Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
3.07
3.7 WASTEWATER\Greater Qby Consolidated Sanitary Sewer Ext#7—575 Bay Road-Schermerhom Apartments—ORDER Set Public Hearing-2-26-2024 ORDER SETTING PUBLIC HEARING REGARDING PROPOSED EXTENSION #7 TO GREATER QUEENSBURY CONSOLIDATED SANITARY SEWER DISTRICT TO SERVE 575 BAY ROAD PROPERTY RESOLUTION NO.: 12024 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury wishes to consider an extension of its Greater Queensbury Consolidated Sanitary Sewer District to be known as Sanitary Sewer District Extension 47 (Extension 47) to serve 575 Bay Road in the Town of Queensbury, New York, such property consisting of two recently merged parcels (Tax Map Nos: 296.7-1-2 and 3) referred to as the "Property" on which Property a 76 unit apartment style multi-family building and associated work project including the sewer construction project/Extension 47 (Project) is proposed to be constructed by Schermerhorn Properties, LLC (Developer) in accordance with New York Town Law Article 12-A, and WHEREAS, a Map, Plan and Report issued April 24, 2023 and revised February 15, 2024 has been prepared by Environmental Design Partnership, LLP (Map, Plan and Report) concerning proposed Extension 47 to connect the proposed Property to the existing Greater Queensbury Consolidated Sanitary Sewer District as more specifically set forth and described in the Map, Plan and Report, and WHEREAS, the Map, Plan and Report has been filed in the Queensbury Town Clerk's Office and is available for public inspection, and WHEREAS, the Map, Plan and Report delineates the boundaries of the proposed Extension 47, a general plan of the proposed system, a report of the proposed method of operation, all outlets and the terminus and course of each proposed main sewer or drain together with the location and a general description of all sewage disposal plants, pumping stations and other public works, if any, and is consistent with, so far as possible, any comprehensive plan for sewers developed and maintained pursuant to General Municipal Law §99-f, and WHEREAS, on October 24th, 2023, the Town Planning Board, as Lead Agency, reviewed and conducted a State Environmental Quality Review Act (SEQRA) Review of the Project referred to as Planning Board Site Plan 61-2023 and Freshwater Wetlands 11-2023 Schermerhorn Construction, LLC, such Project being an Unlisted Action and granted a Negative Declaration, and WHEREAS, subsequently it was discovered that a variance will be required from the Town's Zoning Board of Appeals and on February 20th, 2024, the Town Planning Board considered the new information and the details requesting the variance and, after due consideration, readopted its Negative Declaration, and NOW, THEREFORE, IT IS HEREBY ORDERED: I. The boundaries of the proposed Extension 47 are as set forth in the Map, Plan and Report and as follows: SEWER SERVICE DISTRICT OVER ALL THOSE CERTAIN TRACTS, PIECES OR PARCELS OF LAND SITUATE in the Town of Queensbury, County of Warren, State of New York, lying along the westerly line of Bay Road (County Road No. 7) and being further bounded and described as follows: Beginning at the point of intersection of the westerly line of said Bay Road with the common division line of SBL4296.11-1-45 generally to the south and SBL#296.7-1-2 generally to the north; 2 Thence along said common division line, in a general westerly direction to the easterly line of SBL4296.7-1-18; Thence along the common division line of said SBL4296.7-1-18 generally to the west and said SBL#296.7-1-2 generally to the east, in a general northerly direction to the point of intersection of said common division line with the southerly line of SBL4296.7-1-4; Thence along the common division line of said SBL4296.7-1-4 generally to the north and said SBL#296.7-1-2 and SBL#296.7-1-3 generally to the south, in a general easterly direction to the point of intersection of said common division line with the aforesaid westerly line of Bay Road; Thence along said westerly line of Bay Road, in a general southerly direction to the point or place of beginning. The above described Sewer Service District Extension is intended to include all of those parcels as contained within the above described area as shown on the Warren County Real Property Tax Map in the Town of Queensbury, NY and is not intended for the conveyance of Real Property. 2. The proposed Project along Bay Road will include two (2) duplex grinder pump stations that will serve the proposed building. These grinder pumps will discharge to approximately 750 linear feet (LF) of 1.5" PE low pressure force main that will convey the flows to the existing gravity main along the western side of Bay Road. The proposed tie-in to the existing gravity main along Bay Road will be made using a pre-cast cut in manhole located adjacent to the site entrance. 3. The estimated construction cost associated with the proposed Sanitary Sewer District Extension 47 is estimated to be approximately $187,612 to be paid for by Developer; therefore, the Town will incur no construction and/or capital costs associated with this Extension 47. The total one-time cost of hook-up and permit fees is estimated to be $42,862.24. Developer will be required to maintain all of its sewer infrastructure to the point of connection to the existing sewer main. No dedication of infrastructure will be necessary for this Extension 47. 4. The estimated annual cost of the Extension 47 to the developed Property would be calculated as detailed in the Map, Plan and Report filed in the Town Clerk's Office and also available on the Town of Queensbury Website: www.queensbury.net. There is no "typical property" which is a one or two family home in such proposed District as the one commercial lot/subject Property is the only Property in this Extension 47 and the "typical property." The cost 3 of operation and maintenance would include the costs to operate, maintain, and supply the sewer system and is reflected in sewer rent charges. Based on an estimated annual water usage of 6.29 million gallons per year and an existing operation and maintenance rate of $5.50 per 1,000 gallons, the use fee would be approximately $34,633 per year. Once accepted into the Greater Queensbury Consolidated Sanitary Sewer District, users are changed a Benefit Tax which is currently $21.9115 per unit. Each residential parcel with apartments has a property class of B 1 with a Benefit Tax Unit of 1.0 per apartment unit. The property proposed to be added to the GQCSD will contain 76 apartment units and has a property class of B l. Therefore, the total benefits tax units are 76. With an annual Benefit Tax of $29.21 per unit, the total annual recurring costs for the property would be $36,298.66 for the merged lot. 5. Developer will pay all costs of the improvements including the one-time buy-in cost and Town connection fee, so there will be no financing required by the Town on behalf of the District or otherwise. Developer will provide to the Planning Board the Deed of merger and real property forms in the form they shall require and shall provide proof of recording prior to hooking up to the Town's system. 