INSPECTION WORKSHEET 04112024
INSPECTION WORKSHEET
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number: CC-0013-2023 Case Module: Permit
Inspection Date: April 11, 2024 Inspection Status: Failed
Inspector: Mark Smith Inspection Type: Commercial Final
Job Address: 78 MAIN ST
, Parcel Number:
Contact Type Company Name Name
Owner 78-80 Main Street LLC
Contractor Foothills Builders
Architect Rucinski Hall Architecture
Checklist Item
Status
Building Inspector notes
4/11/24 final inspection for mixed use building not approved, please
address the items listed below and call for recheck when ready.
- submit a letter of substantial completion from both the architect and
structural engineer stating that the project was completed in accordance
with the approved plans and specifications
-each door at the rental apartments should be self closing and latch
-verify hot water is operational
-submit blower door test results for each apartment type and for the
commercial space at first floor
-all exposed steel at first floor ceilings will need to covered with 2 layers
of 5/8 fire code Sheetrock.
-complete Sheetrock at convenience store bathroom ceiling/ plumbing
chase as discussed on site.
-a second layer of 5/8 Sheetrock is required at the first floor front soffit,
- complete fire caulking at first floor ceilings
- a double layer of 5/8 Sheetrock is required or the bottom side of both
stair ways.
- a final inspection and sign off from zoning department will be required.
-complete Fire Marshals items
N/O
Chimney and B vent, direct vent location
Chimney rain cap installed
3 inches vent stack through roof - 18
inches minimum exposed
Roof complete
Exterior finish of building
Grade Complete, 6 in 10ft or Equivalent
Wood deck 2 feet or more from grade
diagonal bracing required
Interior and exterior guardrails 42 inches
platforms and decks
Interior and exterior balusters 4 inch max
spacing platform and decks
Stair rail 34 inches–38 inches high on
both sides of stairway, 12 inches beyond
top and bottom of stairs
Step risers 7 inches max and treads 11
inches minimum
Vestibules for exit doors greater than
3000 sq. ft
Exterior lighting with daylight shut off
Doors 36 inches with Lever Handle and
or Panic Hardware, if required
Exits At Grade Or Platform 36 inches (w)
x 44 inches (l)
Gas Shut-off Exposed and Regulator 12
inches min above grade
Floor Bathroom Watertight Other Floors
Okay
Backflow preventers where required
Pressure relief valve, heat trap and water
temp 110 deg or less
Pressure relief valve down spout within 6
inches of floor
Hot water drain pan to indirect waste line
Outside spigots have air gap
Lag top plates and bottom plates of steel
columns
Boiler and Furnace Enclosures Fire
Extinguishing System
Low water shut off for boilers
Gas furnace shut off
HVAC vent terminal 10 feet from lot line
and openings
Oil furnace shut off at entrance to furnace
area
Propane Tank setbacks from property
lines and structure
Stockroom, storage, receiving and
shipping room fire separation if required
3/4 hour corridor doors and closers
Firewalls, 2 Hr, 3 Hr and fire dampers and
fire doors
Ceiling fire stopping, 3,000 sq. ft. wood
frame
Attic Access 30 inches x 20 inches x 30
inches (h)
Pull down stairs boxed out and insulated
Attic access gasketed
Crawl space and knee wall access
insulated and gasketed
Attic access insulation R-value must
equal ceiling R- value
Foam in basement and attics covered
with thermal barrier
Smoke vents or fans, if required
Hydraulic elevators non comb. shaft.
Plumbing requirements for elevator pit
Hydraulic Elevators oil separator required
unless there is an alarm
Elevator shaft sealed
HC toilet flush handle on open side of
water closet
HC side and rear grab bars 36 inches
above floor
HC grab bar: 42 inches side, 12 inches
from corner
HC vertical grab bar 18 inches minimum
high
HC vertical grab bar 39 inches from floor
and corner
HC rear grab bar 36 inches with 24
inches to open side
HC mirrors 40 inches above floor to
bottom of glass
HC sinks 34 inches above floor
Low flow toilet 1.3 gallons per flushing
cycle
HC bathroom signage
HC parking lot signage
HC parking striping
Universal symbol of access displayed
Public toilet room handicapped
accessible
Handicapped service counters 34 inches
max from floor
HC Ramps that are 6 inches or more
need handrails
HC Ramps need 4 inches toe kick on
each side of ramp
HC Ramps need 12 inches extension at
top and bottom
HC Individual storage units, 5 percent of
the total required
Active listening system and signed
assembly space
Bollard Protection:4 feet on center, 3 feet
above ground, required in front of gas
meters
Bollard Protection: 15 inch footings and 3
feet below grade
Final electrical and flex gas piping
bonded
Occupancy sensor lighting control
CSST and other piping in conduit if
buried, if required
Final survey
As built septic system layout if required
Public sewer sign off
Building number or tenant address on
building or drive
Water fountain or cooler
Handicapped water cooler installed
Bldg Access All Sides 20ft Drivable
Surface
Engineer or architect approval
Site plan or variance approval inspection
Blower door test
Elevator hoistways pressurized
Electronic as builts
HVAC air balancing report
Special inspections
Ok to issue temporary certificate of
occupancy
Ok to issue certificate of occupancy
Mark Smith
Code Enforcement Officer