Loading...
Inspection Report (02-08-2023) Illl 111 IIII llllllll llllll4l lllllllllllllll IIIIIII llllllllllllllllllll 111111111 fill���� �����lull fill llllllll���1�1 ll`1�1 llllllll fill IIIII IIIIIIUUUIII IIIIIIIIIIIIIII lllllllllllll4l IU llllllll lllllllllllllll 1111111111U IIII fill �1� 11111111 IIIII lull loll Illl lull ll r m V m o of a of I I i 1 IIIII�IIIII���IIIIIII��IIIIIIIIIIIIII��IIIII����������IIIIIIIIIIIIIIIIIIII�IIIIIIIII�IIIIIIIII��IIIIII�IIIIII���IIIIIIIIII�II�IIIIIIIIIIIIII��������IIIIIII�IIIIIIIIIIIIIIII�II�IIIII�����II�IIIII����IIIIIII�IIIIIIIIIIIIII�IIIIIIIIII�IIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIII Ilm��llllhlllllllll��lllllllllllllllllllllllll ���llllllll��llllllllllll�llllllll�llllllllllllllllllllllllllll�l�lllllllllllllllllllllllllllll��lllllllllllllllllllllllllllllllllllllllllllll'm���������������������������������������������������� Case Number: SEP-0040-2022 Case Module: Permit Management Inspection Date: 02/08/2023 Inspection Status: Passed Inspector: John O'Brien Inspection Type: Septic Job Address: 17 Honeysuckle Ln Parcel Number: 226.19-1-24 Lake George, NY 12845 Contact Type Company Name Name Applicant Environmental Design Partnership (EE Engineer Environmental Design Partnership (EE Granted Permission Steven Cardona Primary Owner Steven Cardona Checklist Item Passed Comments Building Inspector Notes True 6/30/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 7/28/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 2/8/23 Septic System Approved Soil Type: Sand True Size of Stone True C33 Concrete Sand Waterline separation distance True Building to Tank True 4"sch40 Tank to Distribution Box True -4"sch40 pvc Opening Sealed True End Cap True Absorbtion Fields: Total Length True -64'of Eljen Mats Foundation to Tank True 7' as per variance Engineer Report and As-Built True 6/30/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 7/28/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 2/8/23 Septic System Approved Well Casing Length: 50ft+/- True Location of system on property True As per approved variance Inlet&Outlet manholes 12"+ below grade True March 15,2024 Page 1 of 2 IIII 111 IIII llllllll 1l�lllll lllllllllllllll IIIIIII llllllllllllllllllll lllllllll fill���� �����lull fill llllllll���11�11`�1�Illlllll fill IIIII IIIIIIIIIIIUII IIIIIIIIIIIIIII lllllllllllll4l III llllllll lllllllllllllllllllllllllll IIII fill ��� 11111111 IIIII lull lull Illl lull ll l l l� 4 U I I l l ll l l�l l� l � ��� I l l ll till I ll�1 ll�111111 ll l l ll fill� U �r of a of 1 11 IIIII�IIIII��IIIIIIII��IIIIIIIIIIIIIII��IIIII����������IIIIIIIIIIIIIIIIIIII�IIIIIIIIII�IIIIIIIII��IIIIII�IIIIII��IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII��������IIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�����III�IIIII�����IIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIUI�IIIII IIm�Tllllhlllllllll��lllllllllllllllllllllllll ���lllllllll�llllllllllll�llllllllllllllllllllllllll�lllllllllllll�lllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllllll'������������������������������������������������������� Checklist Item Passed Comments Type of Water: Municipal/Well Water True -Well Locations/Separations True Well separation distance True -68' as per variance Depth of Trenches True 12"-18 Length of Each Trench True 2@ 32' System Use Status True 6/30/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 7/28/22 Septic System Partial Approval Remaining Items: -Complete final grade, seed and straw. -Submit final approval letter and certified as-built from the design engineer. 2/8/23 Septic System Approved Conforms as per Plot Plan True Size of tank True 1250 gallon tank Distribution box to Field/Pit True 4"sch40 pvc to Eljen Mats Foundation to Absorption True 10' as per variance InletOutlet Pipes& Baffles True - Filter installed Soil Type: Loam True March 15,2024 Page 2 of 2