6. A detailed explanation of how the estimated costs of the Extension 47 were computed is included in the Map, Plan and Report which has been filed with the Queensbury Town Clerk and is available for public inspection. 7. The proposed improvements shall be constructed and installed as specifically delineated in the Map, Plan and Report and in full accordance with the Town of Queensbury's specifications, ordinances or local laws, and any State laws or regulations, and in accordance with approved plans and specifications and under competent engineering supervision. 8. The Town Planning Board, as Lead Agency, conducted SEQRA review of this Unlisted Action and granted a Negative Declaration on October 24, 2023. Since then, it was discovered that a variance by the Town Zoning Board of Appeals is required. The Town Planning Board considered the impact of this and again conducted SEQRA review of this Project including sewer construction at its February 20th, 2024 meeting and after due consideration, readopted its 4 Negative Declaration. 9. The Town Board shall meet and hold a public hearing at the Queensbury Activities Center, 742 Bay Road, Queensbury at 7:00 p.m., on Monday, March 18th, 2024 to consider the Map, Plan and Report and to hear all persons interested in the proposal and to take such other and further action as may be required or authorized by law. 10. The Town Board hereby authorizes and directs the Queensbury Town Clerk to duly publish and post this Order not less than ten (10) days nor more than twenty (20) days before the public hearing date, as required by Town Law §209-d, and complete or arrange for the securing of two (2) Affidavits of Publication of Notice and two (2) Affidavits of Posting of Notice of the Public Hearing required hereby and to file a certified copy of this Order with the State Comptroller on or about the date of publication. Duly adopted this 26t'day of February, 2024,by the following vote: AYES NOES ABSENT: 5 Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board RESOLUTION -Planning Board Recommendation to the Town Board for Sewer District Extension SITE PLAN 61 -2023 & FRESHWATER WETLANDS 11 -2023 SCHERMERHORN CONSTRUCTION, LLC, Tax Map ID: 296.7- 1 -2, 296.7-1-3 /Address: 575 Bay Road / Zoning: O WHEREAS, the applicant proposes to construct a 41 ,201 sq. ft. footprint building for 76 units. An existing 3,200 sq. ft. building will remain as a maintenance building. The project includes site work for stormwatcr, landscaping, lighting and parking. Project work also includes demolition of some existing outbuildings with other outbuildings and existing house to remain unchanged. The project has work within. 100 ft. of wetlands and is subject to a coordinated review with the Town Board for the extension of the sewer district. Pursuant to chapter 179-3-040, 179-5-100 and Chapter 94, site plan for a multifamily building in the Office zone and work within 100 ft. of wetlands shall be subject to Planning Board review and approval. Planning Board may accept lead agency, conduct environmental reviews and provide recommendation. MOTION FOR RECOMMENDATION TO THE TOWN BOARD TO GRANT SEWER DISTRICT EXTENSION FOR SITE PLAN 61-2023 & FRESHWATER WETLANDS 114023 SCIIERMERHORN CONSTRUCTION, LLC. The Planning Board based on limited review has not identified any significant adverse impacts that cannot be mitigated with this proposal. Introduced by Michael Dixon who moved for its adoption. Motion seconded by Nathan Etu. Duly adopted this 24 h day of October 2023 by the following vote: AYES: Mr. Stefanzick, Mr. Etu, Mr. Deeb, Mr. Dixon, Mr. Longacker, Mr. Stark, Mr. Traver NOES: NONE ABSENT: Mr. Magowan Phone: 518,761.8220 1 Fax: 518.745.4437 1 742 Bay Road. Queensbury, NY 12804 1 www_queensbury.net J Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEQR RESOLUTION — +Grant Negative Declaration SITE PLAN 61 -2023 & FRESHATER WETLANDS 11 -2023 SCHERMERHORN CONSTRUCTION, LLC Tax Map ID. 296.7-1 -2, 296.7-1-3 f Property Address: 575 Bay Road I Zoning: 0 The applicant proposes to construct a 41 ,201 sq. ft. footprint building for 76 units. An existing 3,200 sq. ft. building will remain as a maintenance building. The project includes site work for stormwater, landscaping, lighting and parking. Project work also includes demolition of some existing outbuildings with other outbuildings and existing house to remain unchanged. The project has work within 100 ft. of wetlands and is subject to a coordinated review with the Town Board for the extension of the sewer district. Pursuant to chapter 179-3-040, 179-5-100 and Chapter 94, site plan for a multifamily building in the Office zone and work within 100 ft. of wetlands shall be subject to Planning Board review and approval. Planning Board may accept lead agency, conduct environmental reviews and provide recommendation. The proposed action considered by this Board is Unlisted in the Department of Environmental Conservation Regulations implementing the State Environmental Quality Review Act and the regulations of the Town of Queensbury; No Federal or other agencies are involved; Part 1 of the Long EAF has been completed by the applicant; Upon review of the information recorded on this EAF, it is the conclusion of the Town of Queensbury Planning Board as lead agency that this project will result in no significant adverse impacts on the environment, and, therefore, an environmental impact statement need not be prepared. Accordingly, this negative declaration is issued. MOTION TO GRANT A NEGATIVE DECLARATION FOR SITE PLAN 61-2023 & FRESHWATER WETLANDS 11-2023 SCHERMERHORN CONSTRUCTION LLC. Introduced by Michael Dixon who moved for its adoption. As per the resolution prepared by staff. 1 . Part II of the Long EAF has been reviewed and completed by the Planning Board. 2. Part III of the Long EAF is not necessary because the Planning Board did not identify potentially moderate to large impacts. Motion seconded by Warren Longacker. Duly adopted this 24d' day of October 2023 by the following vote: AYES: Mr. Stark, Mr. Stefanzick, Mr. Etu, Mr. Deeb, Mr. Dixon, Mr. Longacker, Mr. Traver NOES: NONE ABSENT: Mr. Magowan Phone: 518,761 .8220 1 Fax: 519.