Loading...
RC-0745-2022 Office Use Only ADDITI • 'V jlOil .' ' l Permit#: - " 5 -2t� 22. • F L� Town of Qeensbury Permit Fee:$ 2F5 742 Bay Road,Queensbury,NY 12804 DEC 2 7 2022 P:518-761-8256 www.•ueensbur .n Invoice#: . ✓T TOWN OF QUEENSBURY Flood Zone? Y (cReviewed B '(�` / BUILDING & CODES Project Location: 57 Revere Road Queensbury, NY 12804 Tax Map ID#: 308.18-1 -47 Subdivision Name: PROJECT INFORMATION: TYPE: ® Residential ❑ Commercial, Proposed Use: ® Single-Family El Two-Family ❑ Multi-Family (#of units_) El Townhouse ❑ Business Office ❑ Retail ❑ Industrial/Warehouse El Garage (#of cars ❑ Other(describe ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 21 s.f. 1st floor: 2nd floor: 2nd floor: 3rd floor: 3rd floor: Basement (habitable space): Basement (habitable space): Total sq ft: 21s.f. Total sq ft: Small addition to enlarge mudroom and allow for a reconfiguring of interior doors. Scope of work to be done: Addition/Alteration Application Revised June 2022 -L ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 203000 2. Source of Heat (circle one): ❑ Gas CIOil ElPropane ElSolar ® Other: Existing Fireplaces/inserts need a separate Fuel Burning Appliances & Chimney Application 3. Are there any structures not shown on the plot plan? El YES 8 NO Explain: 4. Are there any easements on the property? El YES ® NO SITE INFORMATION: • Is this a corner lot? ® YES ❑ NO • Will the grade be changed as a result of the construction? El YES ® NO • What is the water source? ® PUBLIC El PRIVATE WELL • What type of wastewater system is on the parcel? UI SEWER ❑ PRIVATE SEPTIC DECLARATION: 1. I acknowledge that no construction shall be commenced prior to the issuance of a valid permit and will be completed within a 12 month period.Any changes to the approved plans prior to/during construction will require the submittal of amended plans,additional reviews and re-approval. 2. If,for any reason,the building permit application is withdrawn, 30%of the fee is retained by the Town of Queensbury.After 1 year from the initial application date, 100%of the fee is retained. 3. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 4. I certify that the application, plans and supporting materials are a true and a complete statement and/or description of the work proposed,that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 5. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 6. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: David Hutchinson SIGNATURE: f DATE: 1 2/1 7/22 Addition/Alteration Application Revised June 2022 $. CONTACT INFORMATION: PLEASE PRINT LEGIBLY OR TYPE, PLEASE INCLUDE AN EMAIL • Applicant: Name(s): David Hutchinson Mailing Address, C/S/Z: 98 Green barn Road, Hudson Falls, NY 12839 Cell Phone: ( )5186834608 Land Line: ( Email:creationstudios9@yahoo.com • Primary Owner(s): Name(s): Reid Grubbs Mailing Address, C/S/Z: 57 Revere Road Queensbury, NY 12804 Cell Phone: ( )9178738422 Land Line: ( Email:reidgrubbs@yahoo.com ❑ Check if all work will be performed by property owner only • Contractor(s): (List all additional contractors on the back of this form) Contact Name(s): Contractor Trade: Mailing Address, C/S/Z: Cell Phone: ( ) Land Line: ( Email: **Workers' Comp documentation must be submitted with this application** • Architect(s)/Engineer(s): Business Name: Contact Name(s): David Hutchinson Mailing Address, C/S/Z: 98 Green barn Road, Hudson Falls, NY 12839 Cell Phone: ( )5186834608 Land Line: ( ) Email:creationstudios9@yahoo.com • Contact Person for Compliance in regards to this project: David Hutchinson Cell Phone: ( )5186834608 Land Line: ( ) Email:creationstudios9@yahoo.com Addition/Alteration Application Revised June 2022 '1,4‘,,c'2s--D ._:?. Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (1 of 2) Two (2)full sets of plans V41. ' s Over 1,500 sq.ft. requires engineerintamp vz. Design loads on plans: 115 Wind Floor Loads 40 psf (North of Rte. 149 60) 50 Ground Snow Load Sleeping Areas&Attics 30 psf Calculations Decks 40 psf Wind design for lake front properties �"- Window schedule with glass size & main doors/Air leakage< .5 cfm for doors;< .3 cfm for windows/Tempered glass in bathrooms Ptkk- Door schedule/Main entrance 36" door "X(5,171- ( , Emergency Escape or Bedrooms& Habitable Space Above-grade: 5.7 sq.ft. VA--- Grade: 5.0 sq.ft. 24" (h)x 20" (w) minimum 44" maximum height above door Window control devices 24" or less 2nd story