Loading...
TAB Report - Hannoush JewelersNortheastern Air Quality, Inc. P.O. Box 3271 Albany, New York 12203 (518) 857-3641 HVAC SYSTEMS TESTING: Project:Hannoush Jewelers Location:Queensbury, New York Architect:KPB Architecture PLLC Clifton Park, New York Engineer: Piping: Sheet Metal:Competitive Advantage Group Albany, New York Date:March 27, 2024 Prepared by:N. Mailly Air Balance Report RKelley@NortheasternAirQuality.com Item Page Certification 3 Standard Abbreviations 4 Air Balance Report Air Moving Equipment 6 Grille, Register & Diffuser Report 7 System Diagrams 9 Table of Contents CERTIFICATION PROJECT: ADDRESS: TESTING AND BALANCING FIRM: CERTIFIED BY:DATE:3/27/2024 SIGNATURE: Robert V. Kelley Hannoush Jewelers Queensbury, New York THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGNED QUANTITIES WHICH EXCEEDS NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB ''PROCEDURAL STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEM'' AND THE PROJECT SPECIFICATIONS. Northeastern Air Quality, Inc. #3159 Page 3 Northeastern Air Quality, Inc. P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 PROJECT: THE FOLLOWING IS A LIST OF STANDARD ABBREVIATIONS WHICH MAY APPEAR IN THIS REPORT: MEANING MEANING A AMPS or AMPERAGE NL NOT LISTED ACH AIR CHANGES PER HOUR NOM NOMINAL AD ACCESS DOOR NOM EFFY NOMINAL EFFICIENCY ADJ ADJUSTABLE NR NOT REQUIRED Ak KINETIC (EFFECTIVE FREE) AREA NS NOT SPECIFIED BG BLAST GATE OBD OPPOSED BLADE DAMPER BHP BRAKE HORSEPOWER OED OPEN END DUCT CALC CALCULATED PF POWER FACTOR CALIBR CALIBRATION or CALIBRATED PH PHASE CD CEILING DIFFUSER Ps STATIC PRESSURE CF CUBIC FEET Pt TOTAL PRESSURE CFM CUBIC FEET PER MINUTE Pv VELOCITY PRESSURE cL CENTERLINE RG RETURN GRILLE CLG CEILING RPM REVOLUTIONS PER MINUTE CR CEILING REGISTER RR RETURN REGISTER CS CIRCUIT SETTER SBD SINGLE BLADE DAMPER CSD CEILING SUPPLY DIFFUSER SD SMOKE CONTROL DAMPER DD DIRECT DRIVE SF SERVICE FACTOR DDC DIRECT DIGITAL CONTROL SMC SHEET METAL CONTRACTOR DISC DISCONNECT SWITCH SP STATIC PRESSURE DISCH DISCHARGE SPS STATIC PRESSURE SENSOR DPR DAMPER SR SUPPLY REGISTER DR PRESSURE DIFFERENTIAL TC TEMPERATURE CONTROL EC END CAP TCC TEMPERATURE CONTROL CONTRACTOR ER EXHAUST REGISTER TCD TEMPERATURE CONTROL DAMPER FL BHP BRAKE HORSEPOWER @ FULL LOAD AMPS TP THERMALLY PROTECTED FLA FULL LOAD AMPS TRAV DUCT TRAVERSE FTR FINNED TUBE RADIATION V VOLTS or VOLTAGE GPM GALLONS PER MINUTE VAR VARIABLE HP HORSEPOWER VBD V-BELT DRIVE LD LINEAR DIFFUSER VD VOLUME DAMPER LF LINEAR FEET (NOMINAL)VEL VELOCITY NA NOT ACCESSIBLE W WATTS or WATTAGE ND NO DAMPER WG WALL GRILLE NDRG NON-DUCTED RETURN GRILLE WMS WIRE MESH SCREEN NG NO GAUGE WR WALL REGISTER NI NOT INSTALLED ZD ZONE DAMPER NIC NOT IN CONTRACT ABBREVIATIONS Hannoush Jewelers ABBREVIATION ABBREVIATION Page 4 of 8 Northeastern Air Quality, Inc. P.O. Box 3271, Albany, NY 12203-0271 (518) 857-3641 3/27/2024 MOTOR NAME- PLATE VOLTS HERTZ 120 60 120 60 DATA EXT. STATIC PRESSURE VOLTS AMPS BHP (calc.)1.17 T1 12.6 7.3 10.0 10.0 1.09 T1 - T2 120 121 T2 - T3 (3 Ph only) - 120 121 -- AIR MOVEMENT EQUIPMENT TEST SHEET SERVICE:Showroom Entry/Breakroom MANUFACTURER:Bryant Bryant MODEL:915SB60100E21A-A 915SB48080E17A-A PROJECT:Hannoush