Loading...
INSPECTION WORKSHEET 04162024 INSPECTION WORKSHEET Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: RC-0275-2023 Case Module: Permit Inspection Date: April 16, 2024 Inspection Status: Reinspect Inspector: Charles Dyer Inspection Type: Residential Final Job Address: 81 ASSEMBLY POINT RD , Parcel Number: Contact Type Company Name Name Owner N/A G. THOMAS MOYNIHAN JR Contractor J. Clarke Constructiion Architect Flynn Design Studios LLC Owner N/A Joan Moynihan Checklist Item Status Building Inspector notes PASS 4 inch min building number address visible from road FAIL Chimney height, B vent, direct vent location PASS Chimney rain cap installed PASS Fresh air intake PASS Fresh air supply 3 feet from grade PASS 3 inch plumbing vent through roof, minimum 18 inches PASS Outside spigots have air gap PASS Roof complete PASS Exterior finish complete PASS Platform at all exterior doors provide temp stairs at patio FAIL Handrail required with 4 or more risers PASS Guard at stairwell at 34 inches or more PASS Window guards req at less than 2' above floor and 6' above grade PASS Handrail termination at newell post or wall PASS Interior and exterior handrails 34" to 38" high PASS Grade away from foundation sloping 6 inches in the first 10 feet PASS 6 inch clearance to sill plate from grade PASS HVAC vent terminal 10 feet from lot line and openings PASS Interior privacy doors and trim required PASS Exterior main entrance door min 36" wide PASS Bathroom and Kitchen floors must be watertight PASS Low flow toilet 1.3 gallon per flushing cycle PASS Safety glazing required within 5 feet of tub and shower PASS Smoke detectors are min of 3 feet horizontally from opening of bathroom PASS Smoke Detectors are required on every level and in every bedroom PASS Smoke Detectors are required outside every bedroom area PASS Smoke Detectors have battery back up provide letter of certification from Mahoney notifier PASS Smoke detectors are interconnected PASS Carbon monoxide detectors are within 10 ft of all sleeping areas PASS Carbon monoxide detectors are required on all levels with gas appliances (i.e. furnace) PASS Heat detector required in attached garage PASS Attic access 22 inches x 30 inches minimum with 30 inch high clearance PASS Attic access insulation R-value must equal ceiling R- value foam at ceiling N/O Attic access gasketed PASS Foam in basement and attics covered with thermal barrier PASS Knee wall and crawl space areas require 18 inches x 24 inches access PASS Crawl space and knee wall access insulated and gasketed PASS Bathroom fans required, if no window PASS All plumbing fixtures complete PASS Backflow preventors where required PASS Foundation insulation to basement floor PASS Energy sticker on elec. panel, R values and heating systems FAIL All Hot Water Systems R 3 on 3/4 inches or larger piping PASS Duct work sealed properly PASS Intake openings for HVAC PASS Range Hood 400 or more cfm make up air required PASS Blower door test certification FAIL HRV or ERV installed per bedroom requirements PASS Furnace shut off within 30 ft. or within line of site PASS Propane tank proper setback from property line or structure PASS Furnace and hot water heater operating PASS Low water shut off required for boiler PASS Pressure relief valve, heat trap, water temp 110 degrees or less PASS Pressure relief valve down spout within 6 inches of floor PASS 1/2 inch Gypsum or House Wall and Gable PASS 5/8 inch Type X with living space above PASS 20 minute fire door and self-closing hardware PASS Seals on garage doors, esp. wood PASS Basement stairs closed rise greater than 4 inches PASS Basement wall insulation R- value verified 5 ft crawl area N/O Jack posts in basement lagged at top and bottom tap con bases FAIL Fireblocking at fl joist 80 s.f. or less Garage floor pitched PASS 1/2" Gypsum board req. in basement for framing if 2" x 8" or TJI/Floor Trusses PASSN/O Gas log in sealed or glass enclosure PASS Fin elect; energy saving light bulbs 90 percent FAIL Final survey plot plan FAIL Arc fault breaker habitable spaces Flex gas pipe bonding As built septic system FAIL Site plan or variance approval inspection FAIL Truss ID signage installed at electrical meter provide sticker for TJI’s FAIL Electronic as builts Ok to issue temporary certificate of occupancy CONDITIONS: provide final electric 2. Engineer septic asbuilt 3. Fuji maintenance contract agreement 4. Site plan certification 5. Final survey 6. Blower door results— OK to issue temp CO when final electric and blower door received 4/16/24 PASSN/O Ok to issue certificate of occupancy FAIL Charles Dyer Code Enforcement Officer