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net 4FL Town of Queensbury Community Development Office 742 Bay Road, Queensbury, NY 12804 Town of Queensbury Planning Board SEAR RESOLUTION — Reaffirm Negative Declaration SITE PLAN 61 -2023 & FRESHWATER WETLANDS 11-2023 SCHERMERHORN CONSTRUCTION, LLC. Tax Map ID: 296.7- 1 -2, 296.7-1 -3 I Property Address: 575 Bay Road 1 Zoning: 0 The applicant proposes to construct a 41 ,201 sq. ft. footprint building for 76 units. An existing 3,200 sq. ft. building will remain as a maintenance building. The project includes site work for stormwater, landscaping, lighting and parking. Project work also includes demolition of some existing outbuildings with other outbuildings and existing house to remain unchanged. The project includes work within 100 ft. of wetlands. The proposed action was classified by this Board as an Unlisted Action under the State Environmental Quality Review Act and the regulations of the Town of Queensbury. This Board implemented coordinated review and, serving as Lead Agency, adopted a Negative Declaration on October 24, 2023. Thereafter, it was discovered that the amount of fill which must be used in this Action will alter the calculation of the height of the structure and results in the need for the Applicant to seek and receive an Area Variance from the Town Zoning Board of Appeal. MOTION TO REAFFIRM A NEGATIVE DECLARATION FOR SITE PLAN 61-2023 & FRESHWATER WETLANDS 11=2023 SCHERMERHORN CONSTRUCTION LLC FINDING THAT NO NEW OR DIFFERENT ENVIRONMENTAL IMPACTS WILL RESULT FROM THE ADDITION OF FILL WHICH WERE NOT PREVIOUSLY ANALYZED. Introduced by Fritz Stefanzick who moved for its adoption. Motion seconded by Brady Stark. Duly adopted this 20t' day of February 2024 by the following vote: AYES: Mr. Longacker, Mr. Stark, Mr. Stefanzick, Mr. Deeb, Mrs. McDevitt, Mr. Traver NOES: NONE ABSENT: Mr. Magowan Phone: 518.76I ,8220 1 Fax: 518.745.4437 1 742 Bay Road, Queensbury, NY 12804 1 www.queensbury.net eco ENVIRONMENTAL DESIGN a 5 e- PARTNERSHIP, LLP. 900 $6 Cfiflon�aClr, 12065 ' {P 18.377 .7621 ''�dp .cOm Shaping the physical environment MAP, PLAN AND REPORT ; ` GREATER QUEENSBURY CONSOLIDATED SEWER DISTRICT SERVICE AREA EXTENSION #T: 575 BAY ROAD TOWN OF QUEENSBURY WARREN COUNTY, NEW YORK PREPARED BY: Environmental Design Partnership, LLP 900 Route 146 Clifton Park, NY 12065 PREPARED FOR: Schermerhorn Real Estate Holdings, LP ISSUED: April 24, 2023 c4 C)IF N t4j' y� c=� " REVISED: February 15, 2024 a-9602� fipF.�SS Y©'N?v Greater Are Extent' Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 PARTNERSHIP. LLP. TABLE OF CONTENTS 1 .0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 . 1 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 2 1 .2 Purpose & Scope . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... 2 2.0 EXISTING CONDITIONS . . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 3.0 PROPOSED SEWER DISTRICT EXTENSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . 3 3. 1 Proposed Service Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.2 Proposed Sewer District Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3 3.3 Required Sewer System Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.0 PROPOSED RATE STRUCTURE . . . .. . . . . . . . . . . . .. . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . 4 4. 1 Construction Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.2 Benefit Tax . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.3 Sewer Rents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... 4 4.4 Annual Cost and Hook-up Fees (to the proposed District Taxpayers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 5.0 IMPLEMENTATION PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . ... 5 5. 1 Implementation Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . 5 LIST OF APPENDICES SiteLocation Map .. . . . . . . . ... . ... . . .. . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . .. . . .. . . .. . . .. . . .. . . .. . . .. . . .. . .. . . . . . . .. . . . . . . . . . . .. . . .. . . .. . . .. . . A Boundary Map . . . . .. . . . . . . . .. . . . .. . . .. . . . . . . .. . . . . . .. . .. . . .. . . . , . . . .. . . .. . . . . . . .. . . .. . . .. . . .. . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . .. B BoundaryDescription ... . . .. . . .. . . . . . . . . . ... . . .. . . . . . .. . . . . . . . . . . . .. . . .. . . . . . . .. . . .. . . .. . . .. . . .. . . . . . .. . . .. . . . . . . . . . . .. . . .. . . .. . . . .. . C Listof included Parcels .. . . .. . . .. . .. . . .. . . . .. . . . . . .. . . .. . . . . . . . .. . . .. . . .. . . .. . . .. . . .. . . . . . . . . . .. . . .. . . .. . .. . . . . . . . .. . . .. . . .. . . . . . . . . D ProposedDesign Drawings . . . . . . . ... . .. . . . . . . .. . . .. . . . . . . . . . . . .. . . .. . . .. . ... . . . . . . .. . .. . . .. . . .. . ... . .. . . . . . . . . . . .. . . . . . . . .. . . .. . . E Construction and Connection Cost Estimate . . . . . . . . . . . . .. . . .. . . .. . . . . . . . . . . . . . .. . . . . . . . . . .. . . .. . . . . . . ... . .. . . .4 . . .. . . .. . F EstimatedAnnual Costs .. . . .. . . . .. . . . . . . .. . . .. . .. . . .. . . . . . . . . . . . .. . . .. . . .. . . .. . . .. . . .. . . . . . . . . . .. . .. . . .. . . . . . . . . . . .. . . .. . . .. . . .. . . . G IndustrialSurvey Form .. . . . .. . . .. . . . . . .. . . .. . . .. . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . .. . . .. . ... . .. . . .. . ... . ... . . .. . . . . . . . . . . . .. . . . . . .. . H 900 New 'York 146 Clifton Park, NY 12065 (P) 518.371 +7621 edpllp.com Greater Queensbury Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 PARTNERSHIP, LLP. 1 .0 INTRODUCTION 1 .1 . BACKGROUND The Town of Queensbury is located in southeastern Warren County, New York, encompassing three sides of the City of Glens Falls. Schermerhorn Real Estate Holdings, LP proposes to develop the existing property located at 575 Bay Road with a multi-family residential project. As the existing project parcel does not currently lie within the Greater Queensbury Consolidated Sewer District (GQCSD), an extension is required to connect to the municipal sewer. The GQCSD encompasses several properties adjacent to proposed project. A Site Location Map is attached as Appendix A. 1 .2. PURPOSE & SCORE The purpose of this report is to provide a sewer district extension for the project parcel which is located within the Town of Queensbury and is adjacent to the existing GQCSD Boundary. The address of this property is 575 Bay Road and consists of two recently merged parcels (Tax Map ID. 296.7-1 -2 & 3). This extension will be known as extension #7 of the Greater Queensbury Consolidated Sewer District. The property at 575 Bay Road is comprised of two recently merged parcels. The existing parcel is mostly vacant with barns and accessory agriculture building. The project site is located in the Queensbury Water District and there is adequate water supply via the existing water mains located along Bay Road . Schermerhorn Real Estate Holdings, LP has retained the Environmental Design Partnership, LLP (EDP) to prepare a Map, Plan and Report (MPR) for Extension #7 of the GQCSD. This report documents the sewer district extension for the Proposed Residential Development at 575 Bay Road and includes the following : • Description of Sewer District Extension #7 boundary; Plan/Profile of the required Sewer Infrastructure; Estimated Construction , operational and maintenance costs; and Implementation Plan. 2.0 EXISTING CONDITIONS An existing gravity sewer main is currently located within the Bay Road right-of-way, in front of the project parcel. This project proposes to connect to this existing gravity main with is part of the existing Town of Queensbury collection system. The existing gravity main in the Bay Road right-of-way is an 8-inch PVC sewer main designed to receive sewage flow from the Bay Road corridor_ The 8-inch gravity main increases to a 12- inch main just downstream from the site. This main conveys the sanitary sewer flows south along Bay Road and easterly along Walker Lane, where is reduces to an 8-inch main, before discharging to the Willowbrook Pump Station . The Willowbrook pump station discharges to a force main which conveys the flows to an existing gravity sewer main located to the south, along 900 New York 146 Clifton Park, NY 12065 1 (P) 518.371 .7621 edplip.com ENVIRONME Greater Queensbury Extension Consolidated Sewer District PARTNERSHIP, LL DESIGN Service Area Extension #7 pARTNERSHIp, LLP. Bay Road , which in-turn conveys the flows to the Meadowbrook Pump Station. From this pump station, the sewage is conveyed to the City of Glens Falls gravity sanitary sewer system at Sanford and Bay, where it is then conveyed to the Glens Falls WWTP. This WWTP is an approved treatment facility permitted by the New York State Department of Environmental Conservation (NYSDEC)_ 3.0 PROPOSED SEWER DISTRICT EXTENSION 3.1 . PROPOSED SERVICE AREA The proposed sewer district extension #7 includes the recently merged parcels that will connect to the Town of Queensbury's sewer system . The extension includes tax map parcels 296.7-1 -2 & 3 along Bay Road shown on Appendix B. This project will utilize a grinder pump system to convey sewage through low-pressure force mains that will discharge to the existing gravity sewer main that lies along Bay Road at the entrance to the project. A boundary map of the proposed Bay Road portion of Extension #7 of the GQCSD is included as Appendix B, with Appendix C containing a description of the proposed district extension boundary and Appendix D including a list of the Tax Map Identification numbers for the two recently merged parcels. 3.2. DISTRICT EXTENSION NECESSITY The owner of the existing 16.25-acre parcel located along Bay Road, proposes to develop the property with a 76-unit apartment style multi-family building . As such, public water and sewers are required for the proposed apartment building . The existing water main that lies within the Bay Road right-of-way will be tapped to serve this project. The applicant is proposing to utilize two grinder pump stations to convey sewage from the project through a single low-pressure sewer main to a cut-in manhole connection over the existing gravity main within the Bay Road right-of-way. Proposed design drawings are included as Appendix E_ 3.3. PROPOSED SEWER DISTRICT FLOWS The proposed project includes 76 proposed apartment units. Utilizing a design flow of 100 gallons per day (gpd) per capita and an estimated 2.27 person per dwelling unit (from US Census Data for the Town of Queensbury) the average daily flow per dwelling unit will be on the order of 227 gpd. Using this rate, the proposed estimated flow for the 76 unit apartment building will be on the order of 17,252 gpd. Existing water data from similar style projects located throughout Saratoga County, Schenectady Couty, Albany County and Warren County the average daily water usage is on the order of 50 gpd per bedroom. Using a more conservative design rate of 70 gpd per bedroom each dwelling unit, which are 2- bedroom each, will have a design flow on the order of 140 gpd . Using this rate, the proposed estimated flow for the 76-unit apartment building will be on the order of 10,640 gpd. Since the proposed project has a design flow of greater than 2,500 gpd an approval from NYSDEC for the proposed sewer extension is required prior to the start of construction_ 900 New York 146 Clifton Park, NY 12065 2 (P) 518.371 .7621 edpllp.corn Greater Queensbury Extension on #7 Consolidated sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 PARTNERSHIP, LLR 3.4. REQUIRED SEWER SYSTEM FACILITIES The proposed project will include two duplex grinder pump stations that will serve the proposed building. These grinder pumps will discharge to approximately 750 linear feet (LF) of 1 .5 inch PE low pressure force main that will convey the flows to the existing gravity sewer main located along the western side of Bay Road. The proposed tie-in to the existing gravity main along Bay Road will be made using a precast cut-in manhole located adjacent to the site entrance. The proposed grinder pump stations are prepackaged units manufactured by Environment One Corporation (EONE). The EONE grinder pump stations are selected based on the calculated contributing flow rates to the station. The proposed grinder pump stations are sized as summarized below, based on historical water usage for this style apartments; Grinder Pump Station o Contributing Design Flow Rate = 76 units x 140 gpd/unit = 10,640 gpd o Average Flow Rate = 7.4 gallons per minute (gpm) o Peak Hourly Flow Rate — 7.4 gpm x 4 = 30 gpm a Pump Selection: Two (2) EONE WH484 Quadplex Grinder Pump Stations o Pump Station Design Capacity = 7,000 gpd per pump station x 2 pump stations = 14,000 gpd 3.5. DOWNSTREAM SEWER CAPACITY The existing downstream sewer for the proposed project consists direct connection to an existing gravity system that lies in the Bay Road right-of-way. This existing gravity system utilizes an 8-inch pipe which increases to a 12-inch sewer main downstream of the site. The 12- inch main flows south along Bay Road, then easterly along Willow Lane where is decreased to an 8-inch pipe downstream prior to entering the Willowbrook Pump Station. The Town of Queensbury Sewer Department reports that there is no issue with capacity in these sewer mains or pump station as they were designed based on the overall drainage area. The Willowbrook pump station currently operates at a pumping rate on the order of 285 gpm . Presently, per data from the GQCSD, the average inflow into the pump station is on the order of 52 gpm with a peak inflow rate on the order of 114 gpm, which leaves an existing capacity on the order of 171 gpm . The proposed project peak hourly flow rate will be on the order of 30 gpm which is well within the existing capacity of the pump station. Therefore, no modifications to the existing Willowbrook pump station are required. Under an amended Inter Municipal Agreement (IMA) with Glens Falls, the Town of Queensbury discharges wastewater up to 1 .414 MGD on a 30-day average, to the City of Glens Falls sewer system at five (5) locations. It is reported from the Town of Queensbury Sewer Department that they are currently discharging approximately 850,000 gpd with a peak monthly discharge of approximately 1 . 1 MGD. Therefore, there is adequate capacity downstream for flows from these projects. The City of Glens Fall currently has a combined sewer overflow (CSC ) that is permitted and monitored by NYSDEC. The City of Glens falls has been actively working with NYSDEC in order to separate and removed stormwater inflow and groundwater infiltration into the sanitary sewer 900 New York 146 Clifton Park, NY 12065 3 (P) 518.371 .7621 edpllp.com Greater Queensbury consolidated Sewer District EHVIRO L DESIGN Service Area Extension #!7 PARTNERSHIRSHI P,t LLP collection system in order to reduce and eventually eliminate the combined sewer overflow. As part of the sewer extension approval from NYSOEC additional removal of stormwater inflow and infiltration within the City of Glen Falls sewer collection system may be required . 4.