Jewelers TESTED BY:N. Mailly DATE: P.F. SERIAL NUMBER:3019A59068 2319A45327 SYSTEM:F-1 F-2 LOCATION:Attic Attic 0.75 - PHASE 1 1 FL AMPS HP 1.00 - DATE TESTED:3/27/2024 3/27/2024 MANUFACTURER No Access No Access STYLE FRAME ---- FAN RPM - Direct Drive - Direct Drive Direct DriveSHEAVE cL DISTANCE TEST DATA DESIGN ACTUAL DESIGN ACTUAL -- Direct Drive Direct Drive Direct Drive CALCULATED (P.F. x NOM EFFY) * MOTOR SHEAVE STARTER HEATER ELEMENTS 0.72 0.72 BELTS FAN SHEAVE Direct Drive Direct Drive S.F.12.6 1.00 10.0 1.00 NL NL -- NOM EFFY NL NL TOTAL --0.31 TOTAL CFM - OUTLETS 1000 1019 1100 1120 RETURN AIR CFM 1000 913 -363 INLET NL -0.81 NL -0.23 TOTAL CFM - FAN NL -NL - DISCHARGE NL 0.28 NL 0.08 OUTSIDE AIR CFM ---- REMARKS: * NOTE: If P.F. or NOM EFFY are NL, (P.F. x NOM EFFY) = 746Hp/(VAX), where X = 1 if 1 Ph, and 1.73 if 3 Ph T1 - T3 (3 Ph only)-- F.L.A.ACTUAL 0.85 T2 (3 Ph only)-- T3 (3 Ph only)- RPM Page 5 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:Design CFM values not listed on prints. DESIGN INITIAL INTERMEDIATE FINAL % OF NO.Location MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS F-1 1 Showroom 8" x 8"100 Hood 132 Hood 110 110%3/27/24 2 Showroom 8" x 8"100 Hood 132 Hood 105 105%3/27/24 3 Safe Room 8" x 8"100 Hood 107 Hood 110 110%3/27/24 4 Showroom 8" x 8"100 Hood 97 Hood 100 100%3/27/24 4.1 Showroom 8" x 8"100 Hood 88 Hood 93 93%3/27/24 4.2 Workroom 8" x 8"100 Hood 80 Hood 90 90%3/27/24 5 Workroom 8" x 8"100 Hood 119 Hood 110 110%3/27/24 6 Showroom 8" x 8"100 Hood 111 Hood 109 109%3/27/24 7 Showroom 8" x 8"100 Hood 91 Hood 94 94%3/27/24 8 Showroom 8" x 8"100 Hood 95 Hood 98 98%3/27/24 Total 1,000 1,019 102%3/27/24 Return 9 Showroom 22" x 20"1,000 Hood 913 Hood 913 91%3/27/24 F-2 10 Showroom 8" Rnd 75 Hood 86 Hood 82 109%3/27/24 11 Showroom 8" Rnd 75 Hood 78 Hood 81 108%3/27/24 12 Showroom 8" Rnd 75 Hood 61 Hood 75 100%3/27/24 12.5 Attic 6" Rnd 75 Hood 88 Hood 82 109%3/27/24 13 Entry 8" Rnd 125 Hood 173 Hood 130 104%3/27/24 14 Entry 6" Rnd 75 Hood 73 Hood 73 97%3/27/24 15 Attic 6" x 8"75 Hood 73 Hood 73 97%3/27/24 16 Entry 8" Rnd 125 Hood 163 Hood 128 102%3/27/24 17 Entry 6" Rnd 75 Hood 79 Hood 79 105%3/27/24 N. Mailly 3/27/2024 Hannoush Jewelers Duct Size Page 6 Northeastern Air Quality, Inc.GRILLE, REGISTER & DIFFUSER REPORT P.O. Box 3271, Albany, NY 12203-0271 PROJECT: (518) 857-3641 TESTED BY:DATE: REMARKS:Design CFM values not listed on prints. DESIGN INITIAL INTERMEDIATE FINAL % OF NO.Location MODEL Ak VEL CFM VEL CFM VEL CFM VEL CFM DES DATE REMARKS N. Mailly 3/27/2024 Hannoush Jewelers Duct Size 17.5 Attic 6" Rnd 75 Hood 80 Hood 80 107%3/27/24 18 Breakroom 8" Rnd 75 Hood 40 Hood 70 93%3/27/24 19 Breakroom 6" Rnd 75 Hood 57 Hood 71 95%3/27/24 20 Toilet 6" Rnd 25 Hood 58 Hood 27 108%3/27/24 21 Front Window 6" Rnd 75 Hood 55 Hood 69 92%3/27/24 Total 1,100 1,120 102%3/27/24 Return 22 Showroom 10" x 14"-Hood 363 Hood 363 -3/27/24 23 Entry 8" x 24"-Hood 484 Hood 484 -3/27/24 24 Attic 6" x 12"0.41 -432 177 432 177 -3/27/24 Total 1,100 1,024 93%3/27/24 EF-1 25 Toilet 103 8" Rnd 75 Hood 74 Hood 74 99%3/27/24 EF-2 26 Toilet 108A 8" Rnd 75 Hood 75 Hood 75 100%3/27/24 Page 7 1st Floor 2nd Floor SYSTEM DIAGRAM Hannoush Jewelers Page 8