI FOOTHILLS BUILDERS 9 MOUNTAINSIDE DRIVE QUEENSBURY, NEW YORK 12804 47,750 DAYS UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064