+0 PROPOSED RATE STRUCTURE 4.1 . CONSTRUCTION COSTS The estimated construction cost associated with the proposed Bay Road extension #7 of the GQCSD is approximately $ 187,612 based on the Design plans attached as Appendix E. This cost includes the one-time systems connection charges and is proposed to be paid by Schermerhorn Real Estate Holdings, LP and therefore will not be apportioned as debt service to the district. A copy of the cost estimate is included in Appendix F. The Greater Queensbury Sewer District will require an escrow account to be setup to guarantee construction of the public facilities for one-year and to ensure that all record documentation is provided to the Wastewater Director, including GIS information , Daily Construction Logs, Testing Records and As-built information. 4.2. BENEFIT TAX Once accepted into the Greater Queensbury Consolidated Sewer District (GQCSD), users are charged a benefit tax as established in the Map, Plan and Report of the initial forming of the GQCSD, dated March 5, 2011 and prepared by the Chazen Companies. Based on Table 2 in the referenced Map, Plan and Report, each residential parcel with apartments is has a property class of B1 with a Benefit Tax Unit of 1 .0 per apartment unit. The property proposed to be added to the GQCSD will contain 76 apartment units and has a property class of 81 . Therefore, the total benefit tax units are 76. Benefit Tax Unit assignments are used to apportion debt of infrastructure across users within the GQCSD. The benefit tax rate for 2024 is $21 .9115 per Benefit Tax Unit. The Benefit Tax calculations for the proposed district extension has been included in Appendix G_ 4.3, SEWER RENTS In addition to the benefit tax, users within the GQCSD are also charged a user rate based on water consumption. The income generated by the sewer rent is used to offset costs of operation and maintenance as well as build reserves for improvements needed in the system . The Town of Queensbury currently charges $5.50 per 1 ,000 gallons for all residential users in the district. The anticipated water use for this project is estimated to be up to 6.29 million gallons per year- Based on the residential rate of $5.50 per thousand gallons, the costs for sewer rents will be approximately $34,633 per year. The estimated sewer rents are included in Appendix G . 900 New York 146 Clifton Park, NY 12065 4 (P) 518.371 .7621 edpllp.com Greater Queensbury Extension Consolidated Sewer District PARTN RSHIPtAL DESIGN Service Area Extension #7 PARTNERS1i1P, LLP. 4.4. ANNUAL COSTS AND HOOK-UP FEES (To the Proposed District Taxpayer) This Map, Plan and Report includes only a single parcel with an assessed property value is on the order of $672,700. The Hook-up fees will include a one-time connection fee of $2.37 per gallon as well the costs associated with the physical connection of the property to the sewer system and the legal costs associated with the district extension . Based on the estimated flows from section 3.3 of this report, the sewer connection costs (Hook-up fees) are included in Appendix F. The total estimated hook-up costs for the Property at 575 Bay Road is $187,612. The total annual costs associated with the proposed sewer district extension will include the benefit taxes and sewer rent fees that have been discussed in section 4.2 and 4.3 of this report. The total annuals costs for the property at 575 Bay Road are estimated to be on the order of $367299. 5.0 IMPLEMENTATION PLAN 5. 1 . IMPLEMENTATION SCHEDULE A public hearing for this project has not been scheduled at this time. It is anticipated that if the project is approved, construction of the sewer extension for this proposed project would begin in fall of 2024, with a completion by the fall of 2025_ A project schedule as it pertains to sewer work is included in Table 1 . Table 1 : Preliminary Project Schedule :. Finalize Map, Plan and Report February, 2024 Planning Board Confirms SEORA February, 2024 Determination Sewer District Extension Formation and February 2024 Public Hearing NYSDEC Sewer Approval March 2024 Final Site Plan Approval March 2024 Construction September 2024 — November 2025 900 New York 146 Clifton Park, NY 12065 5 (P) 518.371 .7621 edpllp.com Greater Clueensbury Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 PARTNERSHIP, I.I.P. APPENDIX A SITE LOCATION MAP 900 New York 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp.com ENVIRONMENTAL DESIGN PARTNERSHIP, I.I.P. Appendix A: Site Location Map 17 13 F £ fir" YY1 M r"erl � am yr M %Pf� G4n5It Club G / ��•� ' Site Location /! - •..�4s c ueknabury �T y - ,y sx� r V.r GIF Ilse ..W a'r•nS,�._�✓^'----Lo+.wrW.rren.sl�_ ey . 50Ut1Y 1:..,}. sH ltdsM F.�s "" � Falls Nssfi GI ns ` yl Palls j ..•a.•rn o l 5"n y�. . m•YryT - rlNS IL Wae•wr a. a r Fort EdWNd A� �i•erw. 4 - � ~{ 1 Y Psn••rrvn —kemwus-aa-"'� JJJ Aln per"- .x� c` n 900 Route 146, Clifton Park, New York 12065 phone (516) 371 -7621 e-mail: info@edpllp.com Greater Queensbury Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 PARTNERSHIP? LLP. APPENDIX B BOUNDARY MAP 900 New York 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp.com a S C .. uj °o- 0 ° Z R'UND PONll SITE LOCATION MAP U U vcnu zoao ` N W F -— H c LO o W Z W W W ZOO LlJ � f- _Q w _ W Q w EXTENSION #7 OF THE GREATER _ / ~ W z$a SEWERSBURYDISTRICT CONSOLIDATED SANITARY -/ X � Q'''rc c SEWER DIS7RIC7 ,% W (,D (n o 296.7-I-2 �r: e Tj — —...--- - ------ --- �._.—_ -- — - — �- -Z - _�- v --�- C -�--- --- 4 f x --- - -- -- �= C3 � n — ��-1 ca _ 61 ffini ❑ ........._ D ____— CONSTRUCTIONMOT __ ..___________ FOR ._ —. .......— [ m [" rD a PENDIX"8" 3 -. o Q� 1 of 1 Greater Queens bury Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 K PARTNERSHIP, LLR APPENDIX C BOUNDARY DESCRIPTION 900 New York 146 Clifton Park, NY 12065 (P) 518,371 .7621 edpllp_com ENVIRONMENTAL DESIGN ec PARTNERSHIP, LLP. 900 Route 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp.com EXHIBIT A SEWER SERVICE DISTRICT EXTENSION DESCRIPTION +QUEENSBURY, NY SEWER SERVICE DISTRICT OVER ALL THOSE CERTAIN TRACTS, PIECES OR PARCELS OF LAND SITUATE in the Town of Queensbury, County of Warren, State of New York lying along the westerly line of Bay Road (County Road No. 7) and being further bounded and described as follows: Beginning at the point of intersection of the westerly line of said Bay Road with the common division line of SBL#296. 11 - 1 -45 generally to the south. and SBL#296.7-1-2 generally to the north; Thence along said common division line, in a general westerly direction to the easterly line of SBL#296.7- 1 - 1 S; Thence along the common division line of said SBL#296.7- 1 - 18 generally to the west and said SBL4296.7-1 -2 generally to the east, in a general northerly direction to the point of intersection of said common division line with the southerly line of SBL#296.7- 1 -4; Thence along the common division line of said SBL#296.7- 1 -4 generally to the north and said SBL4296.7-1-2 and SBL##296.7-1-3 generally to the south, in a general easterly direction to the point of intersection of said common division line with the aforesaid westerly line of Bay Road; Thence along said westerly line of Bay Road, in a general southerly direction to the point or place of beginning. The above described Sewer Service Disirict Extension is intended to include all of those parcels as contained within the above described area as shown on the Warren County Real Property Tax. Map in the Town of Queensbury, NY, and is not intended for the conveyance of Real Property. 1 Greater Queensbury Consolidated Sewer District ENVIRONMENTAL DESIGN Service Area Extension #7 IQ= K I PARTNERSHIP, LLP. APPENDIX D LIST OF INCLUDED PARCELS 900 New York 146 Clifton Park, NY 12065 (P) 518. 371 .7621 edpllp.com A ENVIRONMENTAL DESIGN Oct PARTNERSHIP, LLP. 900 Route 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp Corn APPENDIX D LIST OF PARCELS INCLUDED IN DISTRICT EXTENSION #7 Tax ID Address SBL#296.7-1-2 and 296.7-1-3* 575 Bay Road *Recently Merged 1 Greater Are Extension Consolidated Sewer District PARTNERSHIP, dE51GH Service Area .Extension 97 PARZNfiRStfiIP, I.I.P. APPENDIX E PROPOSED DESIGN DRAWINGS 900 New York 146 Clifton Park, NY 12065 (P) 518.371 ,7621 edpllp.com K w!!, GRADING PLAN LEGEND: ,N 1 x rr ew ,x-w.arz-xxiw m m �- _A - , ,"a -�.-."r'�ft=^G'�'•'+"l_/"�'a^c�� -.i`.-�^�.i�e- "' :' �Aen+6m.a�- e _ _'../°e"`��,.,-'e' _ J'� :e.+�"<.���_.Y"-tee.--tu�ra.�,a..n-: ry was wwno um W�e (\/ L 1 — _ _ ,r.�. 1. _.� ._',�-,�-��� - `�.-_.—_�-._ -SEt---- -1---_,.,_„�„�`"� •\\ "� \i ooOom cvrv,unVuuo au. 1 � � 1 G o -. wn✓en a[urnr N� .-t� n: Z A i i Yi � - � awawsm ua ea.o 1 dam � �• r-�--- °� // GGG-i .. ��Q F v a 0 xx Q z j -- m W yom a„a, m. I �V' �0� 1 m - W \ O "w It W m� Q o z t() W,o 1 aa.m m 1 RF_.TI.SOR3 rvw.stwsx smai wu„m, � �T - .� 000 (y .wo onvmx*o p axrwum i� I e w. i 1 -- ----:, tea« p ro 00 r >.x (1 of I / — i r � C� Y ' ', � � /•.,- Y �— ---fie� ---� �3 'vN� avww 11 I I 9 ............- .41 t� �•. ..m.W.epww � pg NOT FOR 5 x w ro nrorecr row er \ eel ovmm ww 5 CONSTRUCTION l uxE awo 1 ��/ i eer mom': E � our- 1 pox wH n ,�.,_. o �.� ur,ss•`aN an `_o- �, � � ( j 1 GRADING AND � 1 b w .,f -`� �u-'.�✓�.p-"--"--'a-�-"-'_-"-."_"_"-' „-o/-�._"_"--"_� .. �"�` � 1 '� i UTILITY PLAN � b-w i - ✓I l s�E - _ _ ._. -------' 8 of 19 E - e 1 .-._.- m�.H tln t[celw u l � AREA GRADING PLAN LEGEND: wa . ^ o �I ti •\� �� \ \ r --vrtn ox cxsssm a.ua Z'Z vzes ACRES I 1 I I,.,s ,� `„ \• .� \\\\\\\ % �� i�� V nnmo.m uv.nwu O .v. Z.a. Q Q v t 009 kmk w I ,F, •�\'..;\t '( '1 ` \t\_ \ `\\ �,I I ` I/ / I n,.�' ^ \ O W ED ¢d a o. v O [ o ED a z 1 , 0I�y o T, /I Q - } - m / m 0 of o� , a ww x t w �— t_ nines�n IIII � NOT FOR 1 ,v w/wr-� xcm,e x \ ` }' l I � CONSTRUCTION 1 rzn/swxm one 51, : sT• ��w„x,A„c w,_ �- - __ - sIEET TITLE GRADINGAND It curer,ttc V" -1,owRu AI m�xumr, UTILITY PLAN x N 1 eenvwc same 1 wa emo m�+w m m 7 __—_-_� vwanroXOwmnomoxt i r%1 9 of 19 r —��,� x .•� umwwL ro w — ,°xe pa�m°xom pow, ���,<`�-wxa �.� .m � .�vwn�ww,wn�w,x o ;s -u/v rmwus �"E� e Usnc wuiva,ut g & v ra IS eortou rw�ce "r°`" xrwn( amv,cmiuTuc) xxvm nun coxarars. u+auv'wmo[�i®nv��wia xro[e�u.1flY O ,%stm un,w.u. n uv x,wxxr w.rt wn �`F da tunas rwuuiY wens° m ' vi vxw co s¢sam — �. mistwf0fl�i. vwucmxwmxr�xRitunu+. s « .,. ox n e oursm[or uL wrz a cone w'v°n2c„m ,m part worm uux pwa,ro amox�as'rou m mrvn�aroa� yr mxv ucrtn , � ps IM-1 IS— wxm vex w-------- un,vanc J' nox «� ou o a x[.naxrwxo.„ox �o ,. w.,a,w,°[„a n -''--��- owx Z a »MMxIM,,g p m a"TI—«enrox. s1 + w O��� h m TAPING SADDLE VALVE U O \SAITARY TRENCH'm $ Z SANATRY SEWER CLEANOUT S uj aJQO I- w z REWIRED AREAS(SO.Ff.)+ hiRUOST R _ —ftSSB) ER TrIRUST BWOCK 5 ERTICAL fir.. Q Q FOR TiRUST B OCKS E TRENCH LL ORIGINAL GROUND(FEET) O -rwvum s uv xros.m ,wwxs+s ae;�I/µ` nnaum s ELFVryAx�aznm['n un r c �O � Q n HYDRANT INSTALLATION F �W Q :c ., o ax o.x ,.zox otnx W w ao so o °t ss. >•,ao ,s>ce ,o `a !U ..Lv< 'Mm I., i amxau,mrru,tmcv xtvetE_».0 w»anc 9oH[re.oR.ws oL romre'cwxnmw[w,n vwrtumraca<xxmtm,ux[nwoxciw sv�"x umwwv ur yrs,wµ crsuilv t iu,A.oDocoWoaao srao�vwcxmvwuxv uway.[o[a.,u —v—u�— ma(Apu[w ws's WY 12 O_—_ZO = Q RUST BLOCK NOTES: Z S Ow ,A Q1-9ro u { __ a m _ zrum,no uc mr. v zmaN spm)v 'acarm,mi w vm.+� - - I a iYVF.1 ME J e xmLuu wtssuac swewu[ _ srzty v n�m w uxu ua essrn w uw,aE spL euvuw wwry°r xx m'[r mw vmwn[ o n.x omm wa wxawxs wwxxrolm. .�xnr x[ "°'8tl1 L twwaw�.K,wR=rsw�o,pmsoA g PESOFHYDRANTINSTALLATION .--. — wrarta a�mr:w.,�wp[n TY ---------- _w xa.TOsr�Le ------------------------ ,. m[w. wxm� ,°x[wpr m[,xmas.x.u _--- -- - s -- :. - ----------------- s" THRUS"F BLOCKS ----- " orroscuu Y Y yfS t ,u netts aznnvm ro vz xcnaxm tv f"— trot uurt or OmVpew<E,r oft 'n,4u«'« ww•mM __canwcrays[vzxsc av"xu.«wxo --t s — PWva1E 9faN Irn wurvxicw.sowu�`� strmxwi'mxro's'r'Ruio�-. ------------------- tv vw--------------_---- � �,• $ wo.nC-+s omwwm Cox wart/ w srvcwL'ev s' sm aA.xa,.a v x,e xm i _ - a N awn tK D 7z - .. rl fill I�l_ - a�a«a[,ncmamxs I -.�;.._..._-:.-...�- - -rIT in f-rfr�,r[= I. �r- _li ._�17-�: xoaxm pp wt n II _ HL - mp oF,.xo .d- w $ awe axx ,.v pm.p.,. smwr anaa cx-an »R.w per - SAS NOTED r�1ri� xmroAo.E �m4 all it .tunl�lLlgMIT"Itirl lil L't .t J IJ1--f —�- a"^ pxi oxw. NOTFOR iilLlT�IRI ICI.I�f I7 ril I=il III. —II—III=I ff — w»,�w„Knxc-1 L_-III r Sc CONSTRUCTION +i tutu,¢1 awu�u..m.L wxv x mma xm,s.ox aaxr.ar ii=a e�— rwm muxv,xu 'vim/'sw°Rrvu.'�`warJOii :.rk;, - vv - Er turf k x) r vw(%.��wn"xui"u5`�"SnEn urc�NP, aiaM'K�'sWiR'.�smi � l-�.iT " > xrowr«cwx wKxn[ w.�mm � «smsrot,-at/[ �._ :.z? a.oa[ SITE DETAILS s wac.[naro,,as m w,arxvw xn,[�Ls.[axmRL„c ro, nmaa ,ems pc.,,°05 m, w»:µ°amrmc,xc cwnmx a[°a«.wota a x,rosr sac:. �x zu[.%,w maxn.wwae sxn.awe,.:tox[ox xaxax«,xmc utmw.c r�mw raora a,an,m ca„rx.,Lc x.,mL.s,ca,maRw m„rz ww,.xmono yr _..: b.xn wELn,c,xr a[.b.,tm xmatronx,o««,xmr»=T7 n snt.erz w,mw:w,xo, sxxo,cx..u,s,w[a awns m,x[� mn��w[xro o<xrs�M r«ioxw — sxx (�WATER TRENCH DETAIL n GRINDER PUMP TO SANITARY FORCE MAIN PROFILE 16 Of 19 Y wxarcrt cmuanxs GRINDER PUMP INSTALLATION NOTES' 8 w m,uxua s°vs a� — e uwmxc - wau)� / � wv'cwcurt Humus , �x°�w, cvv[w wc,,ny eunrvm vrt n°u°[wxs�auc�m nr we m[u nnv b a' Z—='rew xE� 01 PIPE SECURNQ DETNE or...xxa wvsc.xwns nGGBEG9E-n4TES �• x _ x PTPESEGIlEId'&ncTax ,°o u+v a[ ,x[°x r.riv n x rz mu�nu vr"r`rwvvu u.nw,ua<<wr.cr & wRx.°.o„ w->ox o.,snxv i,°vnc �xs*u.oxrw"x,w°°[vat:°µc ."ww"m°cx t�,w As uorzx a,ar o ,x,>xc ° ry W m oipv?°moa sm/10w'wq� xxuo u.wwxe caoreenm - "ems nw vacuvvuunw,o me cram rw,u++cw nxv uwwvu xwm,v 'J Z (!j d� Poi"�x.nw«[u W U, z mPow"/:s p" ." _ n we a..w. ro oe A,:x,.o.xs7a-» - .xe w"n x r°[w«xe<,®av N,an„c ao»w w,ncw omw•wxwn, ro xa ws,n P[ LL x... ra Q wA>. xoo Z MA"xn[x CEcnox er (DETA( _ � »,M i,"`w [«wwan W a Q 11 Al " nxk .,.x,<x,an,«xwro W Q Z G aw sw, p o W CaC Q .a11 wxx[ce„xy� xauM.w sw ,a e°,R cv.wrm srros mew.»tvxx n.exn uxm.mz.uv.�n /Bum c ormen W srtur[ t O m Ln Z vu xm u,uem) .'7 r u wrrx oC 1L ua,v rc am rawer u,m a� u'a unarm m n cwam rce owx»s n w, w.nw°ou uxnm>s¢. W Q W �`w Q K ELECTRICAL NOTES FOR SIMPLEX GRINDER PUMP. m Q d o o 0 1 .�wv>«, o 0 0 o xxa=,wan v«cex«wTro a� cx�,1 O o o z z " �1 PRESSURE SEWER-EOL CLEAN OUT PRESSURE SEWER IL CLEAN OUT " a n d�,(�0 000 o i S v.wa.ww.v¢.r un xcc sn,0..wn urx xus rtn xpvwn .