Loading...
INSPECTION WORKSHEET 04042024 INSPECTION WORKSHEET Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: CC-0728-2023 Case Module: Permit Inspection Date: April 04, 2024 Inspection Status: Reinspect Inspector: John O'Brien Inspection Type: Commercial Final Job Address: 170 LUZERNE RD , Parcel Number: Contact Type Company Name Name Primary Owner N/A Nick Carlino Granted Permission N/A Nick Carlino Checklist Item Status Building Inspector notes 2/29/24 Preliminary Commercial Final Inspection Not Approved see punchlist of remaining items below. 1) All Kraft faced insulation above drop ceiling in front office area and 2nd floor mechanical room wall and ceiling needs to be covered with FSK25 Foil paper. The foil paper has a 15 minute thermal rating. COMPLETE 2) Install all passage doors and remove residential door thresholds throughout first and second floor of office to eliminate tripping hazards. COMPLETE 3) Complete handicap bathroom. 4) In warehouse cover foil faced foam insulation with metal wall siding. COMPLETE 5) Entry needs to be ramped with asphalt when paving is done out front. Bring it up flush with door threshold and feather it out blending in with parking area paving. 6) Provide a check writing counter in reception area no higher than 34” can be a desk or something you attach to wall in reception area. COMPLETE 7) Complete all fire marshal items. COMPLETE 8) Complete exterior finish outside of new window. COMPLETE 9) Install drop ceiling in front office and reception areas. COMPLETE FAIL Chimney and B vent, direct vent location PASS Chimney rain cap installed PASS Exterior finish of building PASS Step risers 7 inches max and treads 11 inches minimum PASS Doors 36 inches with Lever Handle and or Panic Hardware, if required Front entrance will be ramped up and feathered out when the asphalt paving is done in May 2024. FAIL Exits At Grade Or Platform 36 inches (w) x 44 inches (l) Front entrance will be ramped up and feathered out when the asphalt paving is done in May 2024. FAIL Floor Bathroom Watertight Other Floors Okay PASS Pressure relief valve, heat trap and water temp 110 deg or less Hot water not turned on working on waterlines will recheck tomorrow. FAIL Pressure relief valve down spout within 6 inches of floor PASS Lag top plates and bottom plates of steel columns Gas furnace shut off PASS HVAC vent terminal 10 feet from lot line and openings PASS HC toilet flush handle on open side of water closet PASS HC side and rear grab bars 36 inches above floor PASS HC vertical grab bar 18 inches minimum high PASS HC vertical grab bar 39 inches from floor and corner PASS HC rear grab bar 36 inches with 24 inches to open side PASS HC mirrors 40 inches above floor to bottom of glass PASS HC sinks 34 inches above floor PASS Low flow toilet 1.3 gallons per flushing cycle PASS HC bathroom signage PASS HC parking lot signage Handicap Parking and No Parking Sign to be installed in May 2024 when asphalt paving is done. FAIL HC parking striping Handicap parking and parking lot striping to be completed after parking lot asphalt paving is completed in May 2024 FAIL Universal symbol of access displayed FAIL Handicapped service counters 34 inches max from floor PASS Bollard Protection:4 feet on center, 3 feet above ground, required in front of gas meters N/O Final electrical and flex gas piping bonded PASS Building number or tenant address on building or drive Bldg Access All Sides 20ft Drivable Surface PASS Site plan or variance approval inspection FAIL Ok to issue temporary certificate of occupancy FAIL Ok to issue certificate of occupancy FAIL John O'Brien Director of Building & Codes