or 72" above grade Egress window from basement 5.0 sq.ft. �(`i , Floor system sizing per table 502.3.1 , Residential check ERI or Prescriptive method Driveway length: 300' or more-12'width required/500' or more,turnaround required Foundation drainage on plans, if required � r6" drop in 10' exterior grade , 5, U�?v tl/z,Framing cross section for each roof line,vertical fire stopping every 10'where required/joist spans pg. 127 ytc Ice &snow shield—24"from exterior wall / iatforms at exterior doors PA-Stairway headroom 6'8"; all stairs 36" width `, -Stair run and rise 1- 1A Winder run and rise tt Spiral stairs meet requirements t Smoke detectors—battery backup & proper location, interconnected Bathroom fixtures—proper clearance k. Hall width-36"width 1 ,4,- Handrails more than four risers on open sides )v( Railing&guards >30"/basement stairs included/closed risers more than 4" in height ets afety glazing notes for required areas .Qom, Garage fire separation:%" gable end/5/8" under living space &'/:" on walls/20 min. door ``-(( and closer C')C.l---14—ks7 Garage floor sloped ii jw_ pp Attic access: gasket seal & R-value equal to roof insulation NIA- Roof over 30"—22"x 30"/Crawl spaces 18" x 24" access Continued on back 4 --) Residential Plan Review Revised October 2021 Residential Plan Review: 1- and 2- Family Dwellings Y/N/NA (2 of 2) arbon Monoxide detector outside lowest sleeping area, on every level &interconnected N within 15' of sleeping area PIA-Soil test results, if required jA Septic to well or water line separation `-14- All paperwork signed '1C- Note on plans energy saving light bulbs 90% MA- Blower door test agency paperwork Op Floodplain Permit required-check map: 2 feet above flood elevation Hurricane clips required fYAK.) )'2 jz E5Floors less than 2 x 10 covered by%"gypsum or 5/8"wood panel )0C Manuals S &J required for heating system. Cold air return hard piped milk Separate room for draft HVAC or hot water heater with fresh air 1JHRV shown and calculations Mk-Baffles at eaves for insulations and knee walls J(p-Makeup air for range hood >400 cfm i('c--Continuous header for garage doors to end wall ) / A. Chimney rain cap shown for fireplaces !� Deck hold down shown not less than 4 lags and bolts per table 507.2 Residential Plan Review Revised October 2021 e. 0 Generated by REScheck-Web Software Compliance Certificate Project Grubbs Addition Energy Code: 2018 IECC 308.18-1-47 RC-0745-2022 Location: Warren County, New York Reid Construction Type: Single-family Grubbs, Project Type: Addition 57 Revere Rd R . mudroom) Climate Zone: 6 (8499 HDD) Residential Addition (enlg Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 57 Revere Road Reid Grubbs David Hutchinson Queensbury, NY 12804 57 Revere Road 98 Green Barn Road Queensbury, NY 12804 Hudson Falls, NY 12839 9178738422 5186834608 reidgrubbs@yahoo.com creationstudios9@yahoo.com Compliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 9 Your UA: 9 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Gross Area Cavity Cont. Prop. Req. Prop. Req. Assembly or R-Value R-Value U-Factor U-Factor UA UA Perimeter Ceiling: Flat Ceiling or Scissor Truss 21 38.0 0.0 0.030 0.026 1 1 Wall:Wood Frame, 16"o.c. 88 21.0 0.0 0.057 0.045 5 4 Window:Vinyl Frame 9 0.290 0.300 3 3 Floor:All-Wood Joist/Truss 21 30.0 13.0 0.023 0.033 0 1 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. David Hutchinson / 12/21/22 Name-Title Signature Date -- 0 0 er 10 °F Nell Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 1 of 9 0 REScheck Software VersionChecklist: REScheck-Web Energy Code: 2018 IECC Requirements: 38.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and i I❑Complies Requirement will be met. 103.2 documentation demonstrate }❑Does Not [PR1]1 energy code compliance for the• Location on plans/spec:A- # !building envelope.Thermal ;❑Not Observable 101 l envelope represented on I❑Not Applicable construction documents. , 103.1, Construction drawings and 11=1Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ❑Not Observable (.9,) Systems serving multiple Applicable dwelling units must demonstrate compliance with the IECC i 1 j Commercial Provisions. 302.1, 'Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 !sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling ['Not Observable ,B, `Manual J or other methods Btu/hr Btu/hr approved by the code official. ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 2 of 9 Section # Foundation Inspection Complies? Comments/Assumptions & Req.ID 303.2.1 IA protective covering is installed to ❑Complies Requirement will be met. [FO11]2 protect exposed exterior insulation DDoes Not B i and extends a minimum of 6 in. below ONot Observable Location on plans/spec:A-101 grade. ❑Not Applicable 403.9 (Snow-and ice-melting system controls ❑Complies [FO12]2 installed. ❑Does Not 41) ['Not Observable 1 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 3 of 9 f Section Plans Verified Field Verified # Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions &Req.ID 402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.5 ['Not Observable [FR2]1 ❑Not Applicable 111) 303.1.3 U-factors of fenestration products 1 I❑Complies Requirement will be met. [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable Location on plans/spec:A- taken from the default table. I 101 , l ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ;❑Complies Requirement will be met. [FR23]1 installed per manufacturer's I❑Does Not U' ,instructions. i Location on plans/spec:A- l❑Not Observable 101 ❑Not Applicable 402.4.3 Fenestration that is not site built ;❑Complies Requirement will be met. [FR20]1 is listed and labeled as meeting ;❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 I I or has infiltration rates per NFRC ti❑Not Observable 400 that do not exceed code I❑Not Applicable limits. 402.4.5 ;IC-rated recessed lighting fixtures1 ❑Complies Exception: Requirement is [FR16]2 !sealed at housing/interior finish I ;❑Does Not not applicable. and labeled to indicate 5.2.0 cfm 1 ;leakage at 75 Pa. 1❑Not Observable 1 ;❑Not Applicable 403.3.1 Supply and return ducts in attics I ❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not t®, >=3 inches in diameter and >= 1 R-6 where<3 inches.Supply and !❑Not Observable return ducts in other portions of Observable; Applicable the building insulated >= R-6 for i diameter>= 3 inches and R-4.2 for< 3 inches in diameter. i 403.3.2 Ducts,air handlers and filter 1 ;❑Complies [FR13]1 boxes are sealed with ;❑Does Not ,) joints/seams compliant with International Mechanical Code or ❑Not Observable International Residential Code,as 11=1Not Applicable applicable. ; 403.3.5 Building cavities are not used as } i❑Complies [FR15]3 ducts or plenums. t 1❑Does Not ), ;❑Not Observable ❑Not Applicable 403.4 ;HVAC piping conveying fluids R- R- ❑Complies [FR17]2 I above 105°F or chilled fluids ❑Does Not below 55°F are insulated to>_R- ,� ❑Not Observable ,3. ❑Not Applicable 403.4.1 Protection of insulation on HVAC 1 ;❑Complies [FR24]1 piping. ; 10Does Not L9) 41=1Not Observable ❑Not Applicable 403.5.3 ;Hot water pipes are insulated to R- R- ❑Complies [FR18]2 I zR-3. ❑Does Not J I ['Not Observable ❑Not Applicable 403.6 ;Automatic or gravity dampers are j I❑Complies Requirement will be met. [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. [Not Observable ,❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 4 of 9 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 5 of 9 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 ;All installed insulation is labeled ;❑Complies Requirement will be met. [IN13]z I or the installed R-values ;❑Does Not 6, i provided. I❑Not Observable I , t❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ❑Not Observable ❑Not Applicable 303.2, Floor insulation installed per ;❑Complies Requirement will be met. 402.2.8 manufacturer's instructions and I❑Does Not [IN2]1 in substantial contact with the Location on plans/spec:A- V) underside of the subfloor, or floor ji❑Not Observable 101 framing cavity insulation is in i❑Not Applicable contact with the top side of 'sheathing,or continuous insulation is installed on the underside of floor framing and extends from the bottom to the I top of all perimeter floor framing I members. 402.1.1, Wall insulation R-value. If this is a R- R- DComplies See the Envelope Assemblies 402.2.5, mass wall with at least lh of the ❑ Wood 0 Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall 0 Mass 0 Mass [Not Observable [IN3]1 exterior,the exterior insulation SteelSteel ,4, I requirement applies(FR10). 