^�. A' ,e.ut ntcrwcu unmans uao s,xt xs ue.uzw. G,e,muc muu ec xc uacmcu muds.uxn,a amrs,as axavcuxs a>.ur xwv w ra --- ----------- ,zrnrmwi,¢Brrmnw u,x[[-a,c wur aao,wswxx[cr. -. ' n rnm me waxu,r ssmw a ra 4 zz.w.m u.rwo,r"ia`c°wm timm,o isauia vnnrv.0 ur�v[wawwm m n2 woxm,m a" 5 GOCSSD NOTES $ k E un g .ro aNdw m¢wa¢U wm:w ^ ma roc g Baw¢wtwemx main. rz>wc m,uxa a• �. lHE CONTRACTOR SWILL NO—CQCSSD AT LEAST.NOURS V—TD THE SPORT Of ANv SONER RELATED WORK CAS AS NOTED - NOT FOR CONSTRUCTION 5 S SITE DETAILS , a cT. 17 of 19 r A Greater e t' Consolidated Sewer District ENVIRONMENTAL DESIGN Area Extension Service Area Extension 47 PARTNERSHIP, LL!? APPENDIX F CONSTRUCTION AND CONNECTION COST ESTIMATE 900 New York 146 Clifton Park, N`! 12065 (P) 518.371 .7621 edpllp-eom GCID ENVIRONMENTAL DESIGN PARTNERSHIP, LLP. 900 Route 146 Clifton Park, NY 12485 APPENDIX F ENGINEER'S OPINION OF CONSTRUCTION AND CONNECTION COSTS EXTENSION OF SEWER 575 BAY ROAD, QUEENSBURY, NY February 2024 WORK QUANTITY I UNIT UNIT TOTAL ACTIVITY PRICE SANITARY SEWERAGE 1.25" PE 4710 <14 ft deep 180 LF $55.00 $93900,00 1.5" PE 4710 <14 ft deep 750 LF $65.00 $480750.00 6" PVC SDR 26 laterals 160 LF $85.00 $13,600,00 E-ONE WH484 Qua dplex Grinder Pump Stations 2 each $25,000,00 $507000.00 Precast Concrete Cut-In Manhole 1 each $15,000.00 $15,000.00 Inspection and Testing 1 L5 $7,500.00 $7,500.00 Construction Cost Estimate $1449750.00 CONNECTION FEES Buy-In Fees 17,252 GAL $2.37 $40,887.24 Permit Fee 1 each $125.00 $125.00 Town Soft Cost (legal, etc) 1 each $10850.00 $1,850.00 One Time Connection Costs $423862.24 TOTAL ESTIMATED COST $1871612.24 1 Greater Queen Extens Consolidated Sewer District ENVIRONMENTAL DESIGN Area Service Area Extension #T 19 PARTNERSHIP, LLP. APPENDIX G ESTIMATED ANNUAL COSTS 900 New York 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp.com APPENDIX G GQCSD EXTENSION #7 ANNUAL COSTS Property ; Surveyed Area Equivalent Benefit Rate Est. FlcswLESt..55ewer Rent TOTAL ANNUAL Assessed Value Class/Use se Benefit Tax 90J1,BO4 Gal R£GVBRING IDAddress [Acres) Vnks 2024 {GalJDay) Annually) € _ CDSTS 296.7-1-2,3 535 Bay Raad 16.25 $672.7d0.06 B 76 $21.91 51,6b5.27 17,252 34,633.39 j 536,298-56 APPENDIX F ENVIR Greater Are Extent' Consolidated Sewer District PARTNERSHIP, DESIGN Service Area Extension #7 PARTNERSHIP, LLR APPENDIX H INDUSTRIAL SURVEY FORM 900 New York 146 Clifton Park, NY 12065 (P) 518.371 .7621 edpllp.corn Town of Queensbury Department of Wastewater 823 Corinth Road, Queensbury, New York 12804 Phone: (518) 745-5589 * Fax: (518) 798-3320 INDUSTRIAL WASTE SURVEY Section 403,8(f)(2) of the General Pretreatment Regulations requires Publicly Owned Treatment Works (POTW) to identify and locate all possible industrial users subject to a pretreatment program and to identify the volume and character of pollutants discharged by these users. Industrial wastes that contain certain pollutants cannot be adequately treated, interfere with operation or contaminate sewage sludge at conventional Municipal Wastewater Treatment Plants and should not be discharged to Municipal Sewers unless permitted or pretreated. The results of this survey will enable the Town of Queensbury and the city of Glens Falls to identify all Significant Industrial Users who may be required to submit an application, with the city of Glens Falls, for an Industrial Wastewater Discharge Permit. NOTE.' In accordance with Title 40 of the Code of Federal Regulations (CFR) Part 403, Section 403 . 14, information and data provided in this survey which identifies effluent data, such as the nature and frequency of discharge, shall be available to the public without restriction . Requests for confidential treatment of information shall be governed by 40 CFR Part 2. Any information claimed as confidential shall be clearly identified as such, and each page on which such information appears shall be clearly marked "CONFIDENTIAL BUSINESS INFORMATION If additional space is needed to answer any question(s) attach additional sheet(s) and so indicate in the space provided in this survey. If a response to a question is an estimate indicate so in the answer. 1 . Company Name SCHERME HORN REAL ESTATE HOLDINGS LLC 2. Mailing Address 536 BAY ROAD #21 QUEENSBURYNY 12803_, 3. Service Address 575 BAY ROAD. QUEENSBURY NY 12804 4, Parent Company (if any) S . Address of Parent Company (if any) 6. Name and Title of person to contact in reference to survey: RICHARD SCHERMERHORN Address: 53G BAY ROAD #2 QU ENSBURY NY 128 3 Phone Number: 518 Ana 0674 7. General description of the business and uses: PROPERTY MANAGEMENT COMPANY 8. Do you discharge to the POTW? YES 9. Does the discharge consist of domestic wastewater only? YES If "yes", no need to complete remaining questions. 10. Type and amount of finished products or services where Standard Industrial Classification (SIC)* Codes are applied : Current, Daily, & Annual Production (Note Units: Product/Service Production Process SIC*Code Air Dry, Tons. Etc) 11. If types and concentrations of pollutants contained in discharge are known please list them . (Indicate if oil and/or grease are discharges to sewer). If not known, describe major products manufactured or services supplied. 12. Volume of wastewater to be discharged to POTW: A. Average daily wastewater discharged to POTW: (If unknown, use water consumption rate) B. Is the rate of daily discharge continuous throughout each day? If "no", specify the time(s), duration(s), and volume discharge(s) throughout the day: C. Three minute peak wastewater discharge flow rate: D. Does any of the above vary seasonally, monthly, weekly, or daily? If "yes", specify the above information for each separate period referred to: E. Any other disposal involved that is not directed to the sewer system. 13. Does the facility currently have a pretreatment program or a proposal for a pretreatment program? Describe. I have personally examined and am familiar with the information submitted in this document. The information herein is true, accurate and complete, and contains no misrepresentations of fact or omissions of fact necessary to make the statements contained herein not misleading. Date: Signature of Official ; dd CARRIE L� BLACK Receipt Receipt Date : fl2,/13/2024 02 : 47 : 47 PM BARTLETT PONTIFF STEWART & RHODES PC RECEIPT * 2024590518 Recording clerk : SSN Cash Drawer : CASH1 Rec ' d Frm : BARTL.ETT PONTIFF STEWART & RHODES PC Rec ' d In Person instr#F : 2024-0765 Bk/Pg : 6895/300 l DOC : DEED V DEED STAMP : 1511 j OR Party : SCHERMERHORN RESIDENTIAL HOLDINGS LP EE Party : SCHERMERHORN RESIDENTIAL HOLDINGS LP Recording Fees cover Page 55 . 00 Recording Fee $40 . 00 cultural Ed $14 . 25 Records Management - county 51 . 00 Records Management - state $4 . 75 TP584 55 . 00 RP5217 - county $9900 RP5217 All others - State $241 . 00 i Transfer Tax Transfer Tax - State S0 . 00 DOCUMENT TOTAL : -- - -> 5320 . 00 ` Mi sc Fees overpayment $1O . 0O Receipt Summary Document count : TOTAL RECEIPT : - ---7 $330 . 00 TOTAL RECEIVED : - ---> $330 , 00 CASH BACK : - -- -> $0 . 00 PAYMENTS Check # 54776 -> $205 , 00 SCHERMERHORN RESIDENTIAL HOLDINGS LP Check * 181161 -> $125 . 00 Phone # (518) 761-6484 1340 State Route 9, Lake George, New York 12845 i BK 6395 PG 300 0211312024 02;47:47 PM 5 Paws DEED Instr S 2024-0765 Carrie L. Black, Warren CatU" Clerk RECORDED WARRANTY DEED WITH LIEN COVENANT THIS INDENTURE made the VIAII� day of February, 2024 between SCHERMERHORN RESIDENTIAL HOLDINGS, L.P., a New York limited partnership, with an address of 536 Bay Road, Suite 2, Queensbury, New York 12804, party of the first part, and SCHERMERHORN RESIDENTIAL HOLDINGS, L.P., a New York limited partnership, with an address of 536 Bay Road, Suite 2, Queensbury, Now York 12804, party of the second part, WITNESSETH, that the party of the first part, inconsideration of One Dollar (S1 .00) lawful money of the United States and other good and valuable consideration paid by the party of the second part, does hereby grant and release unto the party of the second part, its successors and assigns forever, ALL THAT TRACT OR PARCEL OF LAND, situate in the Town of Queensbury, Warren County, New York as more particularly described in Schedule "A" hereto annexed, which demonstrates the merged parcel. BEING the parcels described in a Warranty Deed from Circle K Ranch, LLC to Schermerhorn Residential Holdings, L.P. dated January 24, 2023 and recorded in the Warren County Clerk's Office on January 30, 2023 in Book 6748 at Page 255. It is the intent that this conveyance to MERGE TAX MAP PARCEL NUMBERS 296.7-1-2 and 296.7-1-3 which are currently owned by Schermerhorn Residential Holdings, L.P.. Together with all right, title and interest, if any, of the party of the first part in and to any streets and roads abutting the above-described premises, to the centerline thereof. Together with the appurtenances and ail the estate and rights of the party of the first part in and to said premises. To have and to hold the premises herein granted unto the party of the second part, its successors and assigns forever. And said party of the first part covenants as follows, First, that the party of the second part shall quietly enjoy the said premises; Second, that said party of the first part will forever warrant the title to said premises. Subject to the trust fund provisions of Section Thirteen of the Lien Law_ 1N WITNESS WHEREOF, the party of the first part has duly executed this deed. SCHERMERHORN RESIDENTIAL HOLDINGS, L.P. By: Schermerhorn Management, Inc., Its General Partner By, Richard P. Schcrmerhom, Jr., President STATE OF NEW YORK ) ss: COUNTY OF WARREN } On the k day of February, in the year 2024 before me, the undersigned, personally appeared Richard P. Schermcrhorn, Jr., personally known to me or proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed to the within instrument and acknowledged to me that he executed the wine in his capacity, and that by his signature on the instrument, the individual, or the person upon behalf of which the individual acted, executed the instrument. n / �- Notary publier Record and Return � CHROME HAta>��� Jonathan G. Capper,, Esq. ADNLA fAMMy Pubft=8& tr of N"York Bartlett, Pontiff, Stewart & Rhodes, P.C. No,02HAa43p324 {Inc Washington St, PO Box 2168 � ClualW In SWAIMM Glens Falls, NY 12801 J 1.,IL,.11,-1'M1'M+-kI -W14 375 Ilns'_NUAD MhRt&Rl 40 1,l W411 2 r a SCHEDULE "A" All that certain piece or parcel of land situate, lying and being in the Town of Queensbury, County of Warren and the State of New York, more particularly bounded and described as follows: BEGINNING at a point in the westerly hounds of Say Road, said point being the northeast corner of the Sands as conveyed to RJM Oide Coach Queensbury LLC; thence running in a westerly direction along the northerly bounds of RJM South 82 degrees, 28 minutes, and 36 seconds West, a distance of 1244.27 feet to a capped iron rod found in the center of a strcatn, marking the northwest corner of the lands of RJM and the northeast corner of the lands as conveyed to Terri and Thomas Kubricky by deed book 6666 at page 67; thence running in a northerly direction along the centerline of the stream and along the easterly bounds of the lands as conveyed to Country Club Farm LLC by deed book 6363 at page 32 a distance of 813 feet, more or less, as it winds and turns, to a point along the southern boundary of the lands as conveyed to Winifred T. Streeter and Thomas Lynnwood by deed book 6394, said point having a tie line from the previous course of North 60 degrees, 37 rninutcs, and 50 seconds West, a distance of 725. Io feet; thence running in an easterly direction along the southerly bounds of Streeter and Lynnwood and the lands as conveyed to Canterbury Woods Apts. LLC by deed book 5635 at page 19 the following two courses and distances: 1 .) North 82 degrees, 47 minutes, and 05 seconds East, a distance of 580.10 feet to a point; thence 2_) North 82 degrees, 44 minutes, and 37 East, a distance of 1096.68 feet to an iron pipe marking the northwest comer of the lands as conveyed to Circle K. Ranch LLC by deed book 6363 at page 36; thence running along the bounds of Circle K. Ranch LLC the following two courses and distances: 1 ,) South 10 degrees, 08 minutes, and 00 seconds East, a distance of 392.80 feet to a railroad spike; thence 2.) North 83 degrees, 12 minutes, and 00 seconds East, a distance of 129.49 feet To a point in the westerly bounds of Bay Road; thence continuing in a southerly direction along the westerly bounds of Bay Road South 07 degrees, 36 minutes, and 56 seconds East, a distance of 33.03 feet to the place and point of beginning, containing 14.99 acres of land to he the same more or less. Bearings given in the above description refer to Grid North. SUBJECT to easements of record. ALSO, ALL THAT CERTAIN PIECE OR PARCEL OF LAND situate in the Town ofQueensbury, Warren County, New York, located on the westerly side of Bay Road and which parcel is more particularly bounded and described as follows: BEGINNING at a point in the westerly line of Bay Road at the southeasterly corner of lands conveyed by Robert Edwin Grahl to Edward Robert Grahl by deed dated February 14, 1976 and recorded February 19, 1976 in Book 594 of Deeds at Page 984 and running thence north 821 20' west along the northerly line of a 30 foot wide lane owned by the Glens Falls Country Club for a distance of 145.16 feet; running thence north 41 20' east along the easterly line of said lands now or formerly owned by the Glens Falls Country Club for a distance of 392.8 feet; running thence south 82' 53' east through the lands of Edward Robert Grahl for a distance of 158.81 feet more or less to the eastern bounds of the lands of Edward Robert Grahl and also being the westerly bounds of Bay Road; running thence south 6' 17' west and along 3 1 y the westerly hounds of Bay Road a distance of 393.8 feet more or less to the point or place of beginning. Excepting and reserving there from all that portion ofthe above described parcci conveyed by Edward K. and Robert E. Grahi to Warren County for highway purposes and also subject to of i casements of records, but intending to convey hereby all interests of the Grantor in any property lying between the boundaries of Day Road and the property hereinbefore described. Subject to all covenants, conditions, casements and restrictions of record affecting the premises. 4