Loading...
INSPECTION WORKSHEET 03062024 INSPECTION WORKSHEET Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: RC-0056-2022 Case Module: Inspection Date: March 06, 2024 Inspection Status: Passed Inspector: Mark Smith Inspection Type: Residential Final Job Address: 1481 BAY RD , Parcel Number: Contact Type Company Name Name Checklist Item Status Smoke Detectors: PASS Inter Connected PASS Guards at stairs,decks,patios 30" + above grade PASS Battery backup PASS As Built Septic System PASS Basement wall insulation R- value verified PASS Low flow toilet 1.3 gal/flushing cycle PASS Basement stairs closed rise greater than 4 inches PASS Propane Tank: Proper Setback from Prop Line/Struct PASS Basement Egress: 5s.f. window w/sill or Bilco door PASS on all levels w/gas appliances (i.e. furnace) PASS Guard at stairwell at 34" or more PASS Final Survey Plot Plan PASS OK to Issue C/O PASS Interior/Exterior Railings 34 to 38 PASS Roof Complete / Exterior Finish Complete complete exterior siding and trim PASS Jack posts in basement lagged at top and bottom PASS General Comments 8/3/23 final residential inspection not approved, please address the items listed below and call for recheck. - provide an updated manual S & J showing the change to geo thermal heating and cooling equipment. - provide third party sign off for installation of geo thermal heating system -a final inspection by the Fire Marshal for the wood burning stove is required -condensate line can not drain into the floor drain in basement. -thermostat needs installed in main house. -provide blower door test results. -provide proof of final electrical inspection. -basement ceiling will need to be sheet rocked or an approved thermal barrier to cover insulation. complete exterior trim, siding, and soffits. complete interior trim, installation of doors, and work at upstairs bathroom. -ridged insulation at exterior of foundation will need to be covered or cut below grade. - A final inspection by Code Compliance Officer Bruce frank will be required. 8/9/23 partial approval for final inspection. -Approved for temporary certificate of occupancy only. complete the items listed below for final approval - provide a updated manual S&J showing the change to geo thermal heating and cooling system - Provide third party sign off of installation of geo thermal systems, - condensate line cannot drain in to floor drain in basement. - install thermostats in there permanent locations. - Basement ceiling will need to be sheet rocked or have an approved 20 minute thermal barrier installed to cover the insulation. - Complete exterior trim siding and soffits. - complete interior trim, install doors, work in up stairs bath room, install permanent guards at stairs and loft at second floor. - ridged insulation at exterior foundation will need to be covered or cut below grade. - final approval from Code Compliance Officer Bruce Frank 2/8/24 partial approval for final residential inspection. - provide updated manual S& J for changes at the heating system - provided third party sign off for the geothermal heating system that was installed by the homeowner - final inspection and sign off from Zoning dept. 3/6/24 final inspection for single family dwelling approved. all items listed above have been completed/received. PASSN/O Handrail 4 or more risers PASS Handrail Termination at Newell Post or Wall PASS HRV or ERV Installed per Bedroom Requirements PASS Grade away from foundation: 6" down, 10' out complete site work PASS Carbon Monoxide Detectors: PASS 4+ Deck Joist Ledger Connections-24" From Ends PASS Wood deck: 2'+ from grade dia bracing required PASS Furnace/Hot Water Heater operating PASS OK to Issue Temporary C/O PASS Not less than 3' horiz from opening of bthrn PASS Arc Fault Breaker Habitable Spaces PASS Bathroom Fans, if no window PASS Outside Spigots have Air Gap PASS 3" Plumbing Vent through roof minimum 18 inch PASS Duct work sealed properly PASS Fin Elect; Energy Saving Light Bulbs 90 Percent common wealth PASS All Hot Water Systems: 3/4" or larger piping R-3 PASS Gas Shut-off Exposed & Regulator 12" min abv grd PASS 6" clearance to sill plate PASS Interior privacy/trim/doors/main entrance 36 PASS Outside every bedroom area PASS Blower Door Test Certification PASS Guard at deck, porches 36" or more PASS Dryer Duct Max Length 35', Labeled Over 35' PASS Every level, Every bedroom PASS within 10' of all sleeping areas PASS Bathroom / Kitchen Watertight complete up stairs bathroom PASS Relief Valve ,Heat Trap/Water Temp 110 deg or less PASS Fresh air supply 3' from grade PASS Platform at all exterior doors PASS Window guards req:<2' above floor/6' above grade PASS Deck Ledger-Bolted per Code PASS 4 inch Building Number Address visible from road PASS Foundation insulation to floor PASS Plumbing fixtures complete work at upstairs bathroom PASS Fresh Air Intake PASS Emergency egress below grade walk out basement PASS Mark Smith Code Enforcement Officer