0 0 ONot Applicable I 303.2 Wall insulation is installed per ;❑Complies Requirement will be met. [IN4]1 manufacturer's instructions. I❑Does Not Location on plans/spec:A- I 1'❑Not Observable 101 ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 6 of 9 • Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ['Not Observable 402.2.E PP[FI1] ❑Not Applicable i 303.1.1.1, Ceiling insulation installed per ` ❑Complies Requirement will be met. 303.2 manufacturer's instructions. i ❑Does Not [FI2]1 Blown insulation marked every 1 Location on plans/spec:A- 300 ft2. [Not Observable 101 I j❑Not Applicable 402.2.3 !Vented attics with air permeable '❑Complies Requirement will be met. [F122]2 I insulation include baffle adjacent i❑Does Not to soffit and eave vents that {❑Not Observable Location on plans/spec:A- ,extends over insulation. 101 1 1 ;❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [FI3]1 insulation ?At-value of the ❑Does Not adjacent assembly. Location on plans/spec:A- ! ❑Not Observable 101 I ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable , :Not Applicable 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [FI27]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 DComplies [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in [Not Observable !tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2.1 'Air handler leakage designated j❑Complies [FI24]1 'Air manufacturer at<=2%of '❑Does Not design air flow. ❑Not Observable I ' R❑Not Applicable 403.1.1 'Programmable thermostats ;❑Complies [FI9]2 installed for control of primary I❑Does Not i heating and cooling systems and i initially set by manufacturer to ❑Not Observable code specifications. I❑Not Applicable 403.1.2 ;Heat pump thermostat installed ;❑Complies [FI10]2 I on heat pumps. ❑Does Not [Not Observable ❑Not Applicable 403.5.1 i Circulating service hot water ;❑Complies [FI11]2 I systems have automatic or I❑Does Not Iaccessible manual controls. !❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 7 of 9 Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system j (❑Complies [FI25]2 fans not part of tested and listed ' I❑Does Not HVAC equipment meet efficacy j and air flow limits per Table Not Observable R403.6.1. ;❑Not Applicable • 403.2 ;Hot water boilers supplying heat ❑Complies [FI26]2 1through one-or two-pipe heating 1 ❑Does Not systems have outdoor setback ;control to lower boiler water Not Observable !temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ; EComplies [FI28]2 ,have a circulation pump.The 1 ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe.Gravity and thermos- ENot Applicable syphon circulation systems are not present. Controls for {circulating hot water system 'pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop 1 is at set-point temperature and no demand for hot water exists. 403.5.1.2 !Electric heat trace systems t❑Complies [FI29]2 I comply with IEEE 515.1 or UL {❑Does Not 1515.Controls automatically adjust the energy input to the I❑Not Observable heat tracing to maintain the i❑Not Applicable f desired water temperature in the piping. ! I 403.5.2 'Demand recirculation water j ❑Complies [FI30]2 systems have controls that ❑Does Not manage operation of the pump and limit the temperature of the ` ENot Observable water entering the cold water ❑Not Applicable 1 piping to <= 104°F. 403.5.4 Drain water heat recovery units ;❑Complies [FI31]2 !tested in accordance with CSA 1111Does Not I B55.1.Potable water-side pressure loss of drain water heat i❑Not Observable I recovery units<3 psi for i❑Not Applicable individual units connected to one I or two showers. Potable water- side pressure loss of drain water ,heat recovery units < 2 psi for individual units connected to three or more showers. _ 404.1 90%or more of permanent ;❑Complies [FI6]1 fixtures have high efficacy lamps. ;❑Does Not {❑Not Observable ENot Applicable 404.1.1 I Fuel gas lighting systems have ;❑Complies [FI23]3 I no continuous pilot light. 4❑Does Not ❑Not Observable ENot Applicable 401.3 ;Compliance certificate posted. ' ;❑Complies Requirement will be met. [FI7]2 ;❑Does Not ENot Observable ,❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 8 of 9 p Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 303.3 Manufacturer manuals for 1❑Complies [FI18]3 mechanical and water heating )❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Grubbs Addition Report date: 12/17/22 Data filename: Page 9 of 9 2018 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 0.00 Floor 43.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass & Door Rating U-Factor SHGC Window 0.29 Door